File #: 060698    Version:
Type: Resolution Status: Passed
File created: 9/26/2006 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 10/24/2006
Effective date:    
Title: Substitute resolution approving construction of nonassessable public improvements at various locations and appropriating funds for these purposes with the City construction cost estimated to be $4,050,100 for a total estimated cost of these projects being $18,448,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. Infrastructure Services Division Cover Letter.pdf, 2. Sub. 1 Fiscal Note, 3. Sub. 2 Fiscal note, 4. Letter to Mayor.PDF
Number
060698
Version
Substitute 2
Reference
000203
Sponsor
THE CHAIR
Title
Substitute resolution approving construction of nonassessable public improvements at various locations and appropriating funds for these purposes with the City construction cost estimated to be $4,050,100 for a total estimated cost of these projects being $18,448,000.
Analysis
This resolution directs the installation and construction of certain public improvements which have been determined to be nonassessable by the Commissioner of Public Works. The City cost of the projects approved by this resolution is estimated to be $4,050,100. The total estimated cost of these projects is $18,448,000.
Body
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions determining it necessary and in the public interest to construct nonassessable improvements; and

Whereas, Plans, specifications and cost estimates have been prepared for the following described improvements:

4th Aldermanic District

W. Kilbourn Ave. Bridge (and approaches) over the Milwaukee River (ST32090710/BR32090710) (2207-02-70): Bridge rehabilitation and concrete roadway approaches replacement. (Grantor Non-Reimbursable Structure Fund -- $2,274,000; Grantor Structure Reimbursable Fund -- $341,100; City Share Non-Assessable Structure Fund -- $654,000, additional construction funds).

Construction is scheduled for 2007/2008.

Previously authorized for bridge and street construction : $16,127,000
Current estimated costs of the total project to this resolution: $17,627,000
Original estimated costs of the total project (Resolution #000203): $1,777,000

Alley W. Cherry St., W. Galena St., N. 24th St., and N. 24th Pl. (ST214060102) File Number 051489: Concrete alley construction, replace curb and gutter and sidewalk and driveway approaches where necessary, sodding, grading, and tree removal where necessary. (Developer Paving Fund -- $75,000) The total estimated cost for this project including th...