File #: 170018    Version:
Type: Resolution Status: Passed
File created: 4/18/2017 In control: COMMON COUNCIL
On agenda: Final action: 5/9/2017
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $1,348,600 for a total estimated cost of $1,567,000.
Sponsors: THE CHAIR
Indexes: ASSESSMENTS, PUBLIC IMPROVEMENTS
Attachments: 1. Cover Letter, 2. Official Notice, 3. Notice Published on 5-25-17
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
5/19/20171 MAYOR SIGNED   Action details Meeting details Not available
5/9/20171 COMMON COUNCIL ADOPTEDPass14:0 Action details Meeting details Not available
4/26/20171 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Mary Dziewiontkoski - DPW 1st Aldermanic District N. 42nd St. – W. Thurston Ave. to W. Florist Ave. (ST211170115): Install traffic calming speed hump(s). Ald. Donovan moved approval. (Prevailed 5-0) 2nd Aldermanic District W. Carmen Ave. – N. 72nd St. to N. 73rd St. (ST211170130): Install traffic calming speed hump(s). Ald. Bauman moved approval. (Prevailed 5-0) N. 75th St. – W. Beckett Ave. to W. Marion St. (ST211170184): Install traffic calming speed hump(s). Todd Miller, 2nd District Legislative Assistant, stated Ald. Johnson is in support. Robert Husar 4272 N 75th St. stated he is in support of the speed hump. Ald. Bohl moved approval. (Prevailed 5-0) 3rd Aldermanic District N. Maryland Ave. – N. Prospect Ave. to E. Newberry Blvd. (ST211160108): Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (11-foot width of tree border area), and grading. Ald. Kovac stated there were 14 in favor and 9 opposed. Ron Steiner 2724 N Maryland Ave. stated he has concerns about the bill. Carmela Avery 2712 N Maryland Ave. stated she has concerns about the bill. Ald. Kovac moved approval. (Prevailed 5-0) 5th Aldermanic District Alley between W. Auer Ave., W. Concordia Ave., N. 87th St., and N. 88th St. (ST212010143): Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, storm drainage facilities, and permeable pavement where necessary. Ald. Bohl stated 25 property owners in favor and 5 opposed. Ald. Bohl moved approval. (Prevailed 5-0) Alley between W. Chambers St., W. Locust St., N. 76th St., and N. 77th St. (ST212060105): Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, storm drainage facilities, and permeable pavement where necessary. Ald. Bohl stated 15 residents in favor and 8 opposed. Ald. Bohl moved approval. (Prevailed 5-0) 6th Aldermanic District N. 6th St. – W. Fiebrantz Ave. to a point north of W. Fiebrantz Ave. (ST211120101): Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (7-foot width of tree border area), and grading. Mary Dziewiontkoski - DPW stated Ald. Coggs in support. Ald. Donovan moved approval. (Prevailed 5-0) 8th Aldermanic District S. 30th St. – W. Lapham Blvd. to W. Orchard St. (ST211170189): Install traffic calming speed hump(s). Ald. Donovan moved approval. (Prevailed 5-0) S. 31st St. – W. Grant St. to W. Becher St. (ST211170188): Install traffic calming speed hump(s). James Gack 2113 S 31st St. stated he is in support of speed bump. Ald. Donovan moved approval. (Prevailed 4-0) 9th Aldermanic District W. Woolworth Ave. – 400 feet m/l west of N. 51st St. to 200 feet m/l west of N. 56th St. (ST211150104): Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (5-foot width of tree border area), and grading. Dan Fraison 5320 W Woolworth Ave., 5135 W Mill Rd., 5202 W Woolworth Ave. stated he is in support of road but not sidewalk on the north side of the street. David Rackum 5307 W Mill Rd. stated he is in support of road but not sidewalk on the north side of the street. Ted Mcnamara 5519 W Woolworth Ave. stated he is in support of project and agrees that the sidewalk is not needed on the north side. Mary Dziewiontkoski - DPW stated Ald. Lewis is in support of not installing sidewalk on the north side of the street and installing on the south side as necessary. Ald. Bauman moved approval as amended. (Prevailed 5-0) N. 84th St. – W. Brentwood Ave. to W. Green Tree Rd. (ST211170183): Install traffic calming speed table(s). Dave Ackenbach 6738 N 84th St. stated he dispute that his property will benefit from this project. Joseph Blakeman - DPW stated Ald. Lewis is in support. Ald. Bauman moved approval. (Prevailed 5-0)
Pass5:0 Action details Meeting details Video Video
4/18/20170 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

Number

170018

Version

SUBSTITUTE 1

Reference

150115

Sponsor

THE CHAIR

Title

Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $1,348,600 for a total estimated cost of $1,567,000.

Analysis

This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held.  The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements.  The City cost of these projects approved by this resolution is estimated to be $1,348,600.  The total estimated cost of these projects is $1,567,000.

Body

Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

 

1st Aldermanic District

 

N. 42nd St. - W. Thurston Ave. to W. Florist Ave. (ST211170115):  Install traffic calming speed hump(s).  (Assessable Reconstruction Paving Fund -- $18,000; Nonassessable Reconstruction Paving Fund -- $2,000).  The total estimated cost for this project including the requested amount is $20,000.  This project is anticipated to be completed during the 2017 construction season.

 

2nd Aldermanic District

 

W. Carmen Ave. - N. 72nd St. to N. 73rd St. (ST211170130):  Install traffic calming speed hump(s).  (Assessable Reconstruction Paving Fund -- $3,400; Nonassessable Reconstruction Paving Fund -- $3,600).  The total estimated cost for this project including the requested amount is $7,000.  This project is anticipated to be completed during the 2017 construction season.

 

N. 75th St. - W. Beckett Ave. to W. Marion St. (ST211170184):  Install traffic calming speed hump(s).  (Assessable Reconstruction Paving Fund -- $8,000; Nonassessable Reconstruction Paving Fund -- $2,000).  The total estimated cost for this project including the requested amount is $10,000.  This project is anticipated to be completed during the 2017 construction season.

 

3rd Aldermanic District

 

N. Maryland Ave. - N. Prospect Ave. to E. Newberry Blvd. (ST211160108) File Number 150115:  Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (11-foot width of tree border area), and grading.  (Assessable Reconstruction Paving Fund -- $95,000; Nonassessable Reconstruction Paving Fund -- $410,000).  The total estimated cost for this project including the requested amount is $550,000.  This project is anticipated to be completed during the 2017 construction season.

 

5th Aldermanic District

 

Alley between W. Auer Ave., W. Concordia Ave., N. 87th St., and N. 88th St. (ST212010143) File Number 150846:  Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, storm drainage facilities, and permeable pavement where necessary.  (Assessable Alley Paving Fund -- $50,000; Nonassessable Alley Paving Fund -- $64,000).  The total estimated cost for this project including the requested amount is $180,000.  This project is anticipated to be completed during the 2017 construction season.

 

Alley between W. Chambers St., W. Locust St., N. 76th St., and N. 77th St. (ST212060105) File Number 141118:  Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, storm drainage facilities, and permeable pavement where necessary.  (Assessable Alley Paving Fund -- $50,000; Nonassessable Alley Paving Fund -- $64,000).  The total estimated cost for this project including the requested amount is $180,000.  This project is anticipated to be completed during the 2017 construction season.

 

6th Aldermanic District

 

N. 6th St. - W. Fiebrantz Ave. to a point north of W. Fiebrantz Ave. (ST211120101) File Number 121751:  Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (7-foot width of tree border area), and grading.  (Assessable Reconstruction Paving Fund -- $5,600; Nonassessable Reconstruction Paving Fund -- $61,000).  The total estimated cost for this project including the requested amount is $80,000.  This project is anticipated to be completed during the 2017 construction season.

 

8th Aldermanic District

 

S. 30th St. - W. Lapham Blvd. to W. Orchard St. (ST211170189):  Install traffic calming speed hump(s).  (Assessable Reconstruction Paving Fund -- $8,000; Nonassessable Reconstruction Paving Fund -- $2,000).  The total estimated cost for this project including the requested amount is $10,000.  This project is anticipated to be completed during the 2017 construction season.

 

S. 31st St. - W. Grant St. to W. Becher St. (ST211170188):  Install traffic calming speed hump(s).  (Assessable Reconstruction Paving Fund -- $8,000; Nonassessable Reconstruction Paving Fund -- $2,000).  The total estimated cost for this project including the requested amount is $10,000.  This project is anticipated to be completed during the 2017 construction season.

 

9th Aldermanic District

 

W. Woolworth Ave. - 400 feet m/l west of N. 51st St. to 200 feet m/l west of N. 56th St. (ST211150104) File Number 161438:  Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, no new walk installation, sodding (5-foot width of tree border area), and grading.  (Assessable Reconstruction Paving Fund -- $67,000; Nonassessable Reconstruction Paving Fund -- $375,000).  The total estimated cost for this project including the requested amount is $470,000.  This project is anticipated to be completed during the 2017 construction season.

 

N. 84th St. - W. Brentwood Ave. to W. Green Tree Rd. (ST211170183):  Install traffic calming speed table(s).  (Assessable Reconstruction Paving Fund -- $22,000; Nonassessable Reconstruction Paving Fund -- $28,000).  The total estimated cost for this project including the requested amount is $50,000.  This project is anticipated to be completed during the 2017 construction season.

 

; and

 

Whereas, The report of the Commissioner of Public Works has been filed with the City Clerk; and

 

Whereas, Notices have been sent to all interested persons and public hearings held; now, therefore, be it

 

Resolved, By the Common Council of the City of Milwaukee, that the Commissioner of Public Works’ Report, as amended at said Public Hearing, is approved and the properties therein identified are benefited; and, be it

 

Further Resolved, That said Commissioner of Public Works is authorized and directed to proceed with said work in accordance with said report pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That the proper departments take such action as is required of them to assess the abutting or adjacent properties and collect such assessment in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts; and, be it

 

Further Resolved, That the projects do not involve any parcels of agricultural land which are eligible for deferred special assessments under the provisions of Section 14.30 of the Milwaukee City Charter; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That projects:  N. 42nd St. (ST211170115), W. Carmen Ave. (ST211170130), N. 75th St. (ST211170184), N. Maryland Ave. (ST211160108), Alley W. Auer Ave. (ST212010143), Alley W. Chambers St. (ST212060105), N. 6th St. (ST211120101), S. 30th St. (ST211170189), S. 31st St. (ST211170188), W. Woolworth Ave. (ST211150104), and N. 84th St. (ST211170183) will be billed after January 1, 2019, but not before 12 months after the project contract has been completed.

 

 

Requestor

Infrastructure Services Division

Drafter

Mary Dziewiontkoski/Denise Reinholtz

Afr 11

04/27/2017