File #: 160696    Version:
Type: Resolution Status: Passed
File created: 9/20/2016 In control: COMMON COUNCIL
On agenda: Final action: 10/11/2016
Effective date:    
Title: Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $111,000 for a total estimated cost of these projects being $1,573,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
10/19/20161 MAYOR SIGNED   Action details Meeting details Not available
10/11/20161 COMMON COUNCIL ADOPTEDPass14:0 Action details Meeting details Not available
9/28/20161 PUBLIC WORKS COMMITTEE SUBSTITUTED

Minutes note: Proposed Substitute A
Pass5:0 Action details Meeting details Video Video
9/28/20161 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Mary Dziewiontkoski - Department of Public Works
Pass5:0 Action details Meeting details Not available
9/20/20160 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

Number

160696

Version

Substitute 1

Sponsor

THE CHAIR

Title

Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $111,000 for a total estimated cost of these projects being $1,573,000.

Analysis

This resolution authorizes engineering studies on projects which by City Charter are nonassessable.  After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council.  The City cost for engineering these projects is estimated to be $111,000 with the total cost estimated to be $1,573,000.

Body

Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:

 

5th Aldermanic District

 

N. 92nd St. - W. Capitol Dr. to W. Hampton Ave. (WT410170007):  Hydrant alteration.  (Nonassessable Water Fund Budget Line 5010 -- $2,000; Nonassessable Water Fund Budget Line 6410 -- $13,000).  The total estimated cost for this project including the requested amount is $100,000.  This project is anticipated to be completed during the 2017 construction season.

 

6th Aldermanic District

 

N. 2nd St. at W. Pleasant St. (TD04188004):  Intersection improvements.  (TID Nonassessable Paving Fund -- $10,000).  The total estimated cost for this project including the requested amount is $65,000.  This project is anticipated to be completed during the 2016 construction season.

 

8th Aldermanic District

 

W. Greenfield Ave. - S. Layton Blvd. to S. 28th St. (SM495160076):  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $117,000.  This project is anticipated to be completed during the 2016 construction season.

 

W. Orchard St. - S. 29th St. to S. 31st St. (SM495160075):  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $164,000.  This project is anticipated to be completed during the 2017 construction season.

 

S. 29th St. - W. Greenfield Ave. to W. Orchard St. (SM495160077):  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $127,000.  This project is anticipated to be completed during the 2017 construction season.

 

Various Aldermanic Districts

 

Handicap Ramp work to meet ADA requirements - High Impact Projects (ST216160110):  (Nonassessable High Impact Streets -- $50,000).  The total estimated cost for this project including the requested amount is $1,000,000.  This project is anticipated to be completed during the 2017 construction season.

 

;and, be it

 

Further Resolved, That all City Departments are authorized to perform engineering, surveys, plan preparation, and determine an estimated cost thereof; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 

Requestor

Infrastructure Services Division

Drafter

Mary Dziewiontkoski/Denise Reinholtz

Npr 2

09/23/2016