File #: 161562    Version:
Type: Resolution Status: Passed
File created: 3/1/2017 In control: COMMON COUNCIL
On agenda: Final action: 3/28/2017
Effective date:    
Title: Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $1,046,000 for a total estimated cost of these projects being $13,240,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
4/3/20171 MAYOR SIGNED   Action details Meeting details Not available
3/28/20171 COMMON COUNCIL ADOPTEDPass15:0 Action details Meeting details Not available
3/8/20171 PUBLIC WORKS COMMITTEE SUBSTITUTED

Minutes note: Proposed Substitute A
Pass5:0 Action details Meeting details Video Video
3/8/20171 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Mary Dziewiontkoski - Department of Public Works
Pass5:0 Action details Meeting details Not available
3/1/20170 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

 

Number

161562

Version

Substitute 1

Sponsor

THE CHAIR

Title

Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $1,046,000 for a total estimated cost of these projects being $13,240,000.

Analysis

This resolution authorizes engineering studies on projects which by City Charter are nonassessable.  After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council.  The City cost for engineering these projects is estimated to be $1,046,000 with the total cost estimated to be $13,240,000.

Body

Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:

 

1st Aldermanic District

 

W. Douglas Ave. - W. Kaul Ave. to N. Sherman Blvd. (WT410180634):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $2,000; Nonassessable Water Fund Budget Line 6410 -- $13,000).  The total estimated cost for this project including the requested amount is $105,000.  This project is anticipated to be completed during the 2018 construction season.

 

N. Teutonia Ave. - 100 feet south of W. Carmen Ave. to W. Bobolink Ave. (WT410180631):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $3,000; Nonassessable Water Fund Budget Line 6410 -- $22,000).  The total estimated cost for this project including the requested amount is $315,000.  This project is anticipated to be completed during the 2018 construction season.

 

N. 52nd St. - W. Custer Ave. to W. Silver Spring Dr. (WT410180623):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $3,000; Nonassessable Water Fund Budget Line 6410 -- $22,000).  The total estimated cost for this project including the requested amount is $325,000.  This project is anticipated to be completed during the 2018 construction season.

 

2nd Aldermanic District

 

W. Beckett Ave. - N. 73rd St. to W. Fiebrantz Ave. (WT410180003):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $2,000; Nonassessable Water Fund Budget Line 6410 -- $13,000).  The total estimated cost for this project including the requested amount is $140,000.  This project is anticipated to be completed during the 2018 construction season.

 

W. Fiebrantz Ave. - N. 72nd St. to W. Beckett Ave. (WT410180004):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $2,000; Nonassessable Water Fund Budget Line 6410 -- $13,000).  The total estimated cost for this project including the requested amount is $155,000.  This project is anticipated to be completed during the 2018 construction season.

 

W. Perkins Pl. - W. Beckett Ave. to W. Appleton Ave. (WT410180005):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $2,000; Nonassessable Water Fund Budget Line 6410 -- $13,000).  The total estimated cost for this project including the requested amount is $70,000.  This project is anticipated to be completed during the 2018 construction season.

 

N. 57th St. - W. Villard Ave. to W. Sheridan Ave. (WT410180624):  Relaying water   main.  (Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $31,000).  The total estimated cost for this project including the requested amount is $515,000.  This project is anticipated to be completed during the 2018 construction season.

 

N. 73rd St. - W. Capitol Dr. to W. Congress St. (WT410180002):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $36,000).  The total estimated cost for this project including the requested amount is $645,000.  This project is anticipated to be completed during the 2018 construction season.

 

4th Aldermanic District

 

W. Wisconsin Ave. - N. 20th St. to N. 35th St. (WT410170012):  Hydrant and water main alteration.  (Nonassessable Water Fund Budget Line 5010 -- $2,000; Nonassessable Water Fund Budget Line 6410 -- $13,000).  The total estimated cost for this project including the requested amount is $100,000.  This project is anticipated to be completed during the 2017 construction season.

 

4th and 8th Aldermanic District

 

W. St. Paul Ave. - N. 13th St. to N. 17th St. (WT410180615):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $3,000; Nonassessable Water Fund Budget Line 6410 -- $27,000).  The total estimated cost for this project including the requested amount is $400,000.  This project is anticipated to be completed during the 2018 construction season.

 

5th Aldermanic District

 

W. Auer Ave. - N. 84th St. to N. 85th St. (WT410180609):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $2,000; Nonassessable Water Fund Budget Line 6410 -- $13,000).  The total estimated cost for this project including the requested amount is $90,000.  This project is anticipated to be completed during the 2018 construction season.

 

W. Elmore Ave. - N. Willis Pl. to N. 94th St. (WT410180610):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $2,000; Nonassessable Water Fund Budget Line 6410 -- $13,000).  The total estimated cost for this project including the requested amount is $65,000.  This project is anticipated to be completed during the 2018 construction season.

 

W. Fiebrantz Ave. - N. 88th St. to N. 89th St. (WT410180603):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $2,000; Nonassessable Water Fund Budget Line 6410 -- $13,000).  The total estimated cost for this project including the requested amount is $85,000.  This project is anticipated to be completed during the 2018 construction season.

 

W. Glendale Ave. - N. 84th St. to N. 87th St. (WT410180639):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $2,000; Nonassessable Water Fund Budget Line 6410 -- $18,000).  The total estimated cost for this project including the requested amount is $265,000.  This project is anticipated to be completed during the 2018 construction season.

 

W. Herbert Ave. - W. Hampton Ave. to N. 90th St. (WT410180640):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $3,000; Nonassessable Water Fund Budget Line 6410 -- $22,000).  The total estimated cost for this project including the requested amount is $390,000.  This project is anticipated to be completed during the 2018 construction season.

 

W. Ruby Ave./N. 88th St. - N. 85th St. to W. Lawrence Ave. (WT410180641):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $3,000; Nonassessable Water Fund Budget Line 6410 -- $22,000).  The total estimated cost for this project including the requested amount is $300,000.  This project is anticipated to be completed during the 2018 construction season.

 

N. 84th St. - W. Hope Ave. to W. Marion St. (WT410180605):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $2,000; Nonassessable Water Fund Budget Line 6410 -- $13,000).  The total estimated cost for this project including the requested amount is $170,000.  This project is anticipated to be completed during the 2018 construction season.

 

N. 87th St. - W. Arden Pl. - W. Palmetto Ave. (WT410180638):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $2,000; Nonassessable Water Fund Budget Line 6410 -- $13,000).  The total estimated cost for this project including the requested amount is $85,000.  This project is anticipated to be completed during the 2018 construction season.

 

N. 87th St. - W. Capitol Dr. to W. Fiebrantz Ave. (WT410180604):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $2,000; Nonassessable Water Fund Budget Line 6410 -- $13,000).  The total estimated cost for this project including the requested amount is $175,000.  This project is anticipated to be completed during the 2018 construction season.

 

7th Aldermanic District

 

W. Marion St. - N. 50th St. to N. 51st Blvd. (WT410180629):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $2,000; Nonassessable Water Fund Budget Line 6410 -- $13,000).  The total estimated cost for this project including the requested amount is $70,000.  This project is anticipated to be completed during the 2018 construction season.

 

W. Vance Pl. - N. 56th St. to W. Fond du Lac Ave. (WT410180635):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $2,000; Nonassessable Water Fund Budget Line 6410 -- $13,000).  The total estimated cost for this project including the requested amount is $85,000.  This project is anticipated to be completed during the 2018 construction season.

 

N. 24th St. - W. Auer Ave. to W. Hopkins St. (SM495170015):  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $223,000.  This project is anticipated to be completed during the 2018 construction season.

 

N. 34th St. - W. Burleigh St. to W. Auer Ave. (SM495170013):  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $177,000.  This project is anticipated to be completed during the 2018 construction season.

 

N. 46th St. - 470 feet north of W. Glendale Ave. to W. Hampton Ave. (WT410180607):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $2,000; Nonassessable Water Fund Budget Line 6410 -- $18,000).  The total estimated cost for this project including the requested amount is $220,000.  This project is anticipated to be completed during the 2018 construction season.

 

N. 48th St. - W. Capitol Dr. to W. Marion St. (WT410180630):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $3,000; Nonassessable Water Fund Budget Line 6410 -- $27,000).  The total estimated cost for this project including the requested amount is $485,000.  This project is anticipated to be completed during the 2018 construction season.

 

N. 49th St. - W. Congress St. to 400 feet north of W. Congress St. (WT410180606):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $2,000; Nonassessable Water Fund Budget Line 6410 -- $13,000).  The total estimated cost for this project including the requested amount is $100,000.  This project is anticipated to be completed during the 2018 construction season.

 

N. 51st Blvd. - W. Hope Ave. to W. Congress St. (WT410180628):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $3,000; Nonassessable Water Fund Budget Line 6410 -- $22,000).  The total estimated cost for this project including the requested amount is $340,000.  This project is anticipated to be completed during the 2018 construction season.

 

N. 52nd St. - W. Hope Ave. to W. Congress St. (WT410180637):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $3,000; Nonassessable Water Fund Budget Line 6410 -- $22,000).  The total estimated cost for this project including the requested amount is $345,000.  This project is anticipated to be completed during the 2018 construction season.

 

N. 56th St. - W. Leon Terr. To 400 feet north of W. Congress St. (WT410180636):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $2,000; (Nonassessable Water Fund Budget Line 6410 -- $13,000).  The total estimated cost for this project including the requested amount is $165,000.  This project is anticipated to be completed during the 2018 construction season.

 

8th Aldermanic District

 

W. Greves St. - W. St. Paul Ave. to 250 feet east of N. 25th St. (WT410180616):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $2,000; Nonassessable Water Fund Budget Line 6410 -- $13,000).  The total estimated cost for this project including the requested amount is $125,000.  This project is anticipated to be completed during the 2018 construction season.

 

W. St. Paul Ave. - 550 feet east of W. Greves St. to N. 25th St. (WT410180613):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $3,000; Nonassessable Water Fund Budget Line 6410 -- $22,000).  The total estimated cost for this project including the requested amount is $325,000.  This project is anticipated to be completed during the 2018 construction season.

 

W. St. Paul Ave. - N. 17th St. to 550 feet east of W. Greves St. (WT410180614):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $3,000; Nonassessable Water Fund Budget Line 6410 -- $27,000).  The total estimated cost for this project including the requested amount is $400,000.  This project is anticipated to be completed during the 2018 construction season.

 

10th Aldermanic District

 

W. Appleton Ave. - W. Hadley St. to N. 60th St. (SM495170014):  Relaying sanitary sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $105,000.  This project is anticipated to be completed during the 2018 construction season.

 

W. Michigan St. - N. 91st St. to N. 92nd St. (WT410180642):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $2,000; Nonassessable Water Fund Budget Line 6410 -- $13,000).  The total estimated cost for this project including the requested amount is $100,000.  This project is anticipated to be completed during the 2018 construction season.

 

11th Aldermanic District

 

W. Crawford Ave. - S. 51st St. to S. 53rd St. (WT410180620):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $2,000; Nonassessable Water Fund Budget Line 6410 -- $13,000).  The total estimated cost for this project including the requested amount is $165,000.  This project is anticipated to be completed during the 2018 construction season.

 

W. Euclid Ave. - S. 68th St. to S. 70th St. (WT410180612):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $2,000; Nonassessable Water Fund Budget Line 6410 -- $13,000).  The total estimated cost for this project including the requested amount is $170,000.  This project is anticipated to be completed during the 2018 construction season.

 

W. Montana St. - S. 55th St. to S. 58th St. (WT410180618):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $2,000; Nonassessable Water Fund Budget Line 6410 -- $18,000).  The total estimated cost for this project including the requested amount is $230,000.  This project is anticipated to be completed during the 2018 construction season.

 

West Oklahoma Avenue Bioswales:  W. Oklahoma Ave. - S. 49th St. to S. 60th St. (SM499170100):  (Storm Water Quality - Nonassessable Water Quality Projects to meet TMDL Requirements -- $15,000).  The total estimated cost for this project including the requested amount is $200,000.  This project is anticipated to be completed during the 2018 construction season.

 

S. 52nd St. - W. Crawford Ave. to W. Howard Ave. (WT410180619):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $2,000; Nonassessable Water Fund Budget Line 6410 -- $13,000).  The total estimated cost for this project including the requested amount is $165,000.  This project is anticipated to be completed during the 2018 construction season.

 

S. 70th St. - W. Euclid Ave. to 160 feet south of W. Ohio Ave. (WT410180611):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $2,000; Nonassessable Water Fund Budget Line 6410 -- $18,000).  The total estimated cost for this project including the requested amount is $285,000.  This project is anticipated to be completed during the 2018 construction season.

 

S. 84th St. - W. Morgan Ave. to W. Warnimont Ave. (WT410180627):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $2,000; Nonassessable Water Fund Budget Line 6410 -- $13,000).  The total estimated cost for this project including the requested amount is $160,000.  This project is anticipated to be completed during the 2018 construction season.

 

13th Aldermanic District

 

S. Logan Ave. - S. Whitnall Ave. to E. Price Ct. (WT410180632):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $36,000).  The total estimated cost for this project including the requested amount is $655,000.  This project is anticipated to be completed during the 2018 construction season.

 

W. Parnell Ave. - S. 27th St. to S. 29th St. (WT410180621):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $2,000; Nonassessable Water Fund Budget Line 6410 -- $13,000).  The total estimated cost for this project including the requested amount is $195,000.  This project is anticipated to be completed during the 2018 construction season.

 

E. Van Norman Ave. - S. Lenox St. to S. Logan Ave. (WT410180633):  Water main extension.  (Nonassessable Water Fund Budget Line 5010 -- $2,000; Nonassessable Water Fund Budget Line 6410 -- $13,000).  The total estimated cost for this project including the requested amount is $85,000.  This project is anticipated to be completed during the 2018 construction season.

 

W. Whitaker Ave. - 360 feet east of S. 18th St. to S. 18th St. (WT410180626):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $2,000; Nonassessable Water Fund Budget Line 6410 -- $13,000).  The total estimated cost for this project including the requested amount is $90,000.  This project is anticipated to be completed during the 2018 construction season.

 

S. 13th St. - W. Holmes Ave. to W. Abbott Ave. (WT410180602):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $3,000; Nonassessable Water Fund Budget Line 6410 -- $27,000).  The total estimated cost for this project including the requested amount is $410,000.  This project is anticipated to be completed during the 2018 construction season.

 

S. 15th St. - W. Halsey Ave. to W. Holmes Ave. (WT410180600):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $2,000; Nonassessable Water Fund Budget Line 6410 -- $13,000).  The total estimated cost for this project including the requested amount is $80,000.  This project is anticipated to be completed during the 2018 construction season.

 

S. 16th St. - 310 feet north of W. Holmes Ave. to W. Holmes Ave. (WT410180001):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $2,000; Nonassessable Water Fund Budget Line 6410 -- $13,000).  The total estimated cost for this project including the requested amount is $80,000.  This project is anticipated to be completed during the 2018 construction season.

 

S. 18th St. - W. Whitaker Ave. to W. Bottsford Ave. (WT410180625):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $2,000; Nonassessable Water Fund Budget Line 6410 -- $13,000).  The total estimated cost for this project including the requested amount is $85,000.  This project is anticipated to be completed during the 2018 construction season.

 

S. 24th St. - W. Warnimont Ave. to W. Wilbur Ave. (WT410180608):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $2,000; Nonassessable Water Fund Budget Line 6410 -- $13,000).  The total estimated cost for this project including the requested amount is $185,000.  This project is anticipated to be completed during the 2018 construction season.

 

S. 27th St. - 875 feet north of W. Parnell Ave. to W. Parnell Ave. (WT410180622):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $2,000; Nonassessable Water Fund Budget Line 6410 -- $18,000).  The total estimated cost for this project including the requested amount is $220,000.  This project is anticipated to be completed during the 2018 construction season.

 

15th Aldermanic District

 

N. 33rd St. - 30 feet north of W. North Ave. to W. Meinecke Ave. (WT410180617):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $2,000; Nonassessable Water Fund Budget Line 6410 -- $13,000).  The total estimated cost for this project including the requested amount is $150,000.  This project is anticipated to be completed during the 2018 construction season.

 

City Wide

 

Crackfilling of various streets by contract (ST211170185):  (Nonassessable Reconstruction Paving Fund -- $10,000).  The total estimated cost for this project including the requested amount is $305,000.  This project is anticipated to be completed during the 2017 construction season.

 

Chip sealing of various streets by contract (ST211170186):  (Nonassessable Reconstruction Paving Fund -- $10,000).  The total estimated cost for this project including the requested amount is $565,000.  This project is anticipated to be completed during the 2017 construction season.

 

Joint repair of various streets by contract (ST211170187):  (Nonassessable Reconstruction Paving Fund -- $10,000).  The total estimated cost for this project including the requested amount is $200,000.  This project is anticipated to be completed during the 2017 construction season.

 

Various Aldermanic Districts

 

2017 Sanitary Manhole Rehabilitation (SM494170001):  (Infiltration/Inflow Reduction Fund -- $20,000).  The total estimated cost for this project including the requested amount is $900,00.  This project is anticipated to be completed during the 2017 construction season.

 

;and, be it

 

Further Resolved, That all City Departments are authorized to perform engineering, surveys, plan preparation, and determine an estimated cost thereof; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 

Requestor

Infrastructure Services Division

Drafter

Mary Dziewiontkoski/Denise Reinholtz

Npr 9

03/03/2017