File #: 140037    Version:
Type: Resolution Status: Passed
File created: 4/22/2014 In control: COMMON COUNCIL
On agenda: Final action: 5/13/2014
Effective date:    
Title: Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $401,510 for a total estimated cost of these projects being $6,262,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. Hearing Notice List
Number
140037
Version
Substitute 1
Sponsor
THE CHAIR
Title
Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $401,510 for a total estimated cost of these projects being $6,262,000.
Analysis
This resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed.  After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable.  A resolution will be submitted after the Public Hearing authorizing construction.  The City cost for engineering these projects is estimated to be $401,510 with the total cost estimated to be $6,262,000.
Body
Resolved, By the Common Council of the City of Milwaukee that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:
 
1st Aldermanic District
 
W. Rohr Ave. - N. Sherman Blvd. to N. 51st Blvd. (ST211150157):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $30,000).  The total estimated cost for this project including the requested amount is $425,000.  This project is anticipated to be completed during the 2015 construction season.
 
5th Aldermanic District
 
W. Locust St. - N. 81st St. to N. 84th St. (ST211150137):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $20,000).  The total estimated cost for this project including the requested amount is $170,000.  This project is anticipated to be completed during the 2015 construction season.
 
W. Metcalf Pl. - N. 92nd St. to N. 97th St. (Including W. Nash St.) (ST211150138):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $25,000).  The total estimated cost for this project including the requested amount is $235,000.  This project is anticipated to be completed during the 2015 construction season.
 
W. Nash St. - N. 95th St. to N. 96th St. (ST211150139):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $18,000).  The total estimated cost for this project including the requested amount is $60,000.  This project is anticipated to be completed during the 2015 construction season.
 
N. 78th St. - W. Vienna Ave. to W. Capitol Dr. (ST211150141):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $20,000).  The total estimated cost for this project including the requested amount is $160,000.  This project is anticipated to be completed during the 2015 construction season.
 
N. 91st St. - W. Center St. to W. Locust St. (ST211150134):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $25,000).  The total estimated cost for this project including the requested amount is $225,000.  This project is anticipated to be completed during the 2015 construction season.
 
N. 95th St. - W. Keefe Ave. to W. Nash St. (ST211150135):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $18,000).  The total estimated cost for this project including the requested amount is $90,000.  This project is anticipated to be completed during the 2015 construction season.
 
6th Aldermanic District
 
E. Nash St. - N. Fratney St. to N. Holton St. (Elimination of Railroad Crossings) (Including N. Holton St. at W. Nash St.) (ST211120171):  Paving the roadway with concrete.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $10,000, Additional Funds).  The total estimated cost for this project including the requested amount is $60,000.  This project is anticipated to be completed during the 2014 construction season.
 
N. Richards St. - E. Capitol Dr. to a point north of E. Hope Ave. (ST211150156):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $30,000).  The total estimated cost for this project including the requested amount is $515,000.  This project is anticipated to be completed during the 2015 construction season.
 
7th Aldermanic District
 
N. 37th St. - W. Keefe Ave. to W. Roosevelt Ave. (ST211150152):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $35,000).  The total estimated cost for this project including the requested amount is $510,000.  This project is anticipated to be completed during the 2015 construction season.
 
9th Aldermanic District
 
W. County Line Rd. - N. 68th St. to N. Swan Blvd./N. 91st St. (Portions in the City of Mequon) (ST211100132):  Paving the roadway with asphalt.  Rural cross section.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $15,000, Additional Funds).  The total estimated cost for this project including the requested amount is $2,200,000.  This project is anticipated to be completed during the 2015 construction season.
 
W. Helena St. - N. 86th St. to N. 90th Blvd. (ST211140118):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $6,000, Additional Funds).  The total estimated cost for this project including the requested amount is $210,000.  This project is anticipated to be completed during the 2014-2015 construction season.
 
River View Subdivision - W. Fountain Ave., W. Parkland Ct., W. Lolita Ave., N. 94th St., and N. River View Ct. (ST210130103):  Asphalt pavement overlay and construct new walk.  (Assessable New Paving Fund -- $6,510, Additional Funds).  The total estimated cost for this project including the requested amount is $192,000.  This project was constructed in 2013.
 
10th Aldermanic District
 
N. Norwood Pl., W. Philip Pl., and N. 57th St. (Intersection Modifications) (ST211150149):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $15,000).  The total estimated cost for this project including the requested amount is $35,000.  This project is anticipated to be completed during the 2015 construction season.
 
N. Pinecrest St. - N. Story Pkwy. to N. 49th St. (ST211140126):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $12,000, Additional Funds).  The total estimated cost for this project including the requested amount is $215,000.  This project is anticipated to be completed during the 2014 construction season.
 
13th Aldermanic District
 
W. Denis Ave. - S. 14th St. to S. 15th Pl. (ST211150153):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $20,000).  The total estimated cost for this project including the requested amount is $120,000.  This project is anticipated to be completed during the 2015 construction season.
 
W. Eden Pl. - S. 8th St. to S. 11th St. (ST211150136):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $25,000).  The total estimated cost for this project including the requested amount is $230,000.  This project is anticipated to be completed during the 2015 construction season.
 
S. 5th Pl. - A point south of W. Plainfield Ave. to W. Howard Ave. (ST211150151):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $26,000).  The total estimated cost for this project including the requested amount is $280,000.  This project is anticipated to be completed during the 2015 construction season.
 
S. 31st St. - W. Iona Terr. To W. Green Ave. (ST211150131):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $20,000)  The total estimated cost for this project including the requested amount is $110,000.  This project is anticipated to be completed during the 2015 construction season.
 
14th Aldermanic District
 
S. Lenox St. - E. Conway St. to E. Lincoln Ave. (ST211140145):  Removing and replacing all curb and gutter.  Removing and replacing concrete sidewalk and driveway approaches where necessary.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $15,000, Additional Funds).  The total estimated cost for this project including the requested amount is $70,000.  This project is anticipated to be completed during the 2014 construction season.
 
15th Aldermanic District
 
N. 25th St. - W. Lisbon Ave. to W. Brown St. (ST211130135):  Paving the roadway with concrete.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $10,000, Additional Funds).  The total estimated cost for this project including the requested amount is $150,000.  This project is anticipated to be completed during the 2014 construction season.
 
; and, be it
 
Further Resolved, That the abutting and adjacent properties be assessed a portion of the cost, said assessment to be recommended by the Commissioner of Public Works in his report; and, be it
 
Further Resolved, That all assessments and payments be made in accordance with Section 115-42 of the Milwaukee Code of Ordinances; and, be it
 
Further Resolved, That all City departments are authorized to do engineering, surveying, preparing of plans, and estimates of cost thereof, to be utilized in the preparation of said report of the Commissioner of Public Works; and, be it
 
Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it
 
Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.
 
Requestor
Infrastructure Services Division
Drafter
MLD:dr