File #: 080386    Version:
Type: Resolution Status: Passed
File created: 7/1/2008 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 7/30/2008
Effective date:    
Title: Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $65,000 for a total estimated cost of these projects being $3,006,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. Infrastructure Services Division Cover Letter, 2. Hearing notice list, 3. Fiscal note, 4. Comptroller Certification for W. Wausaukee Rd..., 5. Comptroller Certification for N. Teutonia Ave...

Number

080386

Version

SUBSTITUTE 1

Sponsor

THE CHAIR

Title

Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $65,000 for a total estimated cost of these projects being $3,006,000.

Analysis

This resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed.  After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable.  A resolution will be submitted after the Public Hearing authorizing construction.  The City cost for engineering these projects is estimated to be $65,000 with the total cost estimated to be $3,006,000.

Body

Resolved, By the Common Council of the City of Milwaukee that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:

 

2nd Aldermanic District

 

Alley between W. Capitol Dr., W. Melvina St., N. 53rd St. and N. 54th St. (ST212090105). Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $5,000).  The total estimated cost for this project including the requested amount is $44,000.  This project is anticipated to be completed during the 2009 construction season.

 

6th Aldermanic District

 

Alley between W. Brown St., N. Dr. Martin Luther King Jr. Dr., W. Lloyd St. and N. 2nd St. (ST212090104). Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $10,000).  The total estimated cost for this project including the requested amount is $75,000.  This project is anticipated to be completed during the 2009 construction season.

 

8th Aldermanic District

 

Alley between W. National Ave., W. Pierce St., S. 28th St. and S. 29th St. (ST212090103): Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $15,000).  The total estimated cost for this project including the requested amount is $115,000.  This project is anticipated to be completed during the 2009 construction season.

 

9th Aldermanic District

 

N. Wausaukee Rd. (N. 124th St.); W. County Line Rd. to W. Mequon Rd. (Sponsored by the City of Mequon) (ST320051810) (2697-05-70) File Number 071572: Asphalt pavement reconstruction; pulverize existing roadway, reconstruct with asphalt pavement and gravel shoulders. (Grantor Non-Reimbursable Paving Fund-- $25,000 Additional Funds; City Share Non-Assessable Paving Fund -- $10,000 Additional Funds).

 

These funds are to be transferred to the construction account (ST320051810) (2697-05-70).

 

Previously authorized for construction:  $170,000

 

Current estimated cost of the total project including this resolution: $2,772,000.00

 

Original estimated cost of the total project: Unknown-City of Mequon lead agent.

 

This project is anticipated to be completed during the 2008 construction season.

 

; and, be it

 

Further Resolved, That the abutting and adjacent properties be assessed a portion of the cost, said assessment to be recommended by the Commissioner of Public Works in his report; and, be it

 

Further Resolved, That all assessments and payments be made in accordance with Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That all City departments are authorized to do engineering, surveying, preparing of plans, and estimates of cost thereof, to be utilized in the preparation of said report of the Commissioner of Public Works; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 

Requestor

Infrastructure Services Division

Drafter

mld:dr

apr 13

6/24/08