powered help
header-left header-center header-right
File #: 061096    Version:
Type: Resolution Status: Passed
File created: 12/12/2006 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 1/17/2007
Effective date:    
Title: Substitute resolution approving construction of nonassessable public improvements at various locations and appropriating funds for these purposes with the City cost estimated to be $7,056,612, Grantor Cost is estimated to be $4,130,354 for a total estimated cost of these projects being $14,449,966.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. Infrastructure Services Division Cover Letter.pdf, 2. Fiscal note, 3. Revised fiscal note
Number
061096
Version
SUBSTITUTE 1
Reference
991756
Sponsor
THE CHAIR
Title
Substitute resolution approving construction of nonassessable public improvements at various locations and appropriating funds for these purposes with the City cost estimated to be $7,056,612, Grantor Cost is estimated to be $4,130,354 for a total estimated cost of these projects being $14,449,966.
Analysis
This resolution directs the installation and construction of certain public improvements which have been determined to be nonassessable by the Commissioner of Public Works. The City cost of the projects approved by this resolution is estimated to be $7,056,612, Grantor Cost is estimated to be $4,130,354. The total estimated cost of these projects is $14,449,966.
Body
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions determining it necessary and in the public interest to construct nonassessable improvements; and

Whereas, Plans, specifications and cost estimates have been prepared for the following described improvements:

1st Aldermanic District

N. Teutonia Ave. Bridge (and Approaches) over the Union Pacific Railroad Right of Way(ST32001901/BR32000201) (2080-06-70) File Number 991756: Concrete deck replacement and asphalt approaches. (Grantor Non-Reimbursable Paving Fund -- $235,264; Grantor Paving Reimbursable Fund -- $35,290; City Share Non-Assessable Paving Fund -- $68,662; Grantor Non-Reimbursable Structure Fund -- $2,404,000; Grantor Reimbursable Structure Fund -- $ 360,600; City Share Non-Assessable Structure Fund -- $691,150). These funds are to be transferred to the construction account (ST32001910/BR32000201) (2080-06-70).

Previously authorized for bridge and street construction: $0

Current estimated cost of the total project prior to this resolution: $4,098,966

Original estimated cost of the total project (File Number 991756): $3,404,000

This project is anticipated to be completed during the 2007 construction season.
...

Click here for full text