File #: 151418    Version:
Type: Resolution Status: Passed
File created: 1/19/2016 In control: COMMON COUNCIL
On agenda: Final action: 2/9/2016
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $4,133,900 for a total estimated cost of $5,280,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS, SPECIAL ASSESSMENTS
Attachments: 1. Cover Letter, 2. Official Notice, 3. Notice Published on 2-25-16, 4. Notice Published on 2-25-16
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
2/18/20161 MAYOR SIGNED   Action details Meeting details Not available
2/9/20161 COMMON COUNCIL ADOPTEDPass13:0 Action details Meeting details Video Video
1/27/20161 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Mary Dziewiontkoski - Deparment of Public Works 2nd Aldermanic District W. Medford Ave. - W. Congress St. to N. 68th St. (TD04284001): Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (7-foot width of tree border area), and grading. Ald. Bohl moved approval. (Prevailed 4-0) 3rd and 6th Aldermanic Districts N. Pierce St. - E. Center St. to E. Burleigh St. (ST211120159): Concrete pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where necessary, narrow street from 38 feet to 36 feet, sodding (7-foot width of tree border area), and grading. Ald. Kovac stated he had 10 in favor and 9 opposed, he stated the project is for a wider tree border, narrower street and traffic flow issues. George Brush 3021 N Pierce St stated narrowing the street would be a disaster because of the bus traffic from Pierce School and this will not allow cars to pass in the winter. Michael Ziedler 2737 N Pierce St stated he lives across the street from Pierce School and there are school buses and parent traffic that cause a lot of congestion. There is an automatic narrowing during the winter because of the snow. Nancy Morris 2970 N Pierce St stated she and her renters don’t like the narrowing of the streets. Ald. Bohl moved approval. (Prevailed 4-0) 5th Aldermanic District N. 91st St. - W. Center St. to W. Locust St. (ST211150134): Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (9-foot width of tree border area), and grading. Ald. Bohl moved approval. (Prevailed 4-0) 6th Aldermanic District N. Holton St. - E. Capitol Dr. to E. Hope Ave. (ST211150173): Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (7-foot width of tree border area), and grading. Ald. Wade moved approval. (Prevailed 3-0) E. Hope Ave. - N. Richards St. to N. Holton St. (ST211150174): Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (7-foot width of tree border area), and grading. Ald. Wade moved approval. (Prevailed 3-0) 7th Aldermanic District N. 53rd St. - W. Roosevelt Dr. to W. Keefe Ave. (ST211150165): Concrete pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where necessary, sodding (6-foot width of tree border area), and grading. Ald. Wade moved approval. (Prevailed 3-0) 8th Aldermanic District S. 23rd St. - W. National Ave. to W. Pierce St. (ST211160109): Concrete pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where necessary, sodding (6-foot width of tree border area), and grading. Ald. Donovan moved approval. (Prevailed 4-0) S. 25th St. - W. National Ave. to W. Pierce St. (ST211060138): Asphalt pavement resurfacing, replace all curb and gutter, replace sidewalk and driveway approaches where necessary, sodding (6-foot width of tree border area), and grading. Ald. Donovan moved approval. (Prevailed 4-0) 9th Aldermanic District W. Woolworth Ave. - N. Sherman Blvd. to N. 51st St. (ST211040107): Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (5-foot width of tree border area), and grading. Ald. Bohl moved approval. (Prevailed 4-0) 11th Aldermanic District W. Howard Ave. - W. Loomis Rd. to S. 43rd St. (Sponsored by the City of Greenfield) (ST211150181): Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (15-foot width of tree border area), and grading. Ald. Wade moved approval. (Prevailed 4-0) 14th Aldermanic District E. Stewart St. - S. Marina Dr. to S. Hilbert St. (ST21100147): Concrete pavement reconstruction, replace all curb and gutter, sidewalk and driveway approaches, sodding (5-foot width of tree border area), and grading. Ald. Bohl moved approval. (Prevailed 4-0) 15th Aldermanic District N. 32nd St. - W. Lisbon Ave. to W. North Ave. (ST211140129): Concrete pavement reconstruction, replace all curb and gutter, sidewalk and driveway approaches, sodding (7-foot width of tree border area), and grading. Ald. Wade moved approval. (Prevailed 4-0)
Pass4:0 Action details Meeting details Video Video
1/19/20160 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

Number

151418

Version

SUBSTITUTE 1

Reference

150716

Sponsor

THE CHAIR

Title

Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $4,133,900 for a total estimated cost of $5,280,000.

Analysis

This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held.  The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements.  The City cost of these projects approved by this resolution is estimated to be $4,133,900.  The total estimated cost of these projects is $5,280,000.

Body

Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

 

2nd Aldermanic District

 

W. Medford Ave. - W. Congress St. to N. 68th St. (TD04284001/ST211160121):  Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (7-foot width of tree border area), and grading.  (Assessable Reconstruction Paving Fund -- $ 32,500); Nonassessable Reconstruction Paving Fund -- $5,000; TID-42 Funds $475,000).  The total estimated cost for this project including the requested amount is $700,000.  This project is anticipated to be completed during the 2016 construction season.

 

3rd and 6th Aldermanic Districts

 

N. Pierce St. - E. Center St. to E. Burleigh St. (ST211120159) File Number 150716:  Concrete pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where necessary, narrow street from 38 feet to 36 feet, sodding (7-foot width of tree border area), and grading.  (Assessable Reconstruction Paving Fund -- $34,300; Nonassessable Reconstruction Paving Fund -- $735,000).  The total estimated cost for this project including the requested amount is $800,000.  This project is anticipated to be completed during the 2016 construction season.

 

5th Aldermanic District

 

N. 91st St. - W. Center St. to W. Locust St. (ST211150134) File Number 140037:  Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (9-foot width of tree border area), and grading.  (Assessable Reconstruction Paving Fund -- $16,200; Nonassessable Reconstruction Paving Fund -- $180,000).  The total estimated cost for this project including the requested amount is $230,000.  This project is anticipated to be completed during the 2016 construction season.

 

6th Aldermanic District

 

N. Holton St. - E. Capitol Dr. to E. Hope Ave. (ST211150173) File Number 140430:  Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (7-foot width of tree border area), and grading.  (Assessable Reconstruction Paving Fund -- $31,400; Nonassessable Reconstruction Paving Fund -- $240,000).  The total estimated cost for this project including the requested amount is $295,000.  This project is anticipated to be completed during the 2016 construction season.

 

E. Hope Ave. - N. Richards St. to N. Holton St. (ST211150174) File Number 140430:  Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (7-foot width of tree border area), and grading.  (Assessable Reconstruction Paving Fund -- $9,300; Nonassessable Reconstruction Paving Fund -- $145,000).  The total estimated cost for this project including the requested amount is $170,000.  This project is anticipated to be completed during the 2016 construction season.

 

7th Aldermanic District

 

N. 53rd St. - W. Roosevelt Dr. to W. Keefe Ave. (ST211150165) File Number 140430:  Concrete pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where necessary, sodding (6-foot width of tree border area), and grading.  (Assessable Reconstruction Paving Fund -- $12,800; Nonassessable Reconstruction Paving Fund -- $190,000).  The total estimated cost for this project including the requested amount is $220,000.  This project is anticipated to be completed during the 2016 construction season.

 

8th Aldermanic District

 

S. 23rd St. - W. National Ave. to W. Pierce St. (ST211160109) File Number 150614:  Concrete pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where necessary, sodding (6-foot width of tree border area), and grading.  (Assessable Reconstruction Paving Fund -- $3,000; Nonassessable Reconstruction Paving Fund -- $45,000; TID-27 Funds -- $100,000).  The total estimated cost for this project including the requested amount is $160,000.  This project is anticipated to be completed during the 2016 construction season.

 

S. 25th St. - W. National Ave. to W. Pierce St. (ST211060138) File Number 051223:  Asphalt pavement resurfacing, replace all curb and gutter, replace sidewalk and driveway approaches where necessary, sodding (6-foot width of tree border area), and grading.  (Assessable Reconstruction Paving Fund -- $7,500; Nonassessable Reconstruction Paving Fund -- $10,000; TID-27 Funds -- $150,000).  The total estimated cost for this project including the requested amount is $180,000.  This project is anticipated to be completed during the 2016 construction season.

 

9th Aldermanic District

 

W. Woolworth Ave. - N. Sherman Blvd. to N. 51st St. (ST211040107) File Number 131474:  Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (5-foot width of tree border area), and grading.  (Assessable Reconstruction Paving Fund -- $80,000; Nonassessable Reconstruction Paving Fund -- $375,000).  The total estimated cost for this project including the requested amount is $490,000.  This project is anticipated to be completed during the 2016 construction season.

 

11th Aldermanic District

 

W. Howard Ave. - W. Loomis Rd. to S. 43rd St. (Sponsored by the City of Greenfield) (ST211150181) File Number 140816:  Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (15-foot width of tree border area), and grading.  (Assessable Reconstruction Paving Fund -- $2,700; Nonassessable Reconstruction Paving Fund -- $95,000).  The total estimated cost for this project including the requested amount is $800,000.  This project is anticipated to be completed during the 2016 construction season.

 

14th Aldermanic District

 

E. Stewart St. - S. Marina Dr. to S. Hilbert St. (ST21100147) File Number 131474:  Concrete pavement reconstruction, replace all curb and gutter, sidewalk and driveway approaches, sodding (5-foot width of tree border area), and grading.  (Assessable Reconstruction Paving Fund -- $19,200; Nonassessable Reconstruction Paving Fund -- $365,000).  The total estimated cost for this project including the requested amount is $410,000.  This project is anticipated to be completed during the 2016 construction season.

 

15th Aldermanic District

 

N. 32nd St. - W. Lisbon Ave. to W. North Ave. (ST211140129) File Number 120369:  Concrete pavement reconstruction, replace all curb and gutter, sidewalk and driveway approaches, sodding (7-foot width of tree border area), and grading.  (Assessable Reconstruction Paving Fund -- $50,000; Nonassessable Reconstruction Paving Fund -- $725,000).  The total estimated cost for this project including the requested amount is $825,000.  This project is anticipated to be completed during the 2016 construction season.

 

; and

 

Whereas, The report of the Commissioner of Public Works has been filed with the City Clerk; and

 

Whereas, Notices have been sent to all interested persons and public hearings held; now, therefore, be it

 

Resolved, By the Common Council of the City of Milwaukee, that the Commissioner of Public Works’ Report, as amended at said Public Hearing, is approved and the properties therein identified are benefited; and, be it

 

Further Resolved, That said Commissioner of Public Works is authorized and directed to proceed with said work in accordance with said report pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That the proper departments take such action as is required of them to assess the abutting or adjacent properties and collect such assessment in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts; and, be it

 

Further Resolved, That the projects do not involve any parcels of agricultural land which are eligible for deferred special assessments under the provisions of Section 14.30 of the Milwaukee City Charter; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That projects:  W. Medford Ave. (TD04284001), N. Pierce St. (ST211120159), N. 91st St. (ST211150134), N. 53rd St. (ST211150165), S. 23rd St. (ST211160109), S. 25th St. (ST211060138), W. Howard Ave. (ST211150181), E. Stewart St. (ST21100147), and N. 32nd St. (ST211140129) will be billed after January 1, 2018, but not before 12 months after the project contract has been completed; and, be it

 

Further Resolved, That project:  W. Woolworth Ave. (ST211040107) will be billed after January 1, 2019, but not before 12 months after the project contract has been completed.

 

 

 

Requestor

Infrastructure Services Division

Drafter

Mary Dziewiontkoski/Denise Reinholtz

Afr 7

01/28/2016