File #: 161020    Version: 0
Type: Resolution Status: Passed
File created: 11/22/2016 In control: COMMON COUNCIL
On agenda: Final action: 12/13/2016
Effective date:    
Title: Resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $61,000 for a total estimated cost of these projects being $295,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS, SPECIAL ASSESSMENTS
Number
161020
Version
ORIGINAL
Sponsor
THE CHAIR
Title
Resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $61,000 for a total estimated cost of these projects being $295,000.
Analysis
This resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed. After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable. A resolution will be submitted after the Public Hearing authorizing construction. The City cost for engineering these projects is estimated to be $61,000 with the total cost estimated to be $295,000.
Body
Resolved, By the Common Council of the City of Milwaukee that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:

9th Aldermanic District

N. Servite Dr. - A point south of W. Brown Deer Rd. to W. Brown Deer Rd. (ST211060159): Paving the roadway with asphalt. Laying a concrete curb and gutter. Laying concrete sidewalk. Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $51,000, Additional Funds). The total estimated cost for this project including the requested amount is $155,000. This project was completed in 2008.

14th Aldermanic District

Alley between S. Graham St., E. Homer St., S. Kinnickinnic Ave., and E. Otjen St. (ST212180105): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $10,000). The ...