powered help
header-left header-center header-right
File #: 141248    Version:
Type: Resolution Status: Passed
File created: 11/25/2014 In control: COMMON COUNCIL
On agenda: Final action: 12/16/2014
Effective date:    
Title: Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $1,313,000 for a total estimated cost of these projects being $13,965,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Number
141248
Version
SUBSTITUTE 1
Sponsor
THE CHAIR
Title
Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $1,313,000 for a total estimated cost of these projects being $13,965,000.
Analysis
This resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed.  After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable.  A resolution will be submitted after the Public Hearing authorizing construction.  The City cost for engineering these projects is estimated to be $1,313,000 with the total cost estimated to be $13,965,000.
Body
Resolved, By the Common Council of the City of Milwaukee that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:
 
1st Aldermanic District
 
N. 41st St. - W. Hampton Ave. to W. Stark St. (ST211160104):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $15,000.  The total estimated cost for this project including the requested amount is $100,000.  This project is anticipated to be completed during the 2016-2017 construction season.
 
N. 44th St. - W. Villard Ave. to W. Custer Ave. (ST211160102):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $20,000).  The total estimated cost for this project including the requested amount is $200,000.  This project is anticipated to be completed during the 2016-2017 construction season.
 
N. 48th St. - W. Villard Ave. to W. Custer Ave. (ST211160103):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $10,000).  The total estimated cost for this project including the requested amount is $75,000.  This project is anticipated to be completed during the 2016-2017 construction season.
 
2nd Aldermanic District
 
N. 95th St. - W. Carmen Ave. to a point north of W. Carmen Ave. (ST211160101):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $10,000).  The total estimated cost for this project including the requested amount is $75,000.  This project is anticipated to be completed during the 2016-2017 construction season.
 
3rd Aldermanic District
 
N. Maryland Ave. - E. Locust St. to E. Kenwood Blvd. (ST211160106):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $20,000).  The total estimated cost for this project including the requested amount is $225,000.  This project is anticipated to be completed during the 2016-2017 construction season.
 
5th Aldermanic District
 
N. 88th St. - A point south of W. Center St. to W. Center St. (ST211160105):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $8,000).  The total estimated cost for this project including the requested amount is $75,000.  This project is anticipated to be completed during the 2016-2017 construction season.
 
12th Aldermanic District
 
W. Walker St. - S. 2nd St. to S. 3rd St. (ST211150184):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $10,000).  The total estimated cost for this project including the requested amount is $100,000.  This project is anticipated to be completed during the 2015-2016 construction season.
 
City Wide
 
Administration cost for alley paving engineering (ST212150001):  (Nonassessable Alley Paving Fund -- $200,000).  The total estimated cost for this project including the requested amount is $2,025,000.  This project is anticipated to be completed during the 2015 construction season.
 
Administration cost for street paving engineering (ST211150001):  (Nonassessable Reconstruction Paving Fund -- $1,000,000.  The total estimated cost for this project including the requested amount is $10,000,000.  This project is anticipated to be completed during the 2015 construction season.
 
Various Aldermanic Districts
 
Area bounded by W. Vliet St., N. Hawley Rd., W. Vine St., and N. Hi-Mount Blvd.N./50th St.; and Area bounded by W. Mitchell St., S. 16th St., W. Becher St., W. Forest Home Ave., and S. Muskego Ave. (ST230140147):  Laying concrete walk.  Doing all necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $20,000, Additional Funds).  The total estimated cost for this project including the requested amount is $1,090,000.  This project is anticipated to be completed during the 2015 construction season.
 
; and, be it
 
Further Resolved, That the abutting and adjacent properties be assessed a portion of the cost, said assessment to be recommended by the Commissioner of Public Works in his report; and, be it
 
Further Resolved, That all assessments and payments be made in accordance with Section 115-42 of the Milwaukee Code of Ordinances; and, be it
 
Further Resolved, That all City departments are authorized to do engineering, surveying, preparing of plans, and estimates of cost thereof, to be utilized in the preparation of said report of the Commissioner of Public Works; and, be it
 
Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it
 
Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.
 
Requestor
Infrastructure Services Division
Drafter
Mary Dziewiontkoski/Denise Reinholtz
Apr 5
11/26/2014