File #: 151847    Version:
Type: Resolution Status: Passed
File created: 4/15/2016 In control: COMMON COUNCIL
On agenda: Final action: 5/24/2016
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $458,600 for a total estimated cost of $514,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS, SPECIAL ASSESSMENTS
Attachments: 1. LTR-AFR 11.pdf, 2. AD 11.pdf, 3. Notice Published 6-10-16
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
6/10/20161 CITY CLERK PUBLISHED   Action details Meeting details Not available
5/27/20161 MAYOR SIGNED   Action details Meeting details Not available
5/24/20161 COMMON COUNCIL ADOPTEDPass15:0 Action details Meeting details Video Video
5/11/20161 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Mary Dziewiontowski - Department of Public Works 1st Aldermanic District W. Elm St. - N. Teutonia Ave. to a point 1,600 feet west of N. Teutonia Ave. (ST211160107): Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, install new walk as necessary, sodding (9-foot width of tree border area), and grading. Arthur Lowe 6643 N Teutonia Ave stated the road needs to be repaired but he opposes the sidewalk on the Northside of Elm St. There are very few people who use the sidewalk. Ald. Donovan moved approval with the deletion of the sidewalk based on the postcard survey, Aldermanic support, and neighborhood testimony. (Prevailed 5-0) 6th Aldermanic District E. Nash St. - N. Fratney St. to N. Holton St. (ST211120171) Concrete pavement reconstruction, widen the pavement from 24 to 36 feet, construct curb and gutter, replace all of the walk on the north side of the street, install new walk on the south side of the street, construct driveways, remove railroad crossings as necessary, sodding (new 6-foot width of tree border area), and grading. George Kolias, Tulip Molded Plastics, 714 E Keefe Ave stated this project is overly grandiose and severely impacts the business property. Jeff Bush, Coakley Relocation, stated he agrees with the previous speaker and the roadway does need to be repaved. Bob Viktora – Department of Public Works stated this is a request from Department of City Development on behalf of Riverworks . Ald. Kovac moved to Hold to the Call of the Chair to allow for a meeting with property owners. (Prevailed 5-0) 8th Aldermanic District W. Mitchell St. - S. 38th St. to Miller Park Way (Portions in the Village of West Milwaukee) (ST211150143): Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (no tree border), and grading. Ald. Donovan moved approval. (Prevailed 5-0) 10th Aldermanic District N. 53rd St. - W. Lloyd St. to W. North Ave. (ST211160133): Install traffic calming speed hump(s). Ald. Murphy stated the residents on the 2200 block are opposed to the project, so he does not support the project on the 2200 block, but does support the project on the 2100 block. Ald. Donovan moved approval with the deletion of the project on the 2200 block based on Aldermanic testimony. (Prevailed 5-0)
Pass5:0 Action details Meeting details Video Video
4/15/20160 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

Number
151847
Version
SUBSTITUTE 1
Reference
151746
Sponsor
THE CHAIR
Title
Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $458,600 for a total estimated cost of $514,000.
Analysis
This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held. The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements. The City cost of these projects approved by this resolution is estimated to be $458,600. The total estimated cost of these projects is $514,000.
Body
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

1st Aldermanic District

W. Elm St. - N. Teutonia Ave. to a point 1,600 feet west of N. Teutonia Ave. (ST211160107) File Number 151746: Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (9-foot width of tree border area), and grading. (Assessable Reconstruction Paving Fund -- $50,000; Nonassessable Reconstruction Paving Fund -- $165,000). The total estimated cost for this project including the requested amount is $245,000. This project is anticipated to be completed during the 2016 construction season.

8th Aldermanic District

W. Mitchell St. - S. 38th St. to Miller Park Way (Portions in the Village of West Milwaukee) (ST211150143) File Number 131739: Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding, and grading. (Assessable Reconstruction Paving Fund -- $20,000; Nonasse...

Click here for full text