File #: 051658    Version:
Type: Resolution Status: Passed
File created: 4/11/2006 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 5/9/2006
Effective date:    
Title: Substitute resolution determining it necessary to make various nonassessable public improvements at various locations. The City engineering cost for these projects is estimated to be $1,603,000. The total estimated cost of these projects is $16,106,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. Infrastructure Services Division Cover Letter.pdf, 2. DPW-Infra. cover letter, 3. Fiscal note

Number

 051658

Version

SUBSTITUTE 1

Sponsor

THE CHAIR

Title

Substitute resolution determining it necessary to make various nonassessable public improvements at various locations.  The City engineering cost for these projects is estimated to be $1,603,000.  The total estimated cost of these projects is $16,106,000.

Analysis

This resolution authorizes engineering studies on projects which by City Charter are nonassessable.  After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council.  The City cost for engineering these projects is estimated to be $1,603,000 with the total cost estimated to be $16,106,000.

Body

Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:

 

1st Aldermanic District

 

W. Good Hope Rd. - 270 feet m/l east of N. Teutonia Ave. to N. Teutonia Ave. (WT410071075):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $60,000.  This project is anticipated to be completed during the 2007 construction season.

 

2nd Aldermanic District

 

W. Caldwell Ct. - W. Medford Ave. to 475 feet m/l west of W. Medford Ave. (WT410071031):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $100,000.  This project is anticipated to be completed during the 2007 construction season.

 

W. Custer Ave. - W. Fond du Lac Ave. to N. 83rd St. (WT410071032):  Relaying water main. (Nonassessable Water Fund -- $25,000).  The total estimated cost for this project including the requested amount is $400,000.  This project is anticipated to be completed during the 2007 construction season.

 

W. Custer Ave. - N. 57th St. to N. 60th St. (WT410071042):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $140,000.  This project is anticipated to be completed during the 2007 construction season.

 

W. Hope Ave. - N. 47th St. to N. 48th St. (WT410071018):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $65,000.  This project is anticipated to be completed during the 2007 construction season.

 

W. Hope Ave. - N. 49th St. to N. 51st St. (WT410071019):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $120,000.  This project is anticipated to be completed during the 2007 construction season.

 

W. Medford Ave. - W. Villard Ave. to W. Custer Ave. (WT410071030):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $220,000.  This project is anticipated to be completed during the 2007 construction season.

 

N. 56th St. - W. Villard Ave. to the pedestrian way at W. Rohr Ave. (WT410071041):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $150,000.  This project is anticipated to be completed during the 2007 construction season.

 

N. 65th St. - W. Hampton Ave. to W. Villard Ave. (WT410071017):  Relaying water main. (Nonassessable Water Fund -- $30,000).  The total estimated cost for this project including the requested amount is $535,000.  This project is anticipated to be completed during the 2007 construction season.

 

3rd Aldermanic District

 

N. Bartlett Ave. - N. Cambridge Ave. to E. La Fayette Pl. (WT410071005):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $160,000.  This project is anticipated to be completed during the 2007 construction season.

 

N. Farwell Ave. - E. Bradford Ave. to E. Park Pl. (WT410071060):  Relaying water main. (Nonassessable Water Fund -- $20,000).  The total estimated cost for this project including the requested amount is $265,000.  This project is anticipated to be completed during the 2007 construction season.

 

E. Greenwich Ave. - N. Murray St. to N. Frederick Ave. (WT410071059):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $70,000.  This project is anticipated to be completed during the 2007 construction season.

 

N. Summit Ave. - E. Kenilworth Pl. to E. North Ave. (SM495060017):  Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $176,000.  This project is anticipated to be completed during the winter of 2006-2007 construction season.

 

E. Windsor Pl. - N. Bartlett Ave. to N. Farwell Ave. (WT410071006):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $145,000.  This project is anticipated to be completed during the 2007 construction season.

 

E. Wyoming Pl. - N. Summit Ave. to N. Lake Dr. (SM495060019):  Lining combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $4,000).  The total estimated cost for this project including the requested amount is $28,000.  This project is anticipated to be completed during the winter of 2006-2007 construction season.

 

4th Aldermanic District

 

N. Commerce St. - N. Fratney St. to N. Holton St. (SM495060014):  Lining combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $50,000).  The total estimated cost for this project including the requested amount is $1,415,000.  This project is anticipated to be completed during the 2007 construction season.

 

W. McKinley Ave. - N. 12th St. to N. 13th St. (WT410071009):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $130,000.  This project is anticipated to be completed during the 2007 construction season.

 

N. 21st St. - W. Wisconsin Ave. to W. Wells St. (SM495060010):  Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $100,000.  This project is anticipated to be completed during the 2007 construction season.

 

N. 31st St. - W. St. Paul Ave. to W. Wisconsin Ave. (WT410071052):  Relaying water main. (Nonassessable Water Fund -- $25,000).  The total estimated cost for this project including the requested amount is $340,000.  This project is anticipated to be completed during the 2007 construction season.

 

5th Aldermanic District

 

W. Hope Ave. - W. Appleton Ave. to N. 78th St. (WT410071002):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $130,000.  This project is anticipated to be completed during the 2007 construction season.

 

W. Lynmar Ct. - N. 78th St. to a point 300 feet m/l west of N. 78th St. (WT410071004):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $75,000.  This project is anticipated to be completed during the 2007 construction season.

 

W. Lynmar Tr. - N. 80th St. to N. 83rd St. (WT410071003):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $170,000.  This project is anticipated to be completed during the 2007 construction season.

 

6th Aldermanic District

 

N. Killian Pl. - E. Lloyd St. to E. Garfield Ave. (WT410071074):  Abandon water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $25,000.  This project is anticipated to be completed during the 2007 construction season.

 

W. Somers St. - W. Cherry St. to (Vacated) N. 10th St. (WT410071013):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $105,000.  This project is anticipated to be completed during the 2007 construction season.

 

W. Vliet St. - N. 6th St. to N. 7th St. (WT410071014):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $75,000.  This project is anticipated to be completed during the 2007 construction season.

 

N. 10th St. (W. E. 609) - W. Somers St. to W. Galena Pl. (WT410071015):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $110,000.  This project is anticipated to be completed during the 2007 construction season.

 

7th Aldermanic District

 

W. Auer Ave. - N. 28th St. to N. 29th St. (WT410071076):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $70,000.  This project is anticipated to be completed during the 2007 construction season.

 

W. Congress St. (North Side) - N. Sherman Bl. To N. 46th St. (WT410071022):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $190,000.  This project is anticipated to be completed during the 2007 construction season.

 

W. Glendale Ave. - N. Sherman Bl. to N. 45th St. (WT410071021):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $150,000.  This project is anticipated to be completed during the 2007 construction season.

 

W. Roosevelt Dr. - N. 40th St. to N. Sherman Bl. (WT410071083):  Relaying water main. (Nonassessable Water Fund -- $20,000).  The total estimated cost for this project including the requested amount is $250,000.  This project is anticipated to be completed during the 2007 construction season.

 

N. 37th St. - W. Melvina St. to W. Roosevelt Dr. (WT410071082):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $70,000.  This project is anticipated to be completed during the 2007 construction season.

 

N. 46th St. - W. Congress St. to a point 200 feet m/l south of W. Glendale Ave. (WT410071020):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $200,000.  This project is anticipated to be completed during the 2007 construction season.

 

N. 60th St. - W. Hampton Ave. to W. Stark St. (WT410071016):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $75,000.  This project is anticipated to be completed during the 2007 construction season.

 

8th Aldermanic District

 

W. Greenfield Ave. - S. 29th St. to a point west of S. 30th St. (WT410071066):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $75,000.  This project is anticipated to be completed during the 2007 construction season.

 

W. Madison St. - S. 32nd St. to S. 33rd St. (SM495060016):  Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $46,000.  This project is anticipated to be completed during the 2007 construction season.

 

W. Mitchell St. - S. 33rd St. to S. 37th St. (SM495060007):  Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $21,000).  The total estimated cost for this project including the requested amount is $283,000.  This project is anticipated to be completed during the 2007 construction season.

 

35th Street Viaduct (BR100060102):  Stair repairs.  The total estimated cost for this project is $50,000, noting File Number 051659 will authorize the funds.  This project is anticipated to be completed during the 2006 construction season.

 

S. 46th St. - W. Cleveland Ave. to W. Montana St. (WT410071038):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $150,000.  This project is anticipated to be completed during the 2007 construction season.

 

S. 46th St. - W. Dakota St. to W. Manitoba St. (WT410071039):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $140,000.  This project is anticipated to be completed during the 2007 construction season.

 

S. 49th St. - W. Cleveland Ave. to the south line of W. Montana St. (WT410071040):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $160,000.  This project is anticipated to be completed during the 2007 construction season.

 

9th Aldermanic District

 

W. Rohr Ave. - N. Sherman Bl. to N. 46th St. (WT410071085):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $190,000.  This project is anticipated to be completed during the 2007 construction season.

 

N. 46th St. - W. Villard Ave. to W. Rohr Ave. (WT410071084):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $130,000.  This project is anticipated to be completed during the 2007 construction season.

 

10th Aldermanic District

 

W. Main St. - S. 61st St. to S. 65th St. (WT410071081):  Relaying water main. (Nonassessable Water Fund -- $20,000).  The total estimated cost for this project including the requested amount is $270,000.  This project is anticipated to be completed during the 2007 construction season.

 

W. Michigan Ave. - N. 35th St. to N. 39th St. (WT410071061):  Relaying water main. (Nonassessable Water Fund -- $20,000).  The total estimated cost for this project including the requested amount is $315,000.  This project is anticipated to be completed during the 2007 construction season.

 

W. Park Hill Ave. - N. 60th St. to N. 62nd St. (SM495060013):  Relaying sanitary and storm sewers. (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $196,000.  This project is anticipated to be completed during the 2007 construction season.

 

W. Washington Bl. (North Side) - N. 47th St. to N. 50th St. (WT410070001):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $180,000.  This project is anticipated to be completed during the 2007 construction season.

 

W. Washington Bl. (South Side) - N. 49th St. to N. 50th St. (WT410070002):  Abandon water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $45,000.  This project is anticipated to be completed during the 2007 construction season.

 

N. 42nd St. - W. St. Paul Ave. to 200 feet m/l north of W. St. Paul Ave. (WT410071062):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $55,000.  This project is anticipated to be completed during the 2007 construction season.

 

S. 63rd St. - A point 240 feet m/l north of W. Main St. to W. Dickinson St. (WT410071080):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $160,000.  This project is anticipated to be completed during the 2007 construction season.

 

N. 64th St. - W. Nash St. to a point 425 feet m/l north of W. Nash St. (WT410070003):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $90,000.  This project is anticipated to be completed during the 2007 construction season.

 

S. 64th St. - W. Main St. to W. Dickinson St. (WT410071079):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $115,000.  This project is anticipated to be completed during the 2007 construction season.

 

11th Aldermanic District

 

W. Arthur Ct. - S. 44th St. to a point 175 feet m/l west of S. 44th St. (WT410071029):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $45,000.  This project is anticipated to be completed during the 2007 construction season.

 

W. Crawford Ave. - S. 48th St. to S. 50th St. (WT410071054):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $130,000.  This project is anticipated to be completed during the 2007 construction season.

 

W. Forest Home Ave. - S. 51st St. to W. Morgan Ave. (WT410071067):  Relaying water main. (Nonassessable Water Fund -- $20,000).  The total estimated cost for this project including the requested amount is $260,000.  This project is anticipated to be completed during the 2007 construction season.

 

W. Lyndale Ave. - S. 48th St. to S. 50th St. (WT410071056):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $135,000.  This project is anticipated to be completed during the 2007 construction season.

 

W. Morgan Ave. - S. 27th St, to S. 34th St. (WT410071065):  Relaying water main. (Nonassessable Water Fund -- $35,000).  The total estimated cost for this project including the requested amount is $625,000.  This project is anticipated to be completed during the 2007 construction season.

 

W. Ohio Ave. - S. 58th St. to the west line of S. 60th St. (WT410071068):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $80,000.  This project is anticipated to be completed during the 2007 construction season.

 

S. 44th St. - W. Arthur Ct. to W. Kinnickinnic River Pkwy. (WT410071028):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $115,000.  This project is anticipated to be completed during the 2007 construction season.

 

S. 48th St. - W. Crawford Ave. to W. Tripoli Ave. (WT410071053):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $70,000.  This project is anticipated to be completed during the 2007 construction season.

 

S. 48th St. - W. Tripoli Ave. to W. Howard Ave. (WT410071055):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $115,000.  This project is anticipated to be completed during the 2007 construction season.

 

S. 50th St. - W. Crawford Ave. to W. Howard Ave. (WT410071057):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $125,000.  This project is anticipated to be completed during the 2007 construction season.

 

12th Aldermanic District

 

S. Barkley St. - S. Water St. to E. Pittsburgh Ave. (WT410071024):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $70,000.  This project is anticipated to be completed during the 2007 construction season.

 

W. Florida St. - S. 1st St. to a point 150 feet m/l west of S. 5th St. (WT410071023):  Relaying water main. (Nonassessable Water Fund -- $25,000).  The total estimated cost for this project including the requested amount is $365,000.  This project is anticipated to be completed during the 2007 construction season.

 

W. Harrison Ave. - S. 13th St. to S. 14th St. (WT410071070):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $75,000.  This project is anticipated to be completed during the 2007 construction season.

 

W. Historic Mitchell St. - S. 6th St. to S. 7th St. (SM495060009):  Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $62,000.  This project is anticipated to be completed during the 2007 construction season.

 

W. Lincoln Ave. - S. 15th Pl. to S. 16th St. (WT410071047):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $55,000.  This project is anticipated to be completed during the 2007 construction season.

 

W. Washington St. - S. 7th St. to S. 9th St. (SM495060011):  Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $40,000).  The total estimated cost for this project including the requested amount is $830,000.  This project is anticipated to be completed during the 2007 construction season.

 

S. 3rd St. - A point 150 feet m/l north of W. Florida St. to the south line of W. Virginia St. (WT410071025):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $130,000.  This project is anticipated to be completed during the 2007 construction season.

 

S. 14th St. - A point 170 feet m/l north of to 80 feet m/l south of W. Harrison Ave. (WT410071071):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $50,000.  This project is anticipated to be completed during the 2007 construction season.

 

S. 14th St. - W. Madison St. to W. Greenfield Ave. (WT410071058):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $75,000.  This project is anticipated to be completed during the 2007 construction season.

 

S. 15th Pl. - W. Mitchell St. to W. Burnham St. (SM495060015):  Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $10,000).  The total estimated cost for this project including the requested amount is $143,000.  This project is anticipated to be completed during the 2007 construction season.

 

S. 15th St. - W. Becher St. to W. Lincoln Ave. (WT410071051):  Relaying water main. (Nonassessable Water Fund -- $20,000).  The total estimated cost for this project including the requested amount is $260,000.  This project is anticipated to be completed during the 2007 construction season.

 

13th Aldermanic District

 

S. Madeline Ave. - W. Parnell Ave. to S. 39th St. (WT410071037):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $210,000.  This project is anticipated to be completed during the 2007 construction season.

 

W. Mallory Ave. - S. 19th St. to S. 20th St. (WT410071069):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $65,000.  This project is anticipated to be completed during the 2007 construction season.

 

W. Parnell Ave. - S. 22nd St. to S. 23rd St. (WT410071077):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $70,000.  This project is anticipated to be completed during the 2007 construction season.

 

W. Ramsey Ave. - A point 290 feet m/l west of S. Madeline Ave. to W. Parnell Ave. (WT410071033):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $85,000.  This project is anticipated to be completed during the 2007 construction season.

 

S. 5th St. - W. Norwich St. to W. Waterford Ave. (SM495060021):  Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $10,000).  The total estimated cost for this project including the requested amount is $106,000.  This project is anticipated to be completed during the 2006 construction season.

 

S. 18th St. - W. Hayes Ave. to W. Arthur Ave. (WT410071072):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $135,000.  This project is anticipated to be completed during the 2007 construction season.

 

S. 22nd St. - W. Parnell Ave. to W. Birchwood Ave. (WT410071078):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $120,000.  This project is anticipated to be completed during the 2007 construction season.

 

S. 39th St. - W. Wanda Ave. to S. Madeline Ave. (WT410071034):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $70,000.  This project is anticipated to be completed during the 2007 construction season.

 

14th Aldermanic District

 

E. Holt Ave. - S. Chase Ave. to S. Burrell St. (SM495060018):  Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $17,000).  The total estimated cost for this project including the requested amount is $223,000.  This project is anticipated to be completed during the 2007 construction season.

 

S. Howell Ave. - 220 feet m/l north of E. Holt Ave. to E. Morgan Ave. (SM495060012):  Lining sanitary and storm sewers. (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $99,000.  This project is anticipated to be completed during the 2007 construction season.

 

S. 1st St. - W. Holt Ave. to W. Warnimont Ave. (WT410071073):  Relaying water main. (Nonassessable Water Fund -- $20,000).  The total estimated cost for this project including the requested amount is $240,000.  This project is anticipated to be completed during the 2007 construction season.

 

14th Aldermanic District

 

Alley bounded by S. Ellen St., S. Kinnickinnic Ave., and E. Rusk Ave. (SM495060022):  Lining combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $10,000).  The total estimated cost for this project including the requested amount is $60,000.  This project is anticipated to be completed during the 2007 construction season.

 

15th Aldermanic District

 

W. Garfield Ave. - N. 24th Pl. to N. 25th St. (WT410071064):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $70,000.  This project is anticipated to be completed during the 2007 construction season.

 

W. Juneau Ave. - N. 35th St. to N. 38th St. (Vacated) (WT410071026):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $175,000.  This project is anticipated to be completed during the 2007 construction season.

 

W. Vine St. - N. 20th St. to N. 23td St. (WT410071063):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $210,000.  This project is anticipated to be completed during the 2007 construction season.

 

N. 37th St. - W. Wright St. to W. Clarke St. (SM495060008):  Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $13,000).  The total estimated cost for this project including the requested amount is $134,000.  This project is anticipated to be completed during the 2007 construction season.

 

N. 39th St. - W. Cherry St. to W. Galena St. (WT410071027):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $115,000.  This project is anticipated to be completed during the 2007 construction season.

 

Various Aldermanic Districts

 

Various locations. (BR100060103):  Moveable bridge remote control upgrades.   The total estimated cost for this project is $200,000, noting File Number 051659 will authorize the funds.  This project is anticipated to be completed during the 2006-2007 construction season.

 

Various locations. (ST210050001):  Administration cost for new street paving engineering.  (Nonassessable $15,000 additional funds).  The total estimated cost for this project including the requested amount is $70,000.  This project was completed in 2005.

 

Various locations. (WT410071300):  Work done by Milwaukee Water Works prior to paving (segment). (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $50,000.  This project is anticipated to be completed during the 2007 construction season.

 

Various locations. (WT410071500):  Work done by contractor prior to paving (segment). (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $250,000.  This project is anticipated to be completed during the 2007 construction season.

 

Various locations. (WT410071700):  Work done by contractor prior to sewer alterations. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $200,000.  This project is anticipated to be completed during the 2007 construction season.

 

Various locations. (WT440070000):  Suburban plan reviews. (Nonassessable Water Fund -- $40,000).  The total estimated cost for this project including the requested amount is $40,000.  This project is anticipated to be completed during the 2007 construction season.

 

Various locations. (WT410071305):  Material inspection. (Nonassessable Water Fund -- $40,000).  The total estimated cost for this project including the requested amount is $40,000.  This project is anticipated to be completed during the 2007 construction season.

 

West Milwaukee

 

S. 56th St. at W. Rogers St. (WT410061092):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $290,000.  This project is anticipated to be completed during the fall of the 2006 construction season.

 

; and, be it

 

Further Resolved, That all City Departments are authorized to perform engineering, surveys, plan preparation, and determine an estimated cost thereof; and, be it

 

Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 

Requestor

Infrastructure Services Division

Drafter

mld:lk

npr10

04/26/06