File #: 151521    Version:
Type: Resolution Status: Passed
File created: 2/9/2016 In control: COMMON COUNCIL
On agenda: Final action: 3/1/2016
Effective date:    
Title: Resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $1,203,000 for a total estimated cost of these projects being $14,261,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
3/8/20161 MAYOR SIGNED   Action details Meeting details Not available
3/1/20161 COMMON COUNCIL ADOPTEDPass12:0 Action details Meeting details Video Video
2/17/20161 PUBLIC WORKS COMMITTEE SUBSTITUTED

Minutes note: Proposed Substitute A
Pass3:0 Action details Meeting details Video Video
2/17/20161 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Mary Dziewiontkoski - Department of Public Works
Pass3:0 Action details Meeting details Not available
2/12/20160 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
2/9/20160 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

Number

151521

Version

Substitute 1

Sponsor

THE CHAIR

Title

Resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $1,203,000 for a total estimated cost of these projects being $14,261,000.

Analysis

This resolution authorizes engineering studies on projects which by City Charter are nonassessable.  After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council.  The City cost for engineering these projects is estimated to be $1,203,000 with the total cost estimated to be $14,261,000.

Body

Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:

 

1st Aldermanic District

 

Roosevelt Dr. Bioswales:  W. Roosevelt Dr. - N. 27th St. to N. 30th St. (SM499160101):  (Storm Water Quality - Nonassessable Water Quality Projects to meet TMDL Requirements -- $5,000).  The total estimated cost for this project including the requested amount is $100,000.  This project is anticipated to be completed during the 2016 construction season.

 

W. Thurston Ave. - N. Teutonia Ave. to N. 34th St. (WT410160900):  Relaying water main.  (Nonassessable Water Fund Budget 5010 - $6,000; Nonassessable Water Fund Budget line 6410 - $14,000).  The total estimated cost for this project including the requested amount is $280,000.  This project is anticipated to be completed during the 2016 construction season.

 

N. 28th St. - Alley north of W. Hope Ave. (SE 251) to alley south of W. Roosevelt Dr. (SM495160016):  Relaying storm sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $87,000.  This project is anticipated to be completed during the 2017 construction season.

 

N. 29th St. - Alley north of W. Hope Ave. (SE 251) to alley south of W. Roosevelt Dr. (SM495160017):  Relaying storm sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $87,000.  This project is anticipated to be completed during the 2017 construction season.

 

N. 34th St. - W. Thurston Ave. to 200 feet south of W. Oriole Dr. (WT410160901):  Relaying water main.  (Nonassessable Water Fund Budget 5010 - $5,000; Nonassessable Water Fund Budget line 6410 - $10,000).  The total estimated cost for this project including the requested amount is $160,000.  This project is anticipated to be completed during the 2016 construction season.

 

N. 52nd St. - W. Hampton Ave. to 300 feet north of W. Stark St. (WT410170611):  Relaying water main.  (Nonassessable Water Fund Budget 5010 - $6,000; Nonassessable Water Fund Budget line 6410 - $14,000).  The total estimated cost for this project including the requested amount is $245,000.  This project is anticipated to be completed during the 2017 construction season.

 

1st and 9th Aldermanic District

 

W. Douglas Ave. - N. Hopkins St. to N. Sherman Blvd. (WT410170602):  Relaying water main.  (Nonassessable Water Fund Budget 5010 - $5,000; Nonassessable Water Fund Budget line 6410 - $10,000).  The total estimated cost for this project including the requested amount is $65,000.  This project is anticipated to be completed during the 2017 construction season.

 

2nd Aldermanic District

 

W. Armitage Ave. - W. Leon Tr. to W. Fond du Lac Av. (WT410170619): Water main extension.  (Nonassessable Water Fund Budget 5010 - $5,000; Nonassessable Water Fund Budget line 6410 - $10,000).  The total estimated cost for this project including the requested amount is $80,000.  This project is anticipated to be completed during the 2017 construction season.

 

W. Birch Ave. - N. 57th St. to N. 58th St. (WT410160917):  Relaying water main.  (Nonassessable Water Fund Budget 5010 - $5,000; Nonassessable Water Fund Budget line 6410 - $10,000).  The total estimated cost for this project including the requested amount is $85,000.  This project is anticipated to be completed during the 2016 construction season.

 

W. Flagg Ave. - W. Fond du Lac Ave. to N. 91st St. (WT410170617):  Relaying water main.  (Nonassessable Water Fund Budget 5010 - $6,000; Nonassessable Water Fund Budget line 6410 - $14,000).  The total estimated cost for this project including the requested amount is $270,000.  This project is anticipated to be completed during the 2017 construction season.

 

W. Leon Tr. - N. 60th St. to W. Armitage Ave. (WT410170618):  Relaying water main.  (Nonassessable Water Fund Budget 5010 - $8,000; Nonassessable Water Fund Budget line 6410 - $17,000).  The total estimated cost for this project including the requested amount is $370,000.  This project is anticipated to be completed during the 2017 construction season.

 

N. 60th St. - W. Glendale Ave. to W. Lincoln Creek Dr. (N) (WT410170621):  Relaying water main.  (Nonassessable Water Fund Budget 5010 - $5,000; Nonassessable Water Fund Budget line 6410 - $10,000).  The total estimated cost for this project including the requested amount is $80,000.  This project is anticipated to be completed during the 2017 construction season.

 

N. 60th St. - W. Villard Ave. to W. Custer Ave. (WT410160918):  Relaying water main.  (Nonassessable Water Fund Budget 5010 - $8,000; Nonassessable Water Fund Budget line 6410 - $17,000).  The total estimated cost for this project including the requested amount is $350,000.  This project is anticipated to be completed during the 2016 construction season.

 

N. 62nd St. - W. Fiebrantz Ave. to W. Congress St. (WT410160902):  Relaying water main.  (Nonassessable Water Fund Budget 5010 - $11,000; Nonassessable Water Fund Budget line 6410 - $24,000).  The total estimated cost for this project including the requested amount is $500,000.  This project is anticipated to be completed during the 2016 construction season.

 

N. 64th St. - W. Capitol Dr. to W. Hope Ave. (WT410160904):  Relaying water main.  (Nonassessable Water Fund Budget 5010 - $12,000; Nonassessable Water Fund Budget line 6410 - $28,000).  The total estimated cost for this project including the requested amount is $640,000.  This project is anticipated to be completed during the 2016 construction season.

 

N. 66th St. - W. Fiebrantz Ave. to W. Congress St. (WT410160903):  Relaying water main.  (Nonassessable Water Fund Budget 5010 - $11,000; Nonassessable Water Fund Budget line 6410 - $24,000).  The total estimated cost for this project including the requested amount is $500,000.  This project is anticipated to be completed during the 2016 construction season.

 

2nd and 7th Aldermanic Districts

 

N. 60th St. - W. Leon Tr. to W. Lincoln Creek Dr.(S) (WT410170620):  Relaying water main.  (Nonassessable Water Fund Budget 5010 - $5,000; Nonassessable Water Fund Budget line 6410 - $10,000).  The total estimated cost for this project including the requested amount is $80,000.  This project is anticipated to be completed during the 2017 construction season.

 

2nd and 9th Aldermanic Districts

 

N. 91st St. Bioswales:  N. 91st St. - W. Mill Rd. to W. Good Hope Rd. (SM499160107):  (Storm Water Quality - Nonassessable Water Quality Projects to meet TMDL Requirements -- $10,000).  The total estimated cost for this project including the requested amount is $100,000.  This project is anticipated to be completed during the 2016 construction season.

 

3rd Aldermanic District

 

E. Locust St. - N. Farwell Ave. to N. Downer Ave. (WT410170605):  Relaying water main.  (Nonassessable Water Fund Budget 5010 - $6,000; Nonassessable Water Fund Budget line 6410 - $14,000).  The total estimated cost for this project including the requested amount is $255,000.  This project is anticipated to be completed during the 2017 construction season.

 

E. Randolph Ct. - N. Dousman St. to 600 feet east of N. Dousman St. (WT410160916):  Relaying water main.  (Nonassessable Water Fund Budget 5010 - $5,000; Nonassessable Water Fund Budget line 6410 - $10,000).  The total estimated cost for this project including the requested amount is $150,000.  This project is anticipated to be completed during the 2016 construction season.

 

4th Aldermanic District

 

W. Highland Ave. Bioswales:  W. Highland Ave. - N. 12th St. to N. 27th St. (SM499160105):  (Storm Water Quality - Nonassessable Water Quality Projects to meet TMDL Requirements -- $5,000).  The total estimated cost for this project including the requested amount is $350,000.  This project is anticipated to be completed during the 2017 construction season.

 

5th Aldermanic District

 

W. Courtland Ave. - N. 91st St. to W. Herbert Ave. (WT410160920):  Relaying water main.  (Nonassessable Water Fund Budget 5010 - $6,000; Nonassessable Water Fund Budget line 6410 - $14,000).  The total estimated cost for this project including the requested amount is $225,000.  This project is anticipated to be completed during the 2016 construction season.

 

W. Debbie Ln. - N. Park Manor Dr. to N. 98th St. (WT410160913):  Relaying water main.  (Nonassessable Water Fund Budget 5010 - $6,000; Nonassessable Water Fund Budget line 6410 - $14,000).  The total estimated cost for this project including the requested amount is $200,000.  This project is anticipated to be completed during the 2016 construction season.

 

W. Marcelle Ave. - N. Park Manor Dr. to N. 98th St. (WT410160914):  Relaying water main.  (Nonassessable Water Fund Budget 5010 - $6,000; Nonassessable Water Fund Budget line 6410 - $14,000).  The total estimated cost for this project including the requested amount is $245,000.  This project is anticipated to be completed during the 2016 construction season.

 

W. Marion St. - N. 85th St. to N. 86th St. (WT410160905):  Relaying water main.  (Nonassessable Water Fund Budget 5010 - $5,000; Nonassessable Water Fund Budget line 6410 - $10,000).  The total estimated cost for this project including the requested amount is $80,000.  This project is anticipated to be completed during the 2016 construction season.

 

W. Marion St. - N. 87th St. to N. 90th St. (WT410160906):  Relaying water main.  (Nonassessable Water Fund Budget 5010 - $8,000; Nonassessable Water Fund Budget line 6410 - $17,000).  The total estimated cost for this project including the requested amount is $340,000.  This project is anticipated to be completed during the 2016 construction season.

 

W. Potomac Ave. - W. Ruby Ave. to W. Courtland Ave. (WT410170610):  Relaying water main.  (Nonassessable Water Fund Budget 5010 - $9,000; Nonassessable Water Fund Budget line 6410 - $21,000).  The total estimated cost for this project including the requested amount is $455,000.  This project is anticipated to be completed during the 2017 construction season.

 

W. Vera Ave. - N. 97th St. to N. 99th St. (WT410160921):  Relaying water main.  (Nonassessable Water Fund Budget 5010 - $5,000; Nonassessable Water Fund Budget line 6410 - $10,000).  The total estimated cost for this project including the requested amount is $155,000.  This project is anticipated to be completed during the 2016 construction season.

 

N. 80th St. - W. Congress St. to W. Ruby Ave. (WT410170609):  Relaying water main.  (Nonassessable Water Fund Budget 5010 - $5,000; Nonassessable Water Fund Budget line 6410 - $10,000).  The total estimated cost for this project including the requested amount is $70,000.  This project is anticipated to be completed during the 2017 construction season.

 

N. 81st and N. 82nd St. Bioswales:  N. 81st St. - W. Burleigh St. to W. Lisbon Ave. and N. 82nd St. - W. Burleigh St. to W. Lisbon Ave. (SM499160104):  (Storm Water Quality - Nonassessable Water Quality Projects to meet TMDL Requirements -- $5,000).  The total estimated cost for this project including the requested amount is $100,000.  This project is anticipated to be completed during the 2016 construction season.

 

N. 84th St. Bioswales:  N. 84th St. - W. Center St. to W. Hampton Ave. (SM499160103):  (Storm Water Quality - Nonassessable Water Quality Projects to meet TMDL Requirements -- $5,000).  The total estimated cost for this project including the requested amount is $100,000.  This project is anticipated to be completed during the 2016 construction season.

 

N. 91nd St. - W. Keefe Ave. to W. Metcalf Pl. (WT410170616):  Relaying water main.  (Nonassessable Water Fund Budget 5010 - $5,000; Nonassessable Water Fund Budget line 6410 - $10,000).  The total estimated cost for this project including the requested amount is $90,000.  This project is anticipated to be completed during the 2017 construction season.

 

N. 91st St. - W. Courtland Ave. to W. Hampton Ave. (WT410160919):  Relaying water main.  (Nonassessable Water Fund Budget 5010 - $5,000; Nonassessable Water Fund Budget line 6410 - $10,000).  The total estimated cost for this project including the requested amount is $155,000.  This project is anticipated to be completed during the 2016 construction season.

 

N. 92nd St. Bioswales:  N. 92nd St. - W. Capitol Dr. to W. Hampton Ave. (Portions in the City of Wauwatosa) (SM499160106):  (Storm Water Quality - Nonassessable Water Quality Projects to meet TMDL Requirements -- $10,000).  The total estimated cost for this project including the requested amount is $100,000.  This project is anticipated to be completed during the 2017 construction season.

 

N. 97th St. - W. Vera Ave. to W. Rochelle Ave. (WT410160915):  Relaying water main.  (Nonassessable Water Fund Budget 5010 - $5,000; Nonassessable Water Fund Budget line 6410 - $10,000).  The total estimated cost for this project including the requested amount is $195,000.  This project is anticipated to be completed during the 2016 construction season.

 

N. 98th St. - W. Beechwood Ave. to W. Vera Ave. (WT410160912):  Relaying water main.  (Nonassessable Water Fund Budget 5010 - $6,000; Nonassessable Water Fund Budget line 6410 - $14,000).  The total estimated cost for this project including the requested amount is $230,000.  This project is anticipated to be completed during the 2016 construction season.

 

7th Aldermanic District

 

W. Lincoln Creek Dr. - N. 57th St. to N. 60th St. (WT410170614):  Relaying water main.  (Nonassessable Water Fund Budget 5010 - $5,000; Nonassessable Water Fund Budget line 6410 - $10,000).  The total estimated cost for this project including the requested amount is $175,000.  This project is anticipated to be completed during the 2017 construction season.

 

N. 57th St. - W. Congress St. to W. Lincoln Creek Dr. (WT410170612):  Relaying water main.  (Nonassessable Water Fund Budget 5010 - $6,000; Nonassessable Water Fund Budget line 6410 - $14,000).  The total estimated cost for this project including the requested amount is $280,000.  This project is anticipated to be completed during the 2017 construction season.

 

N. 58th St. - W. Ruby Ave. to W. Lincoln Creek Dr. (WT410170613):  Relaying water main.  (Nonassessable Water Fund Budget 5010 - $5,000; Nonassessable Water Fund Budget line 6410 - $10,000).  The total estimated cost for this project including the requested amount is $125,000.  This project is anticipated to be completed during the 2017 construction season.

 

7th, 10th, and 15th Aldermanic Districts

 

W. Center St. - N. Sherman Blvd. to N. 52nd St. (SM495160022):   Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $25,000).  The total estimated cost for this project including the requested amount is $1,172,000.  This project is anticipated to be completed during the 2016 construction season.

 

9th Aldermanic District

 

N. Delta Pl. - W. Calumet Rd. to W. Port Ave. (WT410160908):  Relaying water main.  (Nonassessable Water Fund Budget 5010 - $9,000; Nonassessable Water Fund Budget line 6410 - $21,000).  The total estimated cost for this project including the requested amount is $430,000.  This project is anticipated to be completed during the 2016 construction season.

 

W. Luebbe Ln. - N. 51st Blvd. to N. Edgeworth Dr. (WT410160909):  Relaying water main.  (Nonassessable Water Fund Budget 5010 - $11,000; Nonassessable Water Fund Budget line 6410 - $24,000).  The total estimated cost for this project including the requested amount is $500,000.  This project is anticipated to be completed during the 2016 construction season.

 

N. 59th St. - W. Calumet Rd. to W. Port Ave. (WT410160907):  Relaying water main.  (Nonassessable Water Fund Budget 5010 - $5,000; Nonassessable Water Fund Budget line 6410 - $10,000).  The total estimated cost for this project including the requested amount is $170,000.  This project is anticipated to be completed during the 2016 construction season.

 

10th Aldermanic District

 

W. Melvina St. - N. 69th St. to W. Appleton Ave. (WT410170606):  Relaying water main.  (Nonassessable Water Fund Budget 5010 - $6,000; Nonassessable Water Fund Budget line 6410 - $14,000).  The total estimated cost for this project including the requested amount is $245,000.  This project is anticipated to be completed during the 2017 construction season.

 

Nash St. Bioswales:  W. Nash St. - N. 76th St. to W. Appleton Ave. (SM499160102):  (Storm Water Quality - Nonassessable Water Quality Projects to meet TMDL Requirements -- $5,000).  The total estimated cost for this project including the requested amount is $100,000.  This project is anticipated to be completed during the 2016 construction season.

 

W. Vienna Ave. - N. 66th St. to W. Appleton Ave. (WT410170608):  Relaying water main.  (Nonassessable Water Fund Budget 5010 - $8,000; Nonassessable Water Fund Budget line 6410 - $17,000).  The total estimated cost for this project including the requested amount is $390,000.  This project is anticipated to be completed during the 2017 construction season.

 

N. 70th St. - W. Vienna Ave. to W. Melvina St. (WT410170607):  Relaying water main.  (Nonassessable Water Fund Budget 5010 - $5,000; Nonassessable Water Fund Budget line 6410 - $10,000).  The total estimated cost for this project including the requested amount is $175,000.  This project is anticipated to be completed during the 2017 construction season.

 

11th Aldermanic District

 

W. Ohio Ave. - 210 feet east of S. 51st St. to S. 51st St. (WT410170600):  Relaying water main.  (Nonassessable Water Fund Budget 5010 - $5,000; Nonassessable Water Fund Budget line 6410 - $10,000).  The total estimated cost for this project including the requested amount is $70,000.  This project is anticipated to be completed during the 2017 construction season.

 

W. Stack Dr. - S. 60th St. to W. Stack Ct. (WT410160910):  Relaying water main.  (Nonassessable Water Fund Budget 5010 - $5,000; Nonassessable Water Fund Budget line 6410 - $10,000).  The total estimated cost for this project including the requested amount is $155,000.  This project is anticipated to be completed during the 2016 construction season.

 

S. 60th St. - W. Montana St. to W. Stack Dr. (WT410160911):  Relaying water main.  (Nonassessable Water Fund Budget 5010 - $5,000; Nonassessable Water Fund Budget line 6410 - $10,000).  The total estimated cost for this project including the requested amount is $160,000.  This project is anticipated to be completed during the 2016 construction season.

 

13th Aldermanic District

 

S. Avalon St./S. 15th Ct. - W. Granada St. to 1,400 feet northwest of W. Granada St. (WT410160725):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $8,000; Nonassessable Water Fund Budget Line 6410 -- $17,000).  The total estimated cost for this project including the requested amount is $350,000.  This project is anticipated to be completed during the 2016 construction season.

 

W. Granada St./S. 15th Pl. - S. 13th St. to 1,300 feet northwest of S. Avalon St. (WT410160724):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $9,000; Nonassessable Water Fund Budget Line 6410 -- $21,000).  The total estimated cost for this project including the requested amount is $415,000.  This project is anticipated to be completed during the 2016 construction season.

 

S. Taylor Ave. - S. Whitnall Ave. to E. Bolivar Ave. (SM495160015):  Relaying sanitary sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $127,000.  This project is anticipated to be completed during the 2017 construction season.

 

S. 6th St. - W. Abbott Ave. to W. Grange Ave. (WT410170615):  Relaying water main.  (Nonassessable Water Fund Budget 5010 - $11,000; Nonassessable Water Fund Budget line 6410 - $24,000).  The total estimated cost for this project including the requested amount is $585,000.  This project is anticipated to be completed during the 2017 construction season.

 

S. 24th Ct. - W. Leroy Ave. to 210 feet south of W. Leroy Ave. (WT410170601):  Relaying water main.  (Nonassessable Water Fund Budget 5010 - $5,000; Nonassessable Water Fund Budget line 6410 - $10,000).  The total estimated cost for this project including the requested amount is $70,000.  This project is anticipated to be completed during the 2017 construction season.

 

13th and 14th Aldermanic Districts

 

S. Whitnall Ave. - S. Quincy Ave. to S. Pine Ave. (SM495160018):  Relaying sanitary sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $138,000.  This project is anticipated to be completed during the 2017 construction season.

 

Various Aldermanic Districts

 

Sewer Exam Requests (SM495160020):  (Nonassessable Sewer Maintenance Relay Fund -- $50,000).  The total estimated cost for this project is $50,000.  This project is anticipated to be completed during the 2016 construction season.

 

Sewer Structure Request (SM495160021):  (Nonassessable Sewer Maintenance Relay Fund -- $50,000).  The total estimated cost for this project is $50,000.  This project is anticipated to be completed during the 2016 construction season.

 

City of Greenfield

 

W. Bottsford Ave. - 255 feet west of S. 68th St. to S. 72nd St. (WT410170604):  Relaying water main.  (Nonassessable Water Fund Budget 5010 - $6,000; Nonassessable Water Fund Budget line 6410 - $14,000).  The total estimated cost for this project including the requested amount is $280,000.  This project is anticipated to be completed during the 2017 construction season.

 

S. 72nd St. - 360 feet north of W. Bottsford Ave. to W. Bottsford Ave. (WT410170603): Abandon water main.  (Nonassessable Water Fund Budget 5010 - $5,000; Nonassessable Water Fund Budget line 6410 - $10,000).  The total estimated cost for this project including the requested amount is $40,000.  This project is anticipated to be completed during the 2017 construction season.

 

City of St. Francis

 

E. Denton Ave. - S. Barland Ave. to S. Lipton Ave. (WT410160722):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $8,000; Nonassessable Water Fund Budget Line 6410 -- $17,000).  The total estimated cost for this project including the requested amount is $325,000.  This project is anticipated to be completed during the 2016 construction season.

 

E. Denton Ave. - S. McCarty Ave. to S. Packard Ave. (WT410160723):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $110,000.  This project is anticipated to be completed during the 2016 construction season.

 

;and, be it

 

Further Resolved, That all City Departments are authorized to perform engineering, surveys, plan preparation, and determine an estimated cost thereof; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 

Requestor

Infrastructure Services Division

Drafter

Mary Dziewiontkoski/Denise Reinholtz

Npr 8

02/12/2016

 

Technical correction made on 2/29/16 by Molly Kuether   -- added a "0" for a 7th, 10th, and 15th Aldermanic District account number (W. Center St. - N. Sherman Blvd. to N. 52nd St)