Title: Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $313,000 for a total estimated cost of these projects being $3,070,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. Hearing Notice List
Number
131585
Version
Substitute 1
Sponsor
THE CHAIR
Title
Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $313,000 for a total estimated cost of these projects being $3,070,000.
Analysis
This resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed.  After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable.  A resolution will be submitted after the Public Hearing authorizing construction.  The City cost for engineering these projects is estimated to be $313,000 with the total cost estimated to be $3,070,000.
Body
Resolved, By the Common Council of the City of Milwaukee that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:
 
1st Aldermanic District
 
N. 29th St. - W. Ruby Ave. to W. Glendale Ave. (ST211150129):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $18,000).  The total estimated cost for this project including the requested amount is $145,000.  This project is anticipated to be completed during the 2015 construction season.
 
2nd Aldermanic District
 
N. 69th St. - W. Capitol Dr. to W. Hope Ave. (ST211150125):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $18,000).  The total estimated cost for this project including the requested amount is $135,000.  This project is anticipated to be completed during the 2015 construction season.
 
N. 75th St. - W. Beckett Ave. to W. Congress St. (ST211150126):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $18,000).  The total estimated cost for this project including the requested amount is $165,000.  This project is anticipated to be completed during the 2015 construction season.
 
3rd Aldermanic District
 
N. Weil St. - E. Meinecke Ave. to E. Center St. (ST211140133):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $10,000, Additional Funds).  The total estimated cost for this project including the requested amount is $200,000.  This project is anticipated to be completed during the 2014 construction season.
 
Alley between N. Bartlett Ave., E. Kenwood Blvd., E. Linnwood Ave., and N. Oakland Ave. (ST212150104):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work.  (Nonassessable Alley Paving Fund -- $12,000).  The total estimated cost for this project including the requested amount is $100,000.  This project is anticipated to be completed during the 2015 construction season.
 
4th Aldermanic District
 
Alley between W. Kilbourn Ave., W. State St., N. 26th St., and N. 27th St. (ST212150101):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work.  (Nonassessable Alley Paving Fund -- $15,000).  The total estimated cost for this project including the requested amount is $90,000.  This project is anticipated to be completed during the 2015 construction season.
 
5th Aldermanic District
 
Alley between W. Capitol Dr., W. Melvina St., N. 96th St., and N. 98th St. (ST212150109):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work.  (Nonassessable Alley Paving Fund -- $10,000).  The total estimated cost for this project including the requested amount is $110,000.  This project is anticipated to be completed during the 2015 construction season.
 
Alley between W. Metcalf Pl., W. Townsend St., N. 89th St., and N. 90th St. (ST212150103):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work.  (Nonassessable Alley Paving Fund -- $12,000).  The total estimated cost for this project including the requested amount is $110,000.  This project is anticipated to be completed during the 2015 construction season.
 
6th Aldermanic District
 
W. Concordia Ave. - N. 20th St. to N. 22nd St. (ST211150128):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $18,000).  The total estimated cost for this project including the requested amount is $155,000.  This project is anticipated to be completed during the 2015 construction season.
 
7th Aldermanic District
 
N. 41st St. - W. Courtland Ave. to W. Hampton Ave. (ST211150127):  Paving the roadway with concrete.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $20,000).  The total estimated cost for this project including the requested amount is $200,000.  This project is anticipated to be completed during the 2015 construction season.
 
Alley between W. Hope Ave., W. Marion St., N. 51st Blvd., and N. 52nd St. (ST212150108):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work.  (Nonassessable Alley Paving Fund -- $10,000).  The total estimated cost for this project including the requested amount is $115,000.  This project is anticipated to be completed during the 2015 construction season.
 
8th Aldermanic District
 
Alley between W. Arthur Ave., W. Hayes Ave., S. 30th St., and S. 31st St. (southerly east-west leg) (ST212150106):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work.  (Nonassessable Alley Paving Fund -- $10,000).  The total estimated cost for this project including the requested amount is $45,000.  This project is anticipated to be completed during the 2015 construction season.
 
10th Aldermanic District
 
Alley between N. Hawley Rd., W. Martin Dr., W. Notre Dame Ct., and N. 54th St. (omit north-south leg) (ST212150111):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work.  (Nonassessable Alley Paving Fund -- $8,000).  The total estimated cost for this project including the requested amount is $100,000.  This project is anticipated to be completed during the 2015 construction season.
 
11th Aldermanic District
 
S. 47th St. - W. Forest Home Ave. to W. Oklahoma Ave. (ST211150123):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $18,000).  The total estimated cost for this project including the requested amount is $100,000.  This project is anticipated to be completed during the 2015 construction season.
 
Alley between W. Arthur Ave., W. Finger Pl., S. 67th St., and S. 68th St. (Portions in the City of West Allis) (ST212150107):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work.  (Nonassessable Alley Paving Fund -- $10,000).  The total estimated cost for this project including the requested amount is $70,000.  This project is anticipated to be completed during the 2015 construction season.
 
Alley between W. Lakefield Dr., W. Ohio Ave., W. Ruskin St., S. 35th St., S. 36th St., and S. 37th St. (ST212150102):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work.  (Nonassessable Alley Paving Fund -- $15,000).  The total estimated cost for this project including the requested amount is $150,000.  This project is anticipated to be completed during the 2015 construction season.
 
12th Aldermanic District
 
S. 11th St. - W. Harrison Ave. to W. Lincoln Ave. (ST211150124):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $25,000).  The total estimated cost for this project including the requested amount is $355,000.  This project is anticipated to be completed during the 2015 construction season.
 
13th Aldermanic District
 
Alley between W. Denis Ave., S. Honey Creek Dr., W. Wanda Ave., and S. 41st St. (ST212150110):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work.  (Nonassessable Alley Paving Fund -- $10,000).  The total estimated cost for this project including the requested amount is $85,000.  This project is anticipated to be completed during the 2015 construction season.
 
Alley between W. Holt Ave., S. Ohio Ave., W. Sunbury Ct., S. 22nd St., S. 24th St., and S. 25th St. (ST212150105):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work.  (Nonassessable Alley Paving Fund -- $10,000).  The total estimated cost for this project including the requested amount is $60,000.  This project is anticipated to be completed during the 2015 construction season.
 
14th Aldermanic District
 
S. Brust Ave. - E. Euclid Ave. to E. Oklahoma Ave. (ST211150121):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $15,000).  The total estimated cost for this project including the requested amount is $95,000.  This project is anticipated to be completed during the 2015 construction season.
 
S. 10th St. - W. Morgan Ave. to W. Ohio Ave. (ST211150122):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $20,000).  The total estimated cost for this project including the requested amount is $265,000.  This project is anticipated to be completed during the 2015 construction season.
 
Alley between W. Holt Ave., W. Morgan Ave., S. 10th St., and S. 11th St. (ST212070110):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work.  (Nonassessable Alley Paving Fund -- $5,000, Additional Funds).  The total estimated cost for this project including the requested amount is $120,000.  This project is anticipated to be completed during the 2015 construction season.
 
15th Aldermanic District
 
N. 14th St. - W. North Ave. to W. Meinecke Ave. (ST211140170):  Traffic calming preliminary engineering.  (Nonassessable Reconstruction Paving Fund -- $1,000).  The total estimated cost for this project including the requested amount is $10,000.  This project is anticipated to be completed during the 2014 construction season.
 
Alley between W. Hadley St., W. Locust St., N. 32nd St., and N. 33rd St. (ST212050124):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work.  (Nonassessable Alley Paving Fund -- $5,000, Additional Funds).  The total estimated cost for this project including the requested amount is $90,000.  This project is anticipated to be completed during the 2015 construction season.
 
; and, be it
 
Further Resolved, That the abutting and adjacent properties be assessed a portion of the cost, said assessment to be recommended by the Commissioner of Public Works in his report; and, be it
 
Further Resolved, That all assessments and payments be made in accordance with Section 115-42 of the Milwaukee Code of Ordinances; and, be it
 
Further Resolved, That all City departments are authorized to do engineering, surveying, preparing of plans, and estimates of cost thereof, to be utilized in the preparation of said report of the Commissioner of Public Works; and, be it
 
Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it
 
Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.
 