File #: 060138    Version:
Type: Resolution Status: Passed
File created: 5/31/2006 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 6/20/2006
Effective date:    
Title: Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $80,000 for a total estimated cost of these projects being $1,317,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. Infrastructure Services Division Cover Letter.pdf, 2. Fiscal Note

 

Number

060138

Version

SUBSTITUTE 1

Sponsor

THE CHAIR

Title

Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $80,000 for a total estimated cost of these projects being $1,317,000.

Analysis

This resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed.  After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable.  A resolution will be submitted after the Public Hearing authorizing construction.  The City cost for engineering these projects is estimated to be $80,000 with the total cost estimated to be $1,317,000.

Body

Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.60 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:

 

1st. Aldermanic District

 

Alley between W. Hope Av., W. Roosevelt Dr., N. 29th St., N. 30th St. (ST21210122): Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $2,000 additional engineering funds) File Number 891600 authorized $2,600. The total estimated engineering cost including this request is $4,600. The total estimated cost for this project is estimated to be $90,000. This project is anticipated to be completed during the 2007 construction season.

 

6th Aldermanic District

 

Alley between W. Burleigh St., W. Ring St., N. 12th St., and N. 13th St. (Portion of East-West Leg) (ST212060136):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $3,000).  The total estimated cost for this project including the requested amount is $10,000.  This project is anticipated to be completed during the 2006 construction season.

 

Alley between W. Finn Pl., W. Nash St., N. 18th St., and N. 19th St. (ST212070105):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $ 8,000).  The total estimated cost for this project including the requested amount is $61,000.  This project is anticipated to be completed during the 2007 construction season.

 

8th Aldermanic District

 

Alley between W. Lapham St., W. Mitchell St., S. 31st St., S. 32nd St., (East-West Leg) (ST212060127):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $3,000 additional engineering funds) File Number 050805 authorized $10,000, total engineering including this request is $13,000. The total estimated cost for this project is $100,000. This project is anticipated to be completed during the 2007 construction season.

 

S. 38th St. - W. Greenfield Ave. to W. National Ave. (Portions in the City of West Milwaukee) (ST211060154):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $8,000, additional funds).  The total estimated cost for this project including the requested amount is $66,000.  This project is anticipated to be completed during the 2006 construction season.

 

11th Aldermanic District

 

W. Crawford Av. - W. Tripoli Av. to S. 73rd St. (Including S. 73rd St. - W. Tripoli Av. to W. Crawford Av.) (ST211060150): Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $5,000 additional funds) File Number 051444 authorized $12,000, total estimated engineering including requested amount is $17,000. Total estimated cost for this project is $110,000. This project is anticipated to be completed during the 2006 construction season.

 

S. 82nd Ct. - W. Ohio Ave. to a point 200 feet m/l north of W. Ohio Ave. (ST211070154):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $3,000) The total estimated cost for this project including the requested amount is $25,000.  This project is anticipated to be completed during the 2007 construction season.

 

W. Ohio Av. - S. 97th St. to S. 98th St. (ST211070109):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $8,000 additional engineering funds) File Number 050319 authorized $3,000, total estimated engineering including requested amount is $11,000. Total estimated cost for this project is $40,000. This project is anticipated to be completed during the 2007 construction season.

 

W. Warnimont Av. - S. 82nd St to S. 84th St. (ST211060115):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. .  (Nonassessable Reconstruction Paving Fund -- $5,000 additional engineering funds) File Number 050565 authorized $12,000, total estimated engineering including requested amount is $17,000. Total estimated cost for this project is $60,000. This project is anticipated to be completed during the 2007 construction season.

 

S. 74th St. - W. Tripoli Av. to W. Crawford Av. / W. Duluth Av. (ST211060156):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $5,000 additional engineering funds) File Number 050224 authorized $6,000, total estimated engineering including requested amount is $11,000. Total estimated cost for this project is $65,000. This project is anticipated to be completed during the 2006 construction season.

 

12th Aldermanic District

 

S. 3rd St. - W. Oregon St. to W. Pittsburgh St. (ST211050148):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $4,000 additional engineering funds) File Number 041236 authorized $4,000, total estimated engineering including requested amount is $8,000. Total estimated cost for this project is $50,000. This project is anticipated to be completed during the 2006 construction season.

 

13th Aldermanic District

 

W. Edgerton Ave. - S. Howell Ave. to S. 6th St. (ST211060129):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $5,000, additional funds).  The total estimated cost for this project including the requested amount is $435,000.  This project is anticipated to be completed during the 2006 construction season.

 

Alley between W. Barnard Ave., W. Layton Ave., S. 20th St., and S. 21st St. (ST212070114):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $13,000).  The total estimated cost for this project including the requested amount is $100,000.  This project is anticipated to be completed during the 2007 construction season.

 

15th Aldermanic District

 

Alley between W. Lisbon Ave., W. Roberts St., N. 39th St., and N. 40th St. (ST212060122):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $8,000, additional funds).  The total estimated cost for this project including the requested amount is $105,000.  This project is anticipated to be completed during the 2006 construction season.

 

; and, be it

 

Further Resolved, That the abutting and adjacent properties be assessed a portion of the cost, said assessment to be recommended by the Commissioner of Public Works in his report; and, be it

 

Further Resolved, That all assessments and payments be made in accordance with Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That all City departments are authorized to do engineering, surveying, preparing of plans, and estimates of cost thereof, to be utilized in the preparation of said report of the Commissioner of Public Works; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 

Requestor

Infrastructure Services Division

Drafter

mld:lk

apr12

06/07/06

6/9/06 Technical correction, JP