powered help
header-left header-center header-right
File #: 161694    Version:
Type: Resolution Status: Passed
File created: 3/28/2017 In control: COMMON COUNCIL
On agenda: Final action: 4/18/2017
Effective date:    
Title: Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $309,000 for a total estimated cost of these projects being $2,362,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
4/27/20171 MAYOR SIGNED   Action details Meeting details Not available
4/18/20171 COMMON COUNCIL ADOPTEDPass14:0 Action details Meeting details Video Video
4/6/20171 PUBLIC WORKS COMMITTEE SUBSTITUTED

Minutes note: Proposed Substitute A
Pass4:0 Action details Meeting details Video Video
4/6/20171 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Mary Dziewiontkoski - Department of Public Works
Pass4:0 Action details Meeting details Not available
3/28/20170 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

 

Number

161694

Version

Substitute 1

Sponsor

THE CHAIR

Title

Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $309,000 for a total estimated cost of these projects being $2,362,000.

Analysis

This resolution authorizes engineering studies on projects which by City Charter are nonassessable.  After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council.  The City cost for engineering these projects is estimated to be $309,000 with the total cost estimated to be $2,362,000.

Body

Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:

 

1st Aldermanic District

 

North 27th Street Bioretention Maintenance:  N. 27th St. - W. Capitol Dr. to W. Roosevelt Dr. (SM499170101):  (Storm Water Quality - Nonassessable Water Quality Projects to meet TMDL Requirements -- $1,000).  The total estimated cost for this project including the requested amount is $46,000.  This project is anticipated to be completed during the 2017 construction season.

 

N. 31st St. (extended) - W. Rohr Ave. (extended) to 175 feet m/l north of W. Rohr Ave. (SM495170019):  Relaying sanitary sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $10,000).  The total estimated cost for this project including the requested amount is $70,000.  This project is anticipated to be completed during the 2018 construction season.

 

N. 41st St. - W. Hampton Ave. to W. Stark St. (SM495170020):  Relaying sanitary sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $161,000.  This project is anticipated to be completed during the 2018 construction season.

 

6th Aldermanic District

 

W. Finn Pl. - 125 feet m/l west of N. Teutonia Ave. to N. 20th St. (SM495170021):  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $100,000.  This project is anticipated to be completed during the 2018 construction season.

 

W. Groeling Ave. - N. 13th St. to N. 14th St. (SM495170022):  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $152,000.  This project is anticipated to be completed during the 2018 construction season.

 

E. North Ave. at N. Palmer St. (ST211170194):  Install traffic calming devices - curb push out.  (Nonassessable Reconstruction Paving Fund -- $10,000).  The total estimated cost for this project including the requested amount is $60,000.  This project is anticipated to be completed during the 2017 construction season.

 

N. Teutonia Ave. - 175 feet southeast of W. Ring St. to W. Capitol Dr. (Various Locations) (SM495170027):  Relaying combined sewer and storm sewer lining.  (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $675,000.  This project is anticipated to be completed during the 2018 construction season.

 

N. 11th St. - W. Keefe Ave. to W. Finn Pl. (SM495170016):  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $126,000.  This project is anticipated to be completed during the 2018 construction season.

 

N. 14th St. - 380 feet m/l south of W. Ring St. to W. Concordia Ave. (SM495170017):  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $176,000.  This project is anticipated to be completed during the 2018 construction season.

 

N. 18th St. - N. Teutonia Ave. to W. Keefe Ave. (SM495170025):  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $178,000.  This project is anticipated to be completed during the 2018 construction season.

 

N. 19th St. - N. Teutonia Ave. to W. Finn Pl. (SM495170026):  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $128,000.  This project is anticipated to be completed during the 2018 construction season.

 

7th Aldermanic District

 

W. Concordia Ave. - N. 24th St. to alley west of N. 24th St. (SM495170024):  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $10,000).  The total estimated cost for this project including the requested amount is $48,000.  This project is anticipated to be completed during the 2018 construction season.

 

N. 44th St. - W. Fiebrantz Ave. to W. Hope Ave. (SM495170023):  Relaying storm sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $147,000.  This project is anticipated to be completed during the 2018 construction season.

 

11th Aldermanic District

 

S. 57th St. - 160 feet m/l north of W. Holt Ave. to Lyons Creek Outfall (SM495170018):  Relaying storm sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $85,000.  This project is anticipated to be completed during the 2018 construction season.

 

12th Aldermanic District

 

S. Water St. - South of E. Florida St. (ST211170195):  Railroad track removal.  Replace pavement as necessary.  (Nonassessable Reconstruction Paving Fund -- $5,000).  The total estimated cost for this project including the requested amount is $60,000.  This project is anticipated to be completed during the 2017 construction season.

 

Various Aldermanic Districts

 

Moveable Bridge Upgrades (BR100170106):  Moveable Bridge mechanical, hydraulic and electrical upgrades.  (City Share Non-assessable Structure Fund -- $150,000).  The total estimated cost for this project is $150,000.  This project is anticipated to be completed during the 2017-2018 construction season.

 

Whereas, Improvement projects have been cancelled for the following described improvements:

 

Various Aldermanic Districts

 

2017 Sanitary Manhole Rehabilitation (SM494170001):  (Infiltration/Inflow Reduction Fund - Remaining balance estimated to be $20,000).

 

;and, be it

 

Further Resolved, That all City Departments are authorized to perform engineering, surveys, plan preparation, and determine an estimated cost thereof; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 

Requestor

Infrastructure Services Division

Drafter

Mary Dziewiontkoski/Denise Reinholtz

Npr 10

03/31/2017