powered help
header-left header-center header-right
File #: 160797    Version:
Type: Resolution Status: Passed
File created: 10/11/2016 In control: COMMON COUNCIL
On agenda: Final action: 11/1/2016
Effective date:    
Title: Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $145,000 for a total estimated cost of these projects being $824,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS

Number

160797

Version

Substitute 1

Sponsor

THE CHAIR

Title

Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $145,000 for a total estimated cost of these projects being $824,000.

Analysis

This resolution authorizes engineering studies on projects which by City Charter are nonassessable.  After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council.  The City cost for engineering these projects is estimated to be $145,000 with the total cost estimated to be $824

,000.

Body

Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:

 

4th Aldermanic District

 

E. Wisconsin Ave. - N. Water St. to N. Broadway (SM495160078):  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $245,000.  This project is anticipated to be completed during the 2017 construction season.

 

6th Aldermanic District

 

W. Wright St. - N. 1st St. to N. 2nd St. (SM495160079):  Combined sewer lining.  (Nonassessable Sewer Maintenance Relay Fund -- $20,000).  The total estimated cost for this project including the requested amount is $335,000.  This project is anticipated to be completed during the 2017 construction season.

 

10th Aldermanic District

 

W. Juneau Ave. - 200 feet west of N. 46th St. to 315 feet west of N. 46th St. (SM495160080):  Relaying storm sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $10,000).  The total estimated cost for this project including the requested amount is $44,000.  This project is anticipated to be completed during the 2017 construction season.

 

City Wide

 

Work done by Contractors-Paving (WT410160750):  Water main alteration.  (Nonassessable Water Fund Budget Line 6410 -- $100,000, Additional Funds).  The total estimated cost for this project including the requested amount is $200,000.  This project is anticipated to be completed during the 2016 construction season.

 

;and, be it

 

Further Resolved, That all City Departments are authorized to perform engineering, surveys, plan preparation, and determine an estimated cost thereof; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 

Requestor

Infrastructure Services Division

Drafter

Mary Dziewiontkoski/Denise Reinholtz

Npr 3

10/14/2016