File #: 150848    Version:
Type: Resolution Status: Passed
File created: 10/13/2015 In control: COMMON COUNCIL
On agenda: Final action: 11/2/2015
Effective date:    
Title: Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $6,000 for a total estimated cost of these projects being $106,000.
Sponsors: THE CHAIR
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
11/11/20151 MAYOR SIGNED   Action details Meeting details Not available
11/2/20151 COMMON COUNCIL ADOPTEDPass14:0 Action details Meeting details Video Video
10/21/20151 PUBLIC WORKS COMMITTEE SUBSTITUTED

Minutes note: Proposed Substitute A Mary Dziewiontkoski - Department of Public Works
Pass5:0 Action details Meeting details Video Video
10/21/20151 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Mary Dziewiontkoski - Department of Public Works
Pass5:0 Action details Meeting details Not available
10/13/20150 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

Number

150848

Version

Substitute 1

Sponsor

THE CHAIR

Title

Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $6,000 for a total estimated cost of these projects being $106,000.

Analysis

This resolution authorizes engineering studies on projects which by City Charter are nonassessable.  After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council.  The City cost for engineering these projects is estimated to be $6,000 with the total cost estimated to be $106,000.

Body

Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:

 

2nd Aldermanic District

 

W. Custer Ave. - N. 60th St. to N. 64th St. (ST211150212):  Install traffic calming devices.  (Nonassessable Reconstruction Paving Fund -- $1,000).  The total estimated cost for this project including the requested amount is $16,000.  This project is anticipated to be completed during the 2015 construction season.

 

14th Aldermanic District

 

E. Rusk Ave. - S. Kinnickinnic Ave. Ave. to a point west (ST214150104):  Concrete alley replacement; replace curb and gutter, walk, and driveway as necessary.  (Developer Paving Fund -- $4,000).  The total estimated cost for this project including the requested amount is $35,000.  This project is anticipated to be completed during the 2015 construction season.

 

15th Aldermanic District

 

N. 17th St. - W. North Ave. to W. Lloyd St. (SM499150109):  Stormwater improvements.  (Storm Water Quality - Nonassessable Water Quality Projects to meet TMDL Requirements -- $1,000).  The total estimated cost for this project including the requested amount is $55,000.  This project is anticipated to be completed during the 2015 construction season.

 

;and, be it

 

Further Resolved, That all City Departments are authorized to perform engineering, surveys, plan preparation, and determine an estimated cost thereof; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 