File #: 131586    Version: 0
Type: Resolution Status: Passed
File created: 3/4/2014 In control: COMMON COUNCIL
On agenda: Final action: 4/2/2014
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $1,392,500 for a total estimated cost of $1,503,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS, SPECIAL ASSESSMENTS
Attachments: 1. Updated Official Notice Number 81, 2. Transmittal Letter, 3. Official Notice No.pdf, 4. Hearing Notice List, 5. Afr 9.pdf, 6. Notice Published on 4-21-14
Number
131586
Version
SUBSTITUTE 1
Reference
121682
Sponsor
THE CHAIR
Title
Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $1,392,500 for a total estimated cost of $1,503,000.
Analysis
This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held.  The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements.  The City cost of these projects approved by this resolution is estimated to be $1,392,500.  The total estimated cost of these projects is $1,503,000.
Body
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:
 
3rd Aldermanic District
 
N. Maryland Ave. - E. Kenwood Blvd. to E. Hartford Ave. (ST211130176) File Number 121682:  Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (10-foot width of tree border area), and grading.  (Assessable Reconstruction Paving Fund -- $45,400; Nonassessable Reconstruction Paving Fund -- $265,000).  The total estimated cost for this project including the requested amount is $335,000.  This project is anticipated to be completed during the 2014-2015 construction season.
 
7th Aldermanic District
 
N. 49th St. - W. Parkway Dr. to W. Hampton Ave. (ST211140162):  Install traffic calming speed hump(s).  (Assessable Reconstruction Paving Fund -- $19,200; Nonassessable Reconstruction Paving Fund -- $13,000).  The total estimated cost for this project including the requested amount is $32,000.  This project is anticipated to be completed during the 2014 construction season.
 
8th Aldermanic District
 
Alley between W. Lapham St., W. Mitchell St., S. 31st St., and S. 32nd St. (ST212060127) File Number 120251:  Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, and storm drainage facilities where necessary.  (Assessable Alley Paving Fund -- $19,500; Nonassessable Alley Paving Fund -- $65,000).  The total estimated cost for this project including the requested amount is $95,000.  This project is anticipated to be completed during the 2014 construction season.
 
15th Aldermanic District
 
W. Lloyd St. - N. 35th St. to W. Lisbon Ave. (ST211130139) File Number 111698:  Concrete pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where necessary, sodding (4 - 5-foot width of tree border area), grading, and tree removal where necessary.  (Assessable Reconstruction Paving Fund -- $12,500; Nonassessable Reconstruction Paving Fund -- $150,000; TID - 40 Nonassessable Paving Fund -- $365,000).  The total estimated cost for this project including the requested amount is $575,000.  This project is anticipated to be completed during the 2014 construction season.
 
N. 37th St. - W. Meinecke Ave. to W. Clarke St. (ST211050113) File Number 131074:  Concrete pavement reconstruction, replace all curb and gutter, sidewalk and driveway approaches, sodding (4 - 5-foot width of tree border area), grading, and tree removal where necessary.  (Assessable Reconstruction Paving Fund -- $20,200; Nonassessable Reconstruction Paving Fund -- $240,000; TID - 40 Nonassessable Paving Fund -- $115,000).  The total estimated cost for this project including the requested amount is $395,000.  This project is anticipated to be completed during the 2014 construction season.
 
Alley between W. Garfield Ave., W. North Ave., N. 44th St., and N. 45th St. (ST212140117) File Number 120369:  Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, and storm drainage facilities where necessary.  (Assessable Reconstruction Paving Fund -- $12,700; Nonassessable Reconstruction Paving Fund -- $50,000).  The total estimated cost for this project including the requested amount is $71,000.  This project is anticipated to be completed during the 2014 construction season.
 
; and
 
Whereas, The report of the Commissioner of Public Works has been filed with the City Clerk; and
 
Whereas, Notices have been sent to all interested persons and public hearings held; now, therefore, be it
 
Resolved, By the Common Council of the City of Milwaukee, that the Commissioner of Public Works' Report, as amended at said Public Hearing, is approved and the properties therein identified are benefited; and, be it
 
Further Resolved, That said Commissioner of Public Works is authorized and directed to proceed with said work in accordance with said report pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it
 
Further Resolved, That the proper departments take such action as is required of them to assess the abutting or adjacent properties and collect such assessment in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it
 
Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts; and, be it
 
Further Resolved, That the projects do not involve any parcels of agricultural land which are eligible for deferred special assessments under the provisions of Section 14.30 of the Milwaukee City Charter; and, be it
 
Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it
 
Further Resolved, That projects:  N. 49th St. (ST2111140162), Alley W. Lapham St. (ST212060127), W. Lloyd St. (ST211130139), N. 37th St. (ST211050113), and Alley W. Garfield Ave. (ST212140117) will be billed after January 1, 2016, but not before 12 months after the project contract has been completed.
 
 
Requestor
Infrastructure Services Division
Drafter
MLD:dr
Afr 9
03/20/2014