Number
151420
Version
Substitute 1
Sponsor
THE CHAIR
Title
Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $555,000 for a total estimated cost of these projects being $6,620,000.
Analysis
This resolution authorizes engineering studies on projects which by City Charter are nonassessable. After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council. The City cost for engineering these projects is estimated to be $555,000 with the total cost estimated to be $6,620,000.
Body
Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:
1st Aldermanic District
W. Rohr Ave. - N. 48th St. to N. 49th St. (WT410170002): Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $10,000). The total estimated cost for this project including the requested amount is $75,000. This project is anticipated to be completed during the 2017 construction season.
2nd Aldermanic District
Hampton Avenue Bridge (6300 West) over the Lincoln Creek (BR100160103): Preliminary engineering for bridge rehabilitation. (City Share Non-assessable Structure Fund -- $200,000). The total estimated cost for this project including the requested amount is $2,200,000 This project is anticipated to be completed during the 2018 construction season.
5th Aldermanic District
Burleigh Street Bridges (9900 West) over the Menomonee River (BR100160104): Preliminary engineering for bridge rehabilitation. (City Share Non-assessable Structure Fund -- $300,000). The total estimated cost for this project including the requested amount is $3,800,000. This project is anticipated to be completed during the 2018 construction season.
6th Aldermanic District
W. McKinley Ave. - N. Dr. Martin Luther King Jr. Dr. to N. 6th St. (SM495160019): Utility relocation for W. McKinley Ave. sewer relocation. (Nonassessable Sewer Maintenance Relay Fund -- $25,000). The total estimated cost for this project including the requested amount is $445,000. This project is anticipated to be completed during the 2016 construction season.
10th Aldermanic District
N. 64th St. - W. Nash St. to 420 feet north of W. Nash St. (WT410170001): Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $10,000). The total estimated cost for this project including the requested amount is $100,000. This project is anticipated to be completed during the 2017 construction season.
;and, be it
Further Resolved, That all City Departments are authorized to perform engineering, surveys, plan preparation, and determine an estimated cost thereof; and, be it
Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it
Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.
Requestor
Infrastructure Services Division
Drafter
Mary Dziewiontkoski/Denise Reinholtz
Npr 7
01/22/2016
Technical Correction
Molly Kuether
1/27/16