File #: 160913    Version:
Type: Resolution Status: Passed
File created: 11/1/2016 In control: COMMON COUNCIL
On agenda: Final action: 11/22/2016
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $3,709,721.13 for a total estimated cost of $15,308,108.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS, SPECIAL ASSESSMENTS
Attachments: 1. Letter.pdf, 2. Official Notice.pdf, 3. Cap. Grant Cert. F.N. 160913 - N 91st St.pdf, 4. Cap. Grant Cert. F.N. 160913 - N 92nd St.pdf, 5. Notice Published on 12-7-16
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
12/7/20161 CITY CLERK PUBLISHED   Action details Meeting details Not available
12/2/20161 MAYOR SIGNED   Action details Meeting details Not available
11/22/20161 COMMON COUNCIL ADOPTEDPass15:0 Action details Meeting details Not available
11/9/20161 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Mary Dziewiontkowski - DPW 1st Aldermanic District W. Congress St. - N. 22nd St. to N. Teutonia Ave. (ST211160136): Install traffic calming speed hump(s). Ald. Bohl moved approval. (Prevailed 4-0) N. 19th St. - W. Hampton Ave. to W. Stark St. (ST211170108): Install traffic calming speed hump(s). Ken Qualls 4986 N 19th St stated he is in support of the project because traffic is out of control. Ald. Donovan moved approval. (Prevailed 5-0) N. 19th Pl. - W. Stark St. to W. Fairmount Ave. (ST211170111): Install traffic calming speed hump(s). Ald. Bohl moved approval. (Prevailed 5-0) N. 19th St. - W. Stark St. to W. Fairmount Ave. (ST211170109): Install traffic calming speed hump(s). Ald. Bauman moved approval. (Prevailed 5-0) N. 36th St. - W. Thurston Ave. to W. Florist Ave. (ST211150195): Install traffic calming speed hump(s). Ald. Kovac moved approval. (Prevailed 5-0) N. 39th St. - W. Silver Spring Dr. to W. Florist Ave. (ST211160145): Install traffic calming speed hump(s). Ald. Donovan moved approval. (Prevailed 5-0) 2nd, 5th and 9th Aldermanic Districts N. 91st St. - W. Mill Rd. to W. Good Hope Rd. (ST320140401): Concrete pavement reconstruction, replace curb and gutter and sidewalk and driveway approaches where necessary, sodding, and grading. Ald. Bohl moved approval. (Prevailed 5-0) 5th Aldermanic District N. 92nd St. - W. Capitol Dr. to W. Hampton Ave. (Portions in the City of Wauwatosa) (ST320120801): Concrete pavement reconstruction, replace curb and gutter and sidewalk and driveway approaches where necessary, sodding, and grading. Ald. Bohl moved approval. (Prevailed 5-0) 6th Aldermanic District N. Buffum St. - E. Clarke St. to E. Center St. (ST211130156): Install traffic calming speed hump(s). Ald. Donovan moved approval. (Prevailed 5-0) 7th Aldermanic District N. 28th St. - W. Chambers St. to W. Burleigh St. (ST211170112): Install traffic calming speed hump(s). Ald. Kovac moved approval. (Prevailed 5-0) 8th and 12th Aldermanic Districts S. 19th St. - W. Burnham St. to W. Mitchell St. (ST211170107): Install traffic calming speed hump(s). Ald. Donovan moved approval. (Prevailed 5-0) 15th Aldermanic District N. Grant Blvd. - W. Clarke St. to W. Center St. (ST211170120): Install traffic calming speed hump(s). Ald. Bauman moved approval. (Prevailed 5-0)
Pass5:0 Action details Meeting details Video Video
11/1/20160 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

Number

160913

Version

SUBSTITUTE 1

Reference

140427

Sponsor

THE CHAIR

Title

Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $3,709,721.13 for a total estimated cost of $15,308,108.

Analysis

This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held.  The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements.  The City cost of these projects approved by this resolution is estimated to be $3,709,721.13.  The total estimated cost of these projects is $15,308,108.

Body

Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

 

1st Aldermanic District

 

W. Congress St. - N. 22nd St. to N. Teutonia Ave. (ST211160136):  Install traffic calming speed hump(s).  (Assessable Reconstruction Paving Fund -- $3,600; Nonassessable Reconstruction Paving Fund -- $3,400).  The total estimated cost for this project including the requested amount is $11,000.  This project is anticipated to be completed during the 2017construction season.

 

N. 19th St. - W. Hampton Ave. to W. Stark St. (ST211170108):  Install traffic calming speed hump(s).  (Assessable Reconstruction Paving Fund -- $5,800; Nonassessable Reconstruction Paving Fund -- $2,000).  The total estimated cost for this project including the requested amount is $7,800.  This project is anticipated to be completed during the 2017 construction season.

 

N. 19th Pl. - W. Stark St. to W. Fairmount Ave. (ST211170111):  Install traffic calming speed hump(s).  (Assessable Reconstruction Paving Fund -- $5,500; Nonassessable Reconstruction Paving Fund -- $2,000).  The total estimated cost for this project including the requested amount is $7,500.  This project is anticipated to be completed during the 2017 construction season.

 

N. 19th St. - W. Stark St. to W. Fairmount Ave. (ST211170109):  Install traffic calming speed hump(s).  (Assessable Reconstruction Paving Fund -- $5,300; Nonassessable Reconstruction Paving Fund -- $2,000).  The total estimated cost for this project including the requested amount is $7,300.  This project is anticipated to be completed during the 2017 construction season.

 

N. 36th St. - W. Thurston Ave. to W. Florist Ave. (ST211150195):  Install traffic calming speed hump(s).  (Assessable Reconstruction Paving Fund -- $19,000; Nonassessable Reconstruction Paving Fund -- $2,000).  The total estimated cost for this project including the requested amount is $21,000.  This project is anticipated to be completed during the 2017 construction season.

 

N. 39th St. - W. Silver Spring Dr. to W. Florist Ave. (ST211160145):  Install traffic calming speed hump(s).  (Assessable Reconstruction Paving Fund -- $25,700; Nonassessable Reconstruction Paving Fund -- $2,000).  The total estimated cost for this project including the requested amount is $27,700.  This project is anticipated to be completed during the 2017 construction season.

 

2nd, 5th and 9th Aldermanic Districts

 

N. 91st St. - W. Mill Rd. to W. Good Hope Rd. (ST320140401):  Concrete pavement reconstruction, replace curb and gutter and sidewalk and driveway approaches where necessary, sodding, and grading.

 

Grantor Non-Reimbursable Paving Fund -- $3,119,180

Grantor Reimbursable Paving Fund -- $550,444

City Share Non-assessable Paving Fund -- $1,315,713

City Share Assessable Paving Fund -- $18,500

City Share Environmental Engineering (SM499160107)(File Number 160798) -- $117,596.13

 

These funds are to be transferred to the construction account (ST3201404XX)

(2504-00-71).

 

Previously authorized for project construction:  $0

 

Current estimated cost of total project including this resolution:  $5,372,398

Original estimated cost of the project: (File Number 140427):  $5,320,980

 

This project is anticipated to be completed during the 2017 construction season.

 

5th Aldermanic District

 

N. 92nd St. - W. Capitol Dr. to W. Hampton Ave. (Portions in the City of Wauwatosa) (ST320120801):  Concrete pavement reconstruction, replace curb and gutter and sidewalk and driveway approaches where necessary, sodding, and grading.

 

Grantor Non-Reimbursable Paving Fund -- $3,258,874

Grantor Reimbursable Paving Fund - $488,832

City Share Non-assessable Paving Fund -- $1,740,485

City Share Assessable Paving Fund -- $9,200

City Share Environmental Engineering (SM499160106) (File Number 160798) -- $71,629

Grantor Reimbursable, City of Wauwatosa -- $39,492.15

 

These funds are to be transferred to the construction account (ST3201208XX) (2585-00-70).

 

Previously authorized for project construction -- $0

 

Current estimated cost of total project including this resolution -- $6,308,512

 

Original estimated cost of the project (File Number 141389):  $5,684,632

 

This project is anticipated to be completed during the 2017 construction season

 

Associated projects:

 

(1st, 2nd, 7th, and 9th Aldermanic Districts)

 

N. 60th St. and W. Hampton Ave. - 11 Local Intersections (ST320140201) (2595-08-00): Install Monotube mast arms, concrete bases, poles and electrical conduit.

 

Grantor Non-Reimbursable Paving Fund -- $577,037

Grantor Reimbursable Paving Fund - $86,556

City Share Non-assessable Paving Fund -- $188,584

 

These funds are to be transferred to the construction account (ST3201402XX) (2595-08-70).

 

Previously authorized for project construction:  $0

 

Current estimated cost of total project including this resolution:  $1,515,910

 

Original estimated cost of the project: (File Number 140272):  $1,401,058

 

This project is anticipated to be completed during the 2017 construction season.

 

(1st, 2nd, 6th, and 7th Aldermanic Districts)

 

W. Capitol Dr. (STH 190) - 12 Connecting Highway Intersections (ST320130101) (2025-01-02):  Install Monotube mast arms, concrete bases, poles and electrical conduit.

 

City Share Non-assessable Paving Fund -- $137,214, additional

 

These funds are to be transferred to the construction account (ST320130110) (2025-00-72).

 

Previously authorized for project construction (File Number 141598):  $1,130,345

 

Current estimated cost of total project including this resolution:  $1,996,560

 

Original estimated cost of the project: (File Number 120993):  $1,669,800

 

This project is anticipated to be completed during the 2017 construction season.

 

6th Aldermanic District

 

N. Buffum St. - E. Clarke St. to E. Center St. (ST211130156):  Install traffic calming speed hump(s).  (Assessable Reconstruction Paving Fund -- $5,200; Nonassessable Reconstruction Paving Fund -- $2,000).  The total estimated cost for this project including the requested amount is $7,200.  This project is anticipated to be completed during the 2017 construction season.

 

7th Aldermanic District

 

N. 28th St. - W. Chambers St. to W. Burleigh St. (ST211170112):  Install traffic calming speed hump(s).  (Assessable Reconstruction Paving Fund -- $6,400; Nonassessable Reconstruction Paving Fund -- $2,000).  The total estimated cost for this project including the requested amount is $8,400.  This project is anticipated to be completed during the 2017 construction season.

 

8th and 12th Aldermanic Districts

 

S. 19th St. - W. Burnham St. to W. Mitchell St. (ST211170107):  Install traffic calming speed hump(s).  (Assessable Reconstruction Paving Fund -- $6,500; Nonassessable Reconstruction Paving Fund -- $2,000).  The total estimated cost for this project including the requested amount is $8,500.  This project is anticipated to be completed during the 2017 construction season.

 

15th Aldermanic District

 

N. Grant Blvd. - W. Clarke St. to W. Center St. (ST211170120):  Install traffic calming speed hump(s).  (Assessable Reconstruction Paving Fund -- $6,400; Nonassessable Reconstruction Paving Fund -- $2,000).  The total estimated cost for this project including the requested amount is $8,400.  This project is anticipated to be completed during the 2017 construction season.

 

; and

 

Whereas, The report of the Commissioner of Public Works has been filed with the City Clerk; and

 

Whereas, Notices have been sent to all interested persons and public hearings held; now, therefore, be it

 

Resolved, By the Common Council of the City of Milwaukee, that the Commissioner of Public Works’ Report, as amended at said Public Hearing, is approved and the properties therein identified are benefited; and, be it

 

Further Resolved, That said Commissioner of Public Works is authorized and directed to proceed with said work in accordance with said report pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That the proper departments take such action as is required of them to assess the abutting or adjacent properties and collect such assessment in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts; and, be it

 

Further Resolved, That the projects do not involve any parcels of agricultural land which are eligible for deferred special assessments under the provisions of Section 14.30 of the Milwaukee City Charter; and, be it

 

Further Resolved, That the City Engineer and the Commissioner of Public Works are hereby authorized to negotiate and enter into an agreement with the State of Wisconsin, Department of Transportation for the City to undertake construction management duties on the following projects:  N. 91st St. (ST320140401) and N. 92nd St. (ST320120801) (N. 60th St. and W. Hampton Ave. (ST320140201), W. Capitol Dr. (ST320130110)); and, be it

 

Further Resolved, That the City Engineer is authorized to approve and make periodic payments to the State of Wisconsin, Department of Transportation after receipt of invoices from said State for the city’s share of the costs for said projects:  N. 91st St. (ST320140401) and N. 92nd St. (ST320120801) (N. 60th St. and W. Hampton Ave. (ST320140201), W. Capitol Dr. (ST320130110)); and, be it

 

Further Resolved, That upon the completion of projects N. 91st St. (ST320140401) and N. 92nd St. (ST320120801) (N. 60th St. and W. Hampton Ave. (ST320140201), W. Capitol Dr. (ST320130110)) and a determination of the actual costs, it is understood that if the City of Milwaukee’s share is less than the amount previously paid, the difference will be refunded to said City; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That projects:  W. Congress St. (ST211160136), N. 19th St. (ST211170108), N. 19th Pl. (ST211170111), N. 19th St. (ST211170109), N. 36th St. (ST211150195), N. 39th St. (ST211160145), N. Buffum St. (ST211130156), N. 28th St. (ST211170112), S. 19th St. (ST211170107), and N. Grant Blvd. (ST211170120) will be billed after January 1, 2019, but not before 12 months after the project contract has been completed.

 

 

Requestor

Infrastructure Services Division

Drafter

Mary Dziewiontkoski/Denise Reinholtz

Afr 4

11/10/2016