Number
160111
Version
Substitute 1
Reference
151134
Sponsor
THE CHAIR
Title
Substitute resolution authorizing city-wide sidewalk replacement at Scattered Sites, various Areas, school sites, and downtown locations; and, appropriating funds for these purposes with the city construction cost estimated to be $1,200,000 for a total estimated cost of these projects being $1,350,000.
Analysis
To provide the necessary authority for sidewalk repairs at Scattered Sites, various Areas, school sites, and downtown locations. The City cost of these projects approved by this resolution is estimated to be $1,200,000. The total estimated cost of these projects is $1,350,000.
Whereas, It is necessary and in the public interest to replace those sidewalk stones which are cracked, broken, out of grade or otherwise a hazard to pedestrians; and
Whereas, It is proposed that sidewalk replacement work be done in the following locations at the indicated cost:
2016 Scattered Sites (ST230160152) File Number 151134 (ST230160001): Laying concrete walk. Doing all necessary grading pertaining to said work. (Assessable Reconstruction Paving Fund -- $60,000; Nonassessable Sidewalk Reconstruction Paving Fund -- $420,000). The total estimated cost for this project including the requested amount is $555,000. This project is anticipated to be completed during the 2016 construction season.
Area bounded by N. 68th St., W. Lisbon Ave., and W. Burleigh St.; Area bounded by W. McKinley Ave., N. 17th St., W. Vliet St., and N. 20th St.; Area bounded by S. 16th St., W. Oklahoma Ave., S. 20th St., and RR ROW south of W. Cleveland Ave.; and various school sites and downtown locations (ST230160151) File Number 151134 (ST230160001): Laying concrete walk. Doing all necessary grading pertaining to said work. (Assessable Reconstruction Paving Fund -- $240,000; Nonassessable Sidewalk Reconstruction Paving Fund -- $480,000). The total estimated cost for this project including the requested amount is $795,000. This project is anticipated to be completed during the 2016 construction season.
Resolved, That said Commissioner of Public Works is authorized to proceed with said work in accordance with said report pursuant to Section 66.0704 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it
Further Resolved, That the proper departments take such action as is required of them to assess the abutting or adjacent properties and collect such assessment in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it
Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts; and, be it
Further Resolved, That the projects do not involve any parcels of agricultural land which are eligible for deferred special assessments under the provisions of Section 14.30 of the Milwaukee City Charter; and, be it
Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work.
Requestor
Infrastructure Services Division
Drafter
Mary Dziewiontkoski/Denise Reinholtz
Sidewalk Replacement
05/26/2016