powered help
header-left header-center header-right
File #: 071689    Version: 0
Type: Resolution Status: Passed
File created: 4/9/2008 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 5/20/2008
Effective date:    
Title: Resolution authorizes the Commissioner of Public Works and Comptroller to execute six Project Agreements with the Wisconsin Department of Transportation for traffic signal and roadway improvements and to fund preliminary engineering for these six projects in various Aldermanic Districts with a total estimated cost of $94,900.00, with an estimated grantor share of $80,910.00, and an estimated City share of $13,990.00.
Sponsors: THE CHAIR
Indexes: AGREEMENTS, STREET IMPROVEMENTS, TRAFFIC CONTROL SIGNALS, WISCONSIN DEPARTMENT OF TRANSPORTATION
Attachments: 1. Infrastructure Services Division Cover Letter, 2. Fiscal Note, 3. Agreement for 2. 27th Street Intersections, 4. Agreement for 3 Connecting Highway Intersections, 5. Agreement for 10 Intersections, 6. Agreement for West Burleigh Street, 7. Agreement for West Lincoln and 35th Street, 8. Agreement for West Oklahoma and 35th Street, 9. Comptroller's Certificate, 10. Hearing notice list, 11. Proposed Mast ARM Installations
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
5/30/20080 MAYOR SIGNED   Action details Meeting details Not available
5/20/20080 COMMON COUNCIL ADOPTEDPass13:0 Action details Meeting details Not available
5/7/20080 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Ald. Donovan made the list titled "Proposed MAST ARM installations, 2007 HES Grant Application" submitted by Mr. Clark Wantoch a part of the record.
Pass4:0 Action details Meeting details Not available
4/30/20080 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
4/9/20080 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available
Number
071689
Version
ORIGINAL
Reference

Sponsor
THE CHAIR
Title
Resolution authorizes the Commissioner of Public Works and Comptroller to execute six Project Agreements with the Wisconsin Department of Transportation for traffic signal and roadway improvements and to fund preliminary engineering for these six projects in various Aldermanic Districts with a total estimated cost of $94,900.00, with an estimated grantor share of $80,910.00, and an estimated City share of $13,990.00.
Analysis
This resolution authorizes the Commissioner of Public Works and Comptroller to execute six Project Agreements with the Wisconsin Department of Transportation for the programming and construction of traffic signal and roadway improvements using Highway Safety Improvement Program funds for projects in various Aldermanic Districts. The total estimated cost of all six projects is $934,190.00, with a grantor share of $836,270.00, and a City share of $97,920.00. The total estimated preliminary engineering cost for these six projects is $94,900.00, with a grantor share of $80,910.00 and a City share of $13, 990.00, approval of construction costs will be in a future resolution.
Body
Whereas, The submittal of five Highway Safety Improvement Program (HSIP) grant applications to the Wisconsin Department of Transportation (WISDOT) was approved by the Common Council under File Number 061544; and

Whereas, The HSIP grant application for the installation of signal improvements at 13 intersections citywide was split into 2 projects to separate projects that are located on connecting highways; and

Whereas, Preliminary approval has been requested and received from WISDOT, along with six Project Agreements to be executed by the City of Milwaukee, for the programming and construction of six projects under the 2008 HSIP; and

Whereas, WISDOT has submitted six project agreements for execution by the City of Milwaukee for the design and construction of:

Project I.D. 2984-08-07/97
T...

Click here for full text