File #: 151848    Version:
Type: Resolution Status: Passed
File created: 4/15/2016 In control: COMMON COUNCIL
On agenda: Final action: 5/24/2016
Effective date:    
Title: Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $1,442,000 for a total estimated cost of these projects being $20,256,810.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
5/27/20161 MAYOR SIGNED   Action details Meeting details Not available
5/24/20161 COMMON COUNCIL ADOPTEDPass15:0 Action details Meeting details Video Video
5/11/20161 PUBLIC WORKS COMMITTEE SUBSTITUTED

Minutes note: Proposed Substitute A
Pass  Action details Meeting details Video Video
5/11/20161 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Mary Dziewiontowski - Department of Public Works
Pass5:0 Action details Meeting details Not available
4/15/20160 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

Number

151848

Version

Substitute 1

Sponsor

THE CHAIR

Title

Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $1,442,000 for a total estimated cost of these projects being $20,256,810.

Analysis

This resolution authorizes engineering studies on projects which by City Charter are nonassessable.  After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council.  The City cost for engineering these projects is estimated to be $1,442,000 with the total cost estimated to be $20,256,810.

Body

Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:

 

1st Aldermanic District

 

W. Glendale Ave. - N. Parkway Ave. to N. Green Bay Ave. (WT410170637):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $90,000.  This project is anticipated to be completed during the 2017 construction season.

 

2nd Aldermanic District

 

W. Carmen Ave. - N. 87th St. to N. 91st St. (WT410170650):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $8,000; Nonassessable Water Fund Budget Line 6410 -- $17,000).  The total estimated cost for this project including the requested amount is $360,000.  This project is anticipated to be completed during the 2017 construction season.

 

W. Courtland Ave. - N. 70th St. to N. 71st St. (WT410170686):  Water main extension.  (Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $85,000.  This project is anticipated to be completed during the 2017 construction season.

 

W. Glendale Ave. - N. 72nd St. to N. 74th St. (WT410170688):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $170,000.  This project is anticipated to be completed during the 2017 construction season.

 

W. Lancaster Ave. - N. 85th St. to N. 87th St. (WT410170636):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $8,000; Nonassessable Water Fund Budget Line 6410 -- $17,000).  The total estimated cost for this project including the requested amount is $305,000.  This project is anticipated to be completed during the 2017 construction season.

 

W. Thurston Ave. - N. 87th St. to N. 91st St. (WT410170649):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $8,000; Nonassessable Water Fund Budget Line 6410 -- $17,000).  The total estimated cost for this project including the requested amount is $325,000.  This project is anticipated to be completed during the 2017 construction season.

 

N. 65th St. - W. Ruby Ave. to W. Medford Ave. (WT410170640):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $6,000; Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost for this project including the requested amount is $245,000.  This project is anticipated to be completed during the 2017 construction season.

 

N. 67th St. - W. Glendale Ave. to W. Courtland Ave. (WT410170641):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $190,000.  This project is anticipated to be completed during the 2017 construction season.

 

N. 70th St. - W. Glendale Ave. to W. Hampton Ave. (WT410170684):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $8,000; Nonassessable Water Fund Budget Line 6410 -- $17,000).  The total estimated cost for this project including the requested amount is $360,000.  This project is anticipated to be completed during the 2017 construction season.

 

N. 71st St. - W. Glendale Ave. to W. Courtland Ave. (WT410170685):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $5,000; (Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $185,000.  This project is anticipated to be completed during the 2017 construction season.

 

N. 73rd St. - W. Courtland Ave. to W. Hampton Ave. (WT410170689):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $165,000.  This project is anticipated to be completed during the 2017 construction season.

 

N. 73rd St. - W. Ruby Ave. to W. Glendale Ave. (WT410170687):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $165,000.  This project is anticipated to be completed during the 2017 construction season.

 

N. 85th St. - 320 feet south of W. Fairmount Ave. to W. Villard Ave. (WT410170635):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $9,000; Nonassessable Water Fund Budget Line 6410 -- $21,000).  The total estimated cost for this project including the requested amount is $425,000.  This project is anticipated to be completed during the 2017 construction season.

 

N. 90th St. - W. Thurston Ave. to W. Carmen Ave. (WT410170651):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $6,000; Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost for this project including the requested amount is $255,000.  This project is anticipated to be completed during the 2017 construction season.

 

2nd, 5th and 7th Aldermanic Districts

 

West Congress Street Bioswales:  W. Congress St. - N. 51st Blvd. to N. 92nd St. (SM499160113):  (Storm Water Quality - Nonassessable Water Quality Projects to meet TMDL Requirements -- $5,000).  The total estimated cost for this project including the requested amount is $250,000.  This project is anticipated to be completed during the 2017 construction season.

 

3rd Aldermanic District

 

E. Kane Pl. - N. Farwell Ave. to N. Prospect Ave. (WT410170628):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $90,000.  This project is anticipated to be completed during the 2017 construction season.

 

4th Aldermanic District

 

W. State St. - N. James Lovell St. to N. 8th St. (SM495160053):  Combined sewer lining.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $97,000.  This project is anticipated to be completed during the 2017 construction season.

 

N. 23rd St. - W. Michigan St. to W. Wisconsin Ave. (SM495160043):  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $109,000.  This project is anticipated to be completed during the 2017 construction season.

 

5th Aldermanic District

 

W. Beckett Ave. - W. Glendale Ave. to W. Courtland Ave. (WT410170678):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $6,000; Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost for this project including the requested amount is $235,000.  This project is anticipated to be completed during the 2017 construction season.

 

W. Concordia Ave. - N. 98th St. to N. 99th St. (WT410170659):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $75,000.  This project is anticipated to be completed during the 2017 construction season.

 

W. Courtland Ave. - N. 77th St. to W. Appleton Ave. (WT410170681):  Relaying water main and water main extension.  (Nonassessable Water Fund Budget Line 5010 -- $9,000; Nonassessable Water Fund Budget Line 6410 -- $21,000).  The total estimated cost for this project including the requested amount is $405,000.  This project is anticipated to be completed during the 2017 construction season.

 

West Good Hope Road Bioswales: W. Good Hope Rd. - N. 91st St. to N. 107th St. (SM499160109):  (Storm Water Quality - Nonassessable Water Quality Projects to meet TMDL Requirements -- $5,000).  The total estimated cost for this project including the requested amount is $340,000.  This project is anticipated to be completed during the 2016 construction season.

 

W. Hampton Ave. (South Side) - N. 110th St. to 540 feet west of N. 110th St. (WT410170665):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $135,000.  This project is anticipated to be completed during the 2017 construction season.

 

W. Ruby Ave. - N. 82nd St. to N. 83rd St. (WT410170677):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $85,000.  This project is anticipated to be completed during the 2017 construction season.

 

N. 78th St. - W. Arden Pl. to 400 feet north of W. Courtland Ave. (WT410170682):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $8,000; Nonassessable Water Fund Budget Line 6410 -- $17,000).  The total estimated cost for this project including the requested amount is $355,000.  This project is anticipated to be completed during the 2017 construction season.

 

N. 79th St. - W. Courtland Ave. to W. Hampton Ave. (WT410170683):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $165,000.  This project is anticipated to be completed during the 2017 construction season.

 

N. 80th St. - W. Courtland Ave. to W. Hampton Ave. (WT410170680):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $160,000.  This project is anticipated to be completed during the 2017 construction season.

 

N. 81st St. - W. Courtland Ave. to W. Hampton Ave. (WT410170679):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $160,000.  This project is anticipated to be completed during the 2017 construction season.

 

N. 84th St. - W. Courtland Ave. to W. Hampton Ave. (WT410170675):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $6,000; Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost for this project including the requested amount is $265,000.  This project is anticipated to be completed during the 2017 construction season.

 

N. 94th St. - W. Capitol Dr. to 300 feet north of W. Capitol Dr. (WT410170626):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $75,000.  This project is anticipated to be completed during the 2017 construction season.

 

N. 97th St. - W. Sarasota Pl. to W. Fiebrantz Ave. (WT410170627):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $60,000.  This project is anticipated to be completed during the 2017 construction season.

 

N. 98th St. - W. Concordia Ave. to W. Townsend St. (WT410170660):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $165,000.  This project is anticipated to be completed during the 2017 construction season.

 

6th Aldermanic District

 

N. Dr. Martin Luther King Jr. Dr. - W. Garfield Ave. to W. North Ave. (SM495160045):  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $116,000.  This project is anticipated to be completed during the 2017 construction season.

 

W. Walnut St. - N. Dr. Martin Luther King Jr. Dr. to N. 6th St. (SM495160042):  Combined sewer lining and combined sewer repair.  (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $441,000.  This project is anticipated to be completed during the 2017 construction season.

 

7th Aldermanic District

 

N. 44th St. (Various Locations) - W. Spencer Pl. to W. Capitol Dr. (SM495160047):  Relaying sanitary and storm sewers.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $211,000.  This project is anticipated to be completed during the 2017 construction season.

 

N. 51st Blvd. (4500N) over Lincoln Creek (BR100120106):  Bridge replacement design.  (City Share Non-assessable Structure Fund -- $100,000, Additional Funds) (File Number 141485).  The total estimated cost for this project including the requested amount is $2,513,810.  This engineering is anticipated to be completed during 2016.

 

N. 52nd St. - W. Congress St. to W. Lincoln Creek Dr. (WT410170673):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $6,000; Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost for this project including the requested amount is $200,000.  This project is anticipated to be completed during the 2017 construction season.

 

N. 54th St. - W. Glendale Ave. (WE 657) to 680 feet south of W. Hampton Ave. (WT410170671):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $160,000.  This project is anticipated to be completed during the 2017 construction season.

 

8th Aldermanic District

 

S. Layton Blvd. - A point 200 feet north of W. Evergreen Ln. to W. Evergreen Ln. (SM495160039):  Combined sewer lining.  (Nonassessable Sewer Maintenance Relay Fund -- $10,000).  The total estimated cost for this project including the requested amount is $35,000.  This project is anticipated to be completed during the 2017 construction season.

 

S. Layton Blvd. - W. Pierce St. to W. National Ave. (SM495160040):  Combined sewer lining.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $164,000.  This project is anticipated to be completed during the 2017 construction season.

 

S. 27th St./S. Layton Blvd. - W. Grant St. to W. Cleveland Ave. (SM495160038):  Combined sewer lining.  (Nonassessable Sewer Maintenance Relay Fund -- $25,000).  The total estimated cost for this project including the requested amount is $1,011,000.  This project is anticipated to be completed during the 2017 construction season.

 

South 27th Street Bioswales:  S. 27th St. - Union Pacific Railroad to W. Forest Home Ave. (SM499160112):  (Storm Water Quality - Nonassessable Water Quality Projects to meet TMDL Requirements -- $5,000).  The total estimated cost for this project including the requested amount is $200,000.  This project is anticipated to be completed during the 2017 construction season.

 

9th Aldermanic District

 

W. Green Tree Rd. - W. Beechwood Ave. to N. Burbank Ave. (WT410170667):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $160,000.  This project is anticipated to be completed during the 2017 construction season.

 

W. Kiehnau Ave. - N. 83rd St. to N. 84th St. (WT410170666):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $80,000.  This project is anticipated to be completed during the 2017 construction season.

 

10th Aldermanic District

 

W. Mt. Vernon Ave. - N. 93rd St. to N. 95th St. (WT410170664):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $175,000.  This project is anticipated to be completed during the 2017 construction season.

 

W. Park Hill Ave. - N. 93rd St. to W. Mt. Vernon Ave. (WT410170663):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $135,000.  This project is anticipated to be completed during the 2017 construction season.

 

W. Potomac Ave. - N. 73rd St. to N. 74th St. (WT410170658):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $6,000; Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost for this project including the requested amount is $290,000.  This project is anticipated to be completed during the 2017 construction season.

 

N. 64th St. - 133 feet north of W. Nash St. to 390 feet north of W. Nash St. (SM495160046):  Relaying storm sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $70,000.  This project is anticipated to be completed during the 2017 construction season.

 

11th Aldermanic District

 

W. Bennett Ave. - S. 57th St. to S. 60th St. (WT410170656):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $75,000.  This project is anticipated to be completed during the 2017 construction season.

 

W. Euclid Ave. - S. 63rd St. to S. 68th St. (WT410170646):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $11,000; Nonassessable Water Fund Budget Line 6410 -- $24,000).  The total estimated cost for this project including the requested amount is $530,000.  This project is anticipated to be completed during the 2017 construction season.

 

W. Ohio Ave. - S. 60th St. to S. 63rd St. (WT410170648):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $165,000.  This project is anticipated to be completed during the 2017 construction season.

 

S. 53rd St. - W. Wilbur Ave. to W. Howard Ave. (WT410170662):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $8,000; Nonassessable Water Fund Budget Line 6410 -- $17,000).  The total estimated cost for this project including the requested amount is $320,000.  This project is anticipated to be completed during the 2017 construction season.

 

S. 63rd St. - W. Oklahoma Ave. to W. Burdick Ave. (WT410170647):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $6,000; Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost for this project including the requested amount is $250,000.  This project is anticipated to be completed during the 2017 construction season.

 

S. 66th St. - W. Ohio Ave. to W. Morgan Ave. (WT410170644):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $8,000; Nonassessable Water Fund Budget Line 6410 -- $17,000).  The total estimated cost for this project including the requested amount is $325,000.  This project is anticipated to be completed during the 2017 construction season.

 

S. 67th Ct. - 300 feet north of W. Euclid Ave. to W. Euclid Ave. (WT410170645):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $75,000.  This project is anticipated to be completed during the 2017 construction season.

 

S. 82nd St. - W. Warnimont Ave. to W. Wilbur Ave. (WT410170676):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $175,000.  This project is anticipated to be completed during the 2017 construction season.

 

12th Aldermanic District

 

W. Windlake Ave. - W. Burnham St. to S. 10th St. (SM495160041):  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $312,000.  This project is anticipated to be completed during the 2017 construction season.

 

West Windlake Avenue Bioswale:  W. Windlake Ave. - S. 16th St. to S. 20th St. (SM499160114):  (Storm Water Quality - Nonassessable Water Quality Projects to meet TMDL Requirements -- $5,000).  The total estimated cost for this project including the requested amount is $60,000.  This project is anticipated to be completed during the 2016 construction season.

 

South 5th Street Bioswales: S. 5th St. - W. Scott St. to W. Virginia St. (SM499160108):  (Storm Water Quality - Nonassessable Water Quality Projects to meet TMDL Requirements -- $5,000).  The total estimated cost for this project including the requested amount is $150,000.  This project is anticipated to be completed during the 2016 construction season.

 

13th Aldermanic District

 

W. Armour Ave. - S. 13th St. to S. 14th St. (WT410170668):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $80,000.  This project is anticipated to be completed during the 2017 construction season.

 

W. Iona Terr. - W. Parnell Ave. to S. 39th St. (WT410170643):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $80,000.  This project is anticipated to be completed during the 2017 construction season.

 

S. Melinda St. - W. Birchwood Ave. to W. Parnell Ave. (WT410170655):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $95,000.  This project is anticipated to be completed during the 2017 construction season.

 

S. 5th St. - 600 feet north of W. Layton Ave. to W. Layton Ave. (WT410170657):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $150,000.  This project is anticipated to be completed during the 2017 construction season.

 

S. 14th St. - W. Armour Ave. to 500 feet south of W. Cudahy Ave. (WT410170669):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $6,000; Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost for this project including the requested amount is $200,000.  This project is anticipated to be completed during the 2017 construction season.

 

S. 16th St. - W. Bolivar Ave. to S. Whitaker Ave. (WT410170670):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $80,000.  This project is anticipated to be completed during the 2017 construction season.

 

S. 25th Ct. - W. Henry Ave. to 210 feet south of W. Henry Ave. (WT410170674):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $60,000.  This project is anticipated to be completed during the 2017 construction season.

 

S. 39th St. - W. Birchwood Ave. to W. Iona Terr. (WT410170642):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $75,000.  This project is anticipated to be completed during the 2017 construction season.

 

14th Aldermanic District

 

S. Herman St. - E. Doty Pl. to S. Whitnall Ave. (WT410170652):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $95,000.  This project is anticipated to be completed during the 2017 construction season.

 

E. Waterford Ave. - S. Lenox St. to S. Herman St. (WT410170654):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $160,000.  This project is anticipated to be completed during the 2017 construction season.

 

15th Aldermanic District

 

N. 9th St. - W. Center St. to W. Hadley St. (SM495160054):  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $182,000.  This project is anticipated to be completed during the 2017 construction season.

 

N. 20th St. - W. Vliet St. to 220 feet north of W. Vliet St. (SM495160051):  Combined sewer lining.  (Nonassessable Sewer Maintenance Relay Fund -- $10,000).  The total estimated cost for this project including the requested amount is $19,000.  This project is anticipated to be completed during the 2017 construction season.

 

N. 21st St. - 220 feet south of W. Vliet St. to W. Vliet St. (SM495160052):  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $10,000).  The total estimated cost for this project including the requested amount is $59,000.  This project is anticipated to be completed during the 2017 construction season.

 

N. 23rd St. - W. Vliet St. to 125 feet south of W. Cherry St. (SM495160049):  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $87,000.  This project is anticipated to be completed during the 2017 construction season.

 

N. 24th Pl. (Various Locations) - W. Vliet St. to W. Cherry St. (SM495160048):  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $10,000).  The total estimated cost for this project including the requested amount is $50,000.  This project is anticipated to be completed during the 2017 construction season.

 

N. 26th St. - W. McKinley St. to 50 feet north of W. Cherry St. (SM495160044):  Combined sewer slip lining.  (Nonassessable Sewer Maintenance Relay Fund -- $25,000).  The total estimated cost for this project including the requested amount is $2,795,000.  This project is anticipated to be completed during the 2017 construction season.

 

N. 26th St. - W. Vliet St. to 120 feet north of W. Vliet St. (SM495160050):  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $10,000).  The total estimated cost for this project including the requested amount is $35,000.  This project is anticipated to be completed during the 2017 construction season.

 

City of Greenfield

 

S. 37th St. - W. Bottsford Ave. to 415 feet south of W. Bottsford Ave. (WT410170661):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $115,000.  This project is anticipated to be completed during the 2017 construction season.

 

City of St. Francis

 

S. Kingan Ave. - 180 feet north of E. Waterford Ave. to E. Denton Ave. (WT410170630):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $135,000.  This project is anticipated to be completed during the 2017 construction season.

 

S. McCarty Ave. - E. Denton Ave. to E. Lunham Ave. (WT410170629):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $6,000; Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost for this project including the requested amount is $250,000.  This project is anticipated to be completed during the 2017 construction season.

 

S. Shannon Ave. - E. Norwich Ave. to E. Denton Ave. (WT410170634):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $6,000; Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost for this project including the requested amount is $235,000.  This project is anticipated to be completed during the 2017 construction season.

 

E. Waterford Ave. - S. Lipton Ave. to 150 feet south of E. Tesch Ave. (WT410170633):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $6,000; Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost for this project including the requested amount is $270,000.  This project is anticipated to be completed during the 2017 construction season.

 

;and, be it

 

Further Resolved, That all City Departments are authorized to perform engineering, surveys, plan preparation, and determine an estimated cost thereof; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 

Requestor

Infrastructure Services Division

Drafter

Mary Dziewiontkoski/Denise Reinholtz

Npr11

05/06/2016