File #: 150509    Version: 0
Type: Resolution Status: Passed
File created: 9/1/2015 In control: COMMON COUNCIL
On agenda: Final action: 9/22/2015
Effective date:    
Title: Resolution authorizing the Commissioner of Public Works to execute a Project Agreement titled “State/Municipal Agreement for a State - Let Highway Project” with the Wisconsin Department of Transportation for the reconstruction of the North Port Washington Road Bridge over the West Capitol Drive (STH 190) with Federal and State aid under the State Trunk Highway Program and to fund the preliminary engineering estimate of $460,000 of which $115,000 is the City of Milwaukee’s share and $345,000 is the grantor’s share.
Sponsors: THE CHAIR
Indexes: AGREEMENTS, INTERGOVERNMENTAL RELATIONS, STREETS
Attachments: 1. Agreement, 2. Comptrollers Certification

Number

150509

Version

ORIGINAL

Reference

131237

Sponsor

THE CHAIR

Title

Resolution authorizing the Commissioner of Public Works to execute a Project Agreement titled “State/Municipal Agreement for a State - Let Highway Project” with the Wisconsin Department of Transportation for the  reconstruction of the North Port Washington Road Bridge over the West Capitol Drive (STH 190) with Federal and State aid under the State Trunk Highway Program and to fund the preliminary engineering estimate of $460,000 of which $115,000 is the City of Milwaukee’s share and $345,000 is the grantor’s share.

Analysis

This Resolution authorizes the Commissioner of Public Works to execute a Project Agreement with the Wisconsin Department of Transportation for reconstruction of the North Port Washington Road Bridge over the W. Capitol Drive (STH 190) in Aldermanic District 6 with Federal and State aid and to fund the preliminary engineering estimate of $460,000 of which $115,000 is the City of Milwaukee’s share and $345,000 is the grantor’s share.  The Project Agreement provides for 100 percent Federal and State aid for construction of the project and 75 percent Federal and State aid and 25 percent local cost sharing for preliminary engineering.  The total estimated project cost is $3,957,000 of which $140,000 is the City of Milwaukee’s Share and $3,817,000 is the grantor share.  This resolution also directs the City Comptroller to transfer funds for preliminary engineering.

Body

Whereas, The Common Council adopted Resolution File Number 131237 authorizing local funding of $426,420 for preliminary engineering for the reconstruction of the North Port Washington Road Bridge over the West Capitol Drive (STH 190) with future construction funding requested through the Wisconsin Department of Transportation Local Bridge Program; and

 

Whereas, the Wisconsin Department of Transportation has determined that since the Port Washington Bridge crosses over Capitol Drive (STH 190), the bridge is eligible to be included in the State Trunk Highway Program rather than the Local Bridge Program which will result in preliminary engineering eligible for 75% Federal and State aid and construction being funded with 100% Federal and State Aid; and

 

Whereas, The improvements scheduled for this bridge are included on the current Wisconsin Department of Transportation State Trunk Highway Program; and

 

Whereas,  The reconstruction of the North Port Washington Road Bridge is programmed for construction in 2023 and construction funds for the project will be requested in a separate resolution; and

 

Whereas, It is the intent to continue preliminary engineering at this time for this bridge project; now therefore, be it

 

Resolved, By the Common Council of the City of Milwaukee, that the Commissioner of Public Works is hereby authorized to execute the agreement for the programming and reconstruction of the North Port Washington Road Bridge over the West Capitol Drive (STH 190) with Federal and State Aid, a copy of which are attached to Common Council Resolution File Number 150509, and is incorporated in this resolution by reference as though set forth in full; and be it

 

Further Resolved, That the City Comptroller is hereby authorized to create within the Capital Improvement Fund, Grant and Aid Projects, the necessary Project Grant Chartfield Values for preliminary engineering for the projects (Expenditures) and transfer to any of these accounts the amount required under the grant agreement and City Accounting Policy but not to exceed a 10 percent increase of the total amounts reserved for the grantor’s share and local share or $5,000, whichever is greater, as follows:

 

Infrastructure Services Division Accounts

State Project I.D. 2025-19-00

North Port Washington Road

Bridge over West Capitol Drive (STH 190)

 

City Share Non-Assessable Fund, Structure

BR300150000

Fund 0303

$80,500

 

Grantor Reimbursable Fund, Structure

SP032150100

Fund 0306

$210,000

 

Grantor Non-Reimbursable Cash Fund, Structure

$31,500

 

City Share Non-Assessable Fund, Paving

ST320150000

Fund 0333

$34,500

 

Grantor Reimbursable Fund, Paving

SP032150100

Fund 0306

$90,000

 

Grantor Non-Reimbursable Cash Fund, Paving

$13,500

 

Total Estimated Engineering: $460,000

Previously authorized for preliminary engineering: $-0-

Current estimated cost of total project including this resolution: $3,957,000

Original estimated cost of total project (Resolution No.______): $3,957,000

 

;and, be it

 

Further Resolved, That the City Engineer is herby authorized and directed to approve and make periodic payments to the WisDOT upon receipt of invoices for the City’s share of the costs of the project.

Requestor

Department of Public Works

Drafter

Infrastructure Services Division

C. Liberto; C. Murphy

July 21, 2015 - 12:00 noon