Title: Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $860,000 for a total estimated cost of these projects being $14,839,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Number
140280
Version
Substitute 1
Sponsor
THE CHAIR
Title
Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $860,000 for a total estimated cost of these projects being $14,839,000.
Analysis
This resolution authorizes engineering studies on projects which by City Charter are nonassessable.  After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council.  The City cost for engineering these projects is estimated to be $860,000 with the total cost estimated to be $14,839,000.
Body
Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:
 
1st Aldermanic District
 
Area bounded by W. Congress St., W. Hope St., N. 27th St. and the Soo Line Railroad (SM495140040):  Installing new storm sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $25,000).  The total estimated cost for this project including the requested amount is $3,000,000.  This project is anticipated to be completed during the 2015 construction season.
 
W. Wren Ave. - N. 32nd St. to N. 34th St. (WT410140621):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $95,000.  This project is anticipated to be completed during the 2015 construction season.
 
N. 27th St. - W. Capitol Dr. to W. Roosevelt Dr. (SM499140103 ):  N. 27th St. Bioswales.  Water Quality Projects to meet TMDL Requirements.  (Nonassessable TSS Removal Fund -- $5,000).  The total estimated cost for this project including the requested amount is $300,000.  This project is anticipated to be completed during the 2014 construction season.
 
N. 33rd St. - 325 feet south of W. Thurston Ave. to W. Oriole Dr. (WT410140622):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $12,000; Nonassessable Water Fund Budget Line 6410 -- $13,000).  The total estimated cost for this project including the requested amount is $300,000.  This project is anticipated to be completed during the 2015 construction season.
 
2nd Aldermanic District
 
W. Derby Pl. - N. 74th St. to N. 75th St. (WT410140634):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $55,000.  This project is anticipated to be completed during the 2015 construction season.
 
W. Kaul Ave. - N. 95th St. to N. Denmark St. (WT410140624):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $10,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $200,000.  This project is anticipated to be completed during the 2015 construction season.
 
W. Lynx Ct. - 150 feet east of N. 95th St. to N. 95th St. (WT410140623):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $40,000.  This project is anticipated to be completed during the 2015 construction season.
 
N. 61st St. - W. Melvina St. to W. Capitol Dr. (WT410140639):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $140,000.  This project is anticipated to be completed during the 2015 construction season.
 
N. 62nd St. - W. Melvina St. to W. Capitol Dr. (North Side) (WT410140631):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $160,000.  This project is anticipated to be completed during the 2015 construction season.
 
N. 63rd St. - W. Capitol Dr. to W. Fiebrantz Ave. (WT410140630):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $140,000.  This project is anticipated to be completed during the 2015 construction season.
 
N. 68th St. - W. Capitol Dr. to W. Fiebrantz Ave. (WT410140632):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $140,000.  This project is anticipated to be completed during the 2015 construction season.
 
N. 69th St. - W. Silver Spring Dr. to W. Florist Ave. (WT410140648):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $17,000; Nonassessable Water Fund Budget Line 6410 -- $18,000).  The total estimated cost for this project including the requested amount is $575,000.  This project is anticipated to be completed during the 2015 construction season.
 
N. 74th St. - W. Glendale Ave. to W. Courtland Ave. (WT410140635):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $170,000.  This project is anticipated to be completed during the 2015 construction season.
 
N. 75th St. - W. Congress St. to W. Derby Pl. (WT410140633):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $15,000; Nonassessable Water Fund Budget Line 6410 -- $15,000).  The total estimated cost for this project including the requested amount is $460,000.  This project is anticipated to be completed during the 2015 construction season.
 
N. 95th St. - W. Langlade St. to W. Rio St. (WT410140625):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $10,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $220,000.  This project is anticipated to be completed during the 2015 construction season.
 
2nd and 5th Aldermanic Districts
 
Area bounded by W. Villard Ave., W. Hampton Ave., W. Fond du Lac Ave., and N. 91st St. (SM494140208):  Sanitary Sewer lining.  (Nonassessable Sewer Maintenance Relay Fund -- $25,000).  The total estimated cost for this project including the requested amount is $2,784,000.  This project is anticipated to be completed during the 2015 construction season.
 
3rd Aldermanic District
 
N. Astor St. - E. Pleasant St. to E. Kewaunee St. (SM495140042):  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $85,000.  This project is anticipated to be completed during the 2015 construction season.
 
E. Kewaunee St. - N. Cass St. to N. Astor St. (SM495140046):  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $113,000.  This project is anticipated to be completed during the 2015 construction season.
 
4th Aldermanic District
 
E. Clybourn St. - N. Milwaukee St. to N. Jefferson St. (WT410140620):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $70,000.  This project is anticipated to be completed during the 2015 construction season.
 
N. Jefferson St. - E. Chicago St. to E. Menomonee St. (WT410140619):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $155,000.  This project is anticipated to be completed during the 2015 construction season.
 
N. 25th St. - W. St. Paul Ave. to W. Clybourn St. (WT410140705):  Water main rehabilitation.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $125,000.  This project is anticipated to be completed during the 2014 construction season.
 
5th Aldermanic District
 
W. Good Hope Rd.(South Side) - N. Park Manor Dr. to N. 98th St. (WT410140651):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $10,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $280,000.  This project is anticipated to be completed during the 2015 construction season.
 
W. Lisbon Ave. - N. 92nd St. to N. Willis Pl. (WT410140629):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $10,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $290,000.  This project is anticipated to be completed during the 2015 construction season.
 
W. Melvina St. - N. 96th St. to N. 98th St. (WT410140628):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $125,000.  This project is anticipated to be completed during the 2015 construction season.
 
N. Park Manor Dr. - W. Green Tree Rd. to W. Debbie Ln. (WT410140652):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $165,000.  This project is anticipated to be completed during the 2015 construction season.
 
W. Potomac Ave. - W. Courtland Ave. to W. Derby Pl. (WT410140643):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $100,000.  This project is anticipated to be completed during the 2015 construction season.
 
W. Rochelle Ave. - N. Park Manor Dr. to N. 98th St. (WT410140650):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $10,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $275,000.  This project is anticipated to be completed during the 2015 construction season.
 
N. 94th St. - W. Elmore Ave. to W. Melvina St. (WT410140626):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $150,000.  This project is anticipated to be completed during the 2015 construction season.
 
N. 96th St. - W. Keefe Ave. to W. Nash St. (WT410140627):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $140,000.  This project is anticipated to be completed during the 2015 construction season.
 
N. 98th St. - W. Vera Ave. to W. Good Hope Rd. (WT410140649):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $10,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $235,000.  This project is anticipated to be completed during the 2015 construction season.
 
7th Aldermanic District
 
W. Burleigh St. at W. Fond du Lac Ave. (WT410140706):  Water main alteration and repair.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $60,000.  This project is anticipated to be completed during the 2014 construction season.
 
W. Leon Terr. - N. 53rd St. to W. Ely Pl. (WT410140644):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $140,000.  This project is anticipated to be completed during the 2015 construction season.
 
N. 53rd St. - W. Marion St. to W. Congress St. (WT410140645):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $145,000.  This project is anticipated to be completed during the 2015 construction season.
 
10th Aldermanic District
 
N. Pinecrest St./N. 49th St. - N. Story Pkwy to W. Blue Mound Rd. (SM495140055):  Sanitary Sewer lining and Storm Sewer lining.  (Nonassessable Sewer Maintenance Relay Fund -- $1,000).  The total estimated cost for this project including the requested amount is $220,000.  This project is anticipated to be completed during the 2014 construction season.
 
N. 66th St. - W. Vienna Ave. to W. Melvina St. (WT410140637):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $145,000.  This project is anticipated to be completed during the 2015 construction season.
 
N. 67th St. - W. Vienna Ave. to W. Melvina St. (WT410140638):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $140,000.  This project is anticipated to be completed during the 2015 construction season.
 
11th Aldermanic District
 
W. Burdick Ave. - S. 88th St. to S. 89th St. (WT410140646):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $100,000.  This project is anticipated to be completed during the 2015 construction season.
 
S. 90th St. - 720 feet north of W. Burdick Ave. to W. Burdick Ave. (WT410140647):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $160,000.  This project is anticipated to be completed during the 2015 construction season.
 
12th Aldermanic District
 
W. Florida St. - S. 4th St. to S. 5th St. (SM495140045):  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $80,000.  This project is anticipated to be completed during the 2015 construction season.
 
W. Virginia St. - S. 2nd St. to S. 5th St. (Various Locations) (SM495140043):  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $182,000.  This project is anticipated to be completed during the 2015 construction season.
 
S. 4th St. - 85 feet m/l north of W. Florida St. to W. Virginia St. (SM495140044):  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $190,000.  This project is anticipated to be completed during the 2015 construction season.
 
13th Aldermanic District
 
S. Howell Ave. - W. Howard Ave. to W. Layton Ave. (SM499140104):  S. Howell Ave. Bioswales.  Water Quality Projects to meet TMDL Requirements.  (Nonassessable TSS Removal Fund -- $5,000).  The total estimated cost for this project including the requested amount is $115,000.  This project is anticipated to be completed during the 2015 construction season.
 
S. 15th Pl. - W. Wanda Ave. to W. Klein Ave. (WT410140636):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $90,000.  This project is anticipated to be completed during the 2015 construction season.
 
14th Aldermanic District
 
E. Becher St./ E. Bay St. at S. Kinnickinnic Ave. Intersection (High Wide Truck Route) (ST211150120:  Intersection modification and traffic island modification.  (Nonassessable Reconstruction Paving Fund -- $8,000).  The total estimated cost for this project including the requested amount is $30,000.  This project is anticipated to be completed during the 2015 construction season.
 
S. Kinnickinnic Ave. - S. California St. to 300 feet m/l south of S. California St. (SM495140041):  Combined sewer lining.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $59,000.  This project is anticipated to be completed during the 2015 construction season.
 
S. Kinnickinnic Ave. - W. Morgan Ave. to W. Becher St. (SM499140102):  Kinnickinnic Ave. Stormwater Trees. Water Quality Projects to meet TMDL Requirements. (Nonassessable TSS Removal Fund -- $15,000).  The total estimated cost for this project including the requested amount is $220,000.  This project is anticipated to be completed during the 2015 construction season.
 
S. Wentworth Ave. - E. Pryor Ave. to E. Russell Ave. (SM495140057):  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $139,000.  This project is anticipated to be completed during the 2015 construction season.
 
15th Aldermanic District
 
W. Medford Ave. (Extended) (WE 166) - 65 feet northwest of W. North Ave. to W. North Ave. (WT410140617):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $25,000.  This project is anticipated to be completed during the 2015 construction season.
 
W. North Ave. - N. 15th St. to N. 19th St. (SM495140056):  Combined large diameter sewer lining.  (Nonassessable Sewer Maintenance Relay Fund -- $20,000).  The total estimated cost for this project including the requested amount is $472,000.  This project is anticipated to be completed during the 2015 construction season.
 
N. 24th St. - W. Clarke St. to W. Center St. (WT410140618):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $145,000.  This project is anticipated to be completed during the 2015 construction season.
 
Various Aldermanic Districts
 
High Impact Maintenance (ST216140106):  (Nonassessable High Impact Streets -- $1,000).  The total estimated cost for this project including the requested amount is $50,000.  This project is anticipated to be completed during the 2014 construction season.
 
High Impact Maintenance (ST216140107):  (Nonassessable High Impact Streets -- $1,000).  The total estimated cost for this project including the requested amount is $50,000.  This project is anticipated to be completed during the 2014 construction season.
 
High Impact Maintenance (ST216140108):  (Nonassessable High Impact Streets -- $1,000).  The total estimated cost for this project including the requested amount is $100,000.  This project is anticipated to be completed during the 2014 construction season.
 
City of Greenfield
 
W. Allerton Ave. - S. 62nd St. to S. 67th St. (WT410140641):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $12,000; Nonassessable Water Fund Budget Line 6410 -- $13,000).  The total estimated cost for this project including the requested amount is $330,000.  This project is anticipated to be completed during the 2015 construction season.
 
W. Armour Ave. - S. 60th St. to S. 64th St. (WT410140642):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $10,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $275,000.  This project is anticipated to be completed during the 2015 construction season.
 
S. 62nd St. - 110 feet north of W. Van Norman Ave. to W. Armour Ave. (WT410140640):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $90,000.  This project is anticipated to be completed during the 2015 construction season.
 
;and, be it
 
Further Resolved, That all City Departments are authorized to perform engineering, surveys, plan preparation, and determine an estimated cost thereof; and, be it
 
Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it
 
Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.
 