File #: 160107    Version:
Type: Resolution Status: Passed
File created: 5/24/2016 In control: COMMON COUNCIL
On agenda: Final action: 6/14/2016
Effective date:    
Title: Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $10,000 for a total estimated cost of these projects being $85,700.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
6/22/20161 MAYOR SIGNED   Action details Meeting details Not available
6/14/20161 COMMON COUNCIL ADOPTEDPass13:0 Action details Meeting details Not available
6/1/20161 PUBLIC WORKS COMMITTEE SUBSTITUTED

Minutes note: Proposed Substitute A
Pass5:0 Action details Meeting details Video Video
6/1/20161 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Mary Dziewiontkoski - Department of Public Works
Pass5:0 Action details Meeting details Not available
5/24/20160 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available
Number
160107
Version
Substitute 1
Sponsor
THE CHAIR
Title
Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $10,000 for a total estimated cost of these projects being $85,700.
Analysis
This resolution authorizes engineering studies on projects which by City Charter are nonassessable. After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council. The City cost for engineering these projects is estimated to be $10,000 with the total cost estimated to be $85,700.
Body
Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:

8th Aldermanic District

W. Pierce St. at S. 37th St. (ST211141153): Pedestrian crossing. Paving the roadway with concrete. Laying a concrete curb and gutter. Laying concrete sidewalk. Doing all the necessary grading to said work. (Nonassessable Reconstruction Paving Fund -- $5,000). The total estimated cost for this project including the requested amount is $75,700. This project is anticipated to be completed during the 2016 construction season.

14th Aldermanic District

W. Oklahoma Ave. at S. 10th St. (ST211170104): Intersection modification. (Nonassessable Reconstruction Paving Fund -- $5,000). The total estimated cost for this project including the requested amount is $10,000. This project is anticipated to be completed during the 2017 construction season.

;and, be it

Further Resolved, That all City Departments are authorized to perform engineering, surveys, plan preparation, and determine an estimated cost thereof; and, be it

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; ...

Click here for full text