powered help
header-left header-center header-right
File #: 150846    Version:
Type: Resolution Status: Passed
File created: 10/13/2015 In control: COMMON COUNCIL
On agenda: Final action: 11/2/2015
Effective date:    
Title: Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $17,000 for a total estimated cost of these projects being $710,000.
Sponsors: THE CHAIR
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
11/11/20151 MAYOR SIGNED   Action details Meeting details Not available
11/2/20151 COMMON COUNCIL ADOPTEDPass14:0 Action details Meeting details Video Video
10/21/20151 PUBLIC WORKS COMMITTEE SUBSTITUTED

Minutes note: Proposed Substitute A Mary Dziewiontkoski - Department of Public Works
Pass5:0 Action details Meeting details Video Video
10/21/20151 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Mary Dziewiontkoski - Department of Public Works
Pass5:0 Action details Meeting details Not available
10/13/20150 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available
Number
150846
Version
Substitute 1
Sponsor
THE CHAIR
Title
Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $17,000 for a total estimated cost of these projects being $710,000.
Analysis
This resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed. After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable. A resolution will be submitted after the Public Hearing authorizing construction. The City cost for engineering these projects is estimated to be $17,000 with the total cost estimated to be $710,000.
Body
Resolved, By the Common Council of the City of Milwaukee that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:

5th Aldermanic District

Alley between W. Auer Ave., W. Concordia Ave., N. 87th St., and N. 88th St. (ST212010143): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $5,000, Additional Funds). The total estimated cost for this project including the requested amount is $110,000 . This project is anticipated to be completed during the 2016 construction season.

9th Aldermanic District

N. Servite Dr. - W. Dean Rd. to a point 860 feet m/l south of W. Brown Deer Rd. (including W. Dean Rd., W. Wabash Ct., and W. Donna Ct.) (ST211130106): Paving the roadway with asphalt. Laying a concrete curb and gutter. Laying concrete sidewalk. D...

Click here for full text