File #: 160796    Version:
Type: Resolution Status: Passed
File created: 10/11/2016 In control: COMMON COUNCIL
On agenda: Final action: 11/1/2016
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $549,200 for a total estimated cost of $591,100.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS, SPECIAL ASSESSMENTS
Attachments: 1. Transmittal Letter, 2. Official Notice, 3. Notice Published on 11-17-16
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
11/10/20161 MAYOR SIGNED   Action details Meeting details Not available
11/1/20161 COMMON COUNCIL ADOPTEDPass15:0 Action details Meeting details Not available
10/19/20161 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Mary Dziewiontkoski - DPW 2nd Aldermanic District Todd Miller - Legislative Assistant stated Ald. Johnson is in support of the first project and not supportive of the second project. W. Medford Ave. - W. Congress St. to W. Baldwin St. (ST211160148): Install traffic calming speed hump(s). Ald. Donovan moved approval. (Prevailed 5-0) N. 75th St. - W. Marion St. to W. Congress St. (ST211160167): Install traffic calming speed hump(s). Ald. Bohl moved to delete the project. (Prevailed 5-0) 4th Aldermanic District W. McKinley Ave. - N. 18th St. to N. 19th St. (ST211170124): Install traffic calming speed hump(s). Elena Kongoroa 1827 W McKinley stated she does not have small children and does not want the project. Ald. Bauman moved approval. (Prevailed 5-0) 6th Aldermanic District Ald. Coggs stated DPW held a neighborhood meeting and she is in support of the project. Ian Sustar 728 E Nash St stated he is in support of the project. Darrel Johnson, Executive Director of Riverworks stated all property owners are in support of the project. Chris Garrison, Habitat for Humanity is in support of the project. Bob Vitora - DPW stated the property owner in objection is now in support of the project. E. Nash St. - N. Fratney St. to N. Holton St. (ST211120171): Concrete pavement reconstruction, widen the pavement from 24 to 36 feet, construct curb and gutter, replace all of the walk on the north side of the street, install new walk on the south side of the street, construct driveways, remove railroad crossings as necessary, sodding (new 6-foot width of tree border area), and grading. Ald. Donovan moved approval. (Prevailed 5-0) 7th Aldermanic District N. 40th St. - W. Roosevelt Dr. to W. Capitol Dr. (ST211170114): Install traffic calming speed hump(s). Ald. Donovan moved approval. (Prevailed 5-0) N. 46th St. - W. Glendale Ave. to W. Hampton Ave. (ST211170116): Install traffic calming speed hump(s). Ald. Bohl moved approval. (Prevailed 5-0) 14th Aldermanic District S. Lenox St. - 350 feet south of E. Wilbur Ave. to E. Wilbur Ave. (SM492140007): Install storm sewer. Todd Norshal 3689 S Lenox St stated there is a water drainage issue in the area and is in support of the project. Ald. Donovan moved approval. (Prevailed 5-0) Ald. Bohl moved approval as amended. (Prevailed 5-0)
Pass5:0 Action details Meeting details Video Video
10/11/20160 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available
Number
160796
Version
SUBSTITUTE 1
Reference
160261
Sponsor
THE CHAIR
Title
Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $549,200 for a total estimated cost of $591,100.
Analysis
This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held. The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements. The City cost of these projects approved by this resolution is estimated to be $549,200. The total estimated cost of these projects is $591,100.
Body
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

2nd Aldermanic District

W. Medford Ave. - W. Congress St. to W. Baldwin St. (ST211160148): Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $7,500; Nonassessable Reconstruction Paving Fund -- $4,200). The total estimated cost for this project including the requested amount is $11,700. This project is anticipated to be completed during the 2017 construction season.

4th Aldermanic District

W. McKinley Ave. - N. 18th St. to N. 19th St. (ST211170124): Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $2,100; Nonassessable Reconstruction Paving Fund -- $1,000). The total estimated cost for this project including the requested amount is $7,000. This project is anticipated to be completed during the 2017 construction season.

6th Aldermanic District

E. Nash St. - N. Fratney St. to N. Holton St. (ST211120171) File Number 160261: Concret...

Click here for full text