9/15/2015 | 0 |
HISTORIC PRESERVATION COMMISSION
| ADOPTED
Minutes note: Mr. Doerrfeld said that this is for a Certificate for building 23 at the former Pabst brewery. The work will be done on the former church. A two-story addition will be added at the rear of the building and none of the building ornamentation will be covered by the addition. Two openings will be cut in the back wall to allow access to the addition. The angle and pier buttresses are both heavily damaged and will be repaired. The masonry will be cleaned and restored. The new addition will house many of the mechanicals and ancillary functions and house the elevators and a modern staircase. The lower portion will be masonry and the second story brick. There will also be a new patio area off of the addition. One concern Mr. Doerrfeld had was alignment of the addition with the existing building. HPC staff also needs to get details on the replacement of the front door. There was a question about the enclosure for the trash containers as it is highly visible to both vehicle and pedestrian traffic and has a very industrial look to it, as well as its placement near a buttress. The staff recommends moving it to the rear and providing different screening. Staff recommends approval with conditions as outlined in the staff report with approval to be administered by staff.
Michael Kelly - Blue Ribbon Development
Jason Raiten - Engberg Anderson - there are not a lot of other places to put the trash containers, which will be roll-away, so a truck will not be menacing the buttresses.
Mark Ernst - Enberg Anderson
Mr. Jarosz questioned the joint between the church and the new addition and cautioned that the glass cannot hit the buttress and that it is set back 6" or more.
Mr. Jarosz moved, incorporating comments regarding the trash receptacles and concern about the joint and with staff conditions, seconded by Mr. Williams. There were no objections. | Pass | 5:0 |