Title
Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $121,000 for a total estimated cost of these projects being $1,728,000.
Analysis
This resolution authorizes engineering studies on projects which by City Charter are nonassessable. After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council. The City cost for engineering these projects is estimated to be $121,000 with the total cost estimated to be $1,728,000.
Body
Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:
1st Aldermanic District
W. Reichert Pl. - N. 27th St. to 240 feet west of N. 27th St. (WT410160716): Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000). The total estimated cost for this project including the requested amount is $80,000. This project is anticipated to be completed during the 2016 construction season.
2nd and 7th Aldermanic Districts
W. Fond du Lac Ave. - W. Capitol Dr. to N. 68th St. (WT410160006): Hydrant alteration. (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000). The total estimated cost for this project including the requested amount is $30,000. This project is anticipated to be completed during the 2016 construction season.
3rd Aldermanic District
Terrace Ave. Bioswales: N. Terrace Ave. - E. Belleview Pl. to E. Lafayette Pl. (SM499150106): (Storm Water Quality - Nonassessable Water Quality Projects to meet TMDL Requirements -- $5,000). The total estimated cost for this project including the requested amount is $300,000. This project is anticipated to be completed during the 2015 construction season.
7th Aldermanic District
N. 54th Blvd. - W. Vienna Ave. to 115 feet north of W. Melvina St. (SM495150049): Relaying storm sewer. (Nonassessable Sewer Maintenance Relay Fund -- $20,000). The total estimated cost for this project including the requested amount is $350,000. This project is anticipated to be completed during the 2015 construction season.
7th and 15th Aldermanic Districts
Sherman Blvd. Bioswales: N. Sherman Blvd. - W. Lisbon Ave. to W. Burleigh St. (SM499150107): (Storm Water Quality - Nonassessable Water Quality Projects to meet TMDL Requirements -- $5,000). The total estimated cost for this project including the requested amount is $400,000. This project is anticipated to be completed during the 2015 construction season.
12th Aldermanic District
W. Florida St. - S. 1st St. to a point east of S. 6th St. (TD07584011): Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding, and grading. (TID Nonassessable Paving Fund -- $30,000). The total estimated cost for this project including the requested amount is $250,000. This project is anticipated to be completed during the 2015 construction season.
14th Aldermanic District
S. Clement Ave. at E. Holt Ave. (WT410160714): Water main alteration. (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000). The total estimated cost for this project including the requested amount is $40,000. This project is anticipated to be completed during the 2016 construction season.
15th Aldermanic District
W. Kneeland St. at a point west of N. 18th Ct. (ST211150210): Replace traffic calming speed hump. (Nonassessable Reconstruction Paving Fund -- $1,000). The total estimated cost for this project is $5,000. This project is anticipated to be completed during the 2015 construction season.
W. Lloyd St. (Ext’d) - South of W. Fond du Lac Ave. to N. 20th St. (SM495150051): Relaying storm sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000). The total estimated cost for this project including the requested amount is $273,000. This project is anticipated to be completed during the 2016 construction season.
;and, be it
Further Resolved, That all City Departments are authorized to perform engineering, surveys, plan preparation, and determine an estimated cost thereof; and, be it
Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it
Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.
Requestor
Infrastructure Services Division
Drafter
Mary Dziewiontkoski/Denise Reinholtz
Npr 14
07/02/2015