powered help
header-left header-center header-right
File #: 060029    Version:
Type: Resolution Status: Passed
File created: 5/9/2006 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 5/31/2006
Effective date:    
Title: Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes. The City engineering cost for this project is estimated to be $14,000. The total estimated cost of this project is $106,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. Infrastructure Services Division Cover Letter.pdf, 2. Fiscal note, 3. DPW-Infra. cover letter
Number
060029
Version
SUBSTITUTE 1
Sponsor
THE CHAIR
Title
Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes. The City engineering cost for this project is estimated to be $14,000. The total estimated cost of this project is $106,000.
Analysis
This resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed. After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable. A resolution will be submitted after the Public Hearing authorizing construction. The City cost for engineering these projects is estimated to be $14,000 with the total cost estimated to be $106,000.
Body
Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.60 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:

11th Aldermanic District

Alley between W. Anthony Dr., W. Forest Home Ave., W. Ohio Ave., W. Oklahoma Ave., S. 43rd St., S. 44th St., and the City Limits (ST212070113): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $14,000). The total estimated cost for this project including the requested amount is $106,000. This project is anticipated to be completed during the 2007 construction season.

; and, be it

Further Resolved, That the abutting and adjacent properties be assessed a portion of the cost, said assessment to be recommended by the Commissioner of Public Works in his report; and, be it

Further Resolved, That al...

Click here for full text