powered help
header-left header-center header-right
File #: 031736    Version:
Type: Ordinance Status: Passed
File created: 4/13/2004 In control: PUBLIC SAFETY COMMITTEE
On agenda: Final action: 5/25/2004
Effective date: 6/12/2004    
Title: Substitute ordinance relating to technical changes to the city's asbestos removal regulations.
Sponsors: THE CHAIR
Indexes: ASBESTOS, DEMOLITIONS, HAZARDOUS WASTE, NUISANCES
Attachments: 1. Fiscal Note.pdf, 2. Notice Published on June 11, 2004.PDF
Number
031736
Version
SUBSTITUTE 1
Reference
Sponsor
ALD. DONOVAN
Title
Substitute ordinance relating to technical changes to the city's asbestos removal regulations.
Sections
66-10-3 am
66-10-4-0 am
66-12-5-f rc
66-12-5-g-1-d am
66-12-9-b am
66-12-9-m cr
66-12-12-10 rc
Analysis
In order to comply with current regulations and guidelines established by the federal occupational safety and health administration, environmental protection agency, and the Wisconsin department of natural resources, this ordinance makes technical changes to update and revise the city's asbestos removal regulations.
Body
The Mayor and Common Council of the City of Milwaukee do ordain as follows:

Part 1.Section 66-10-3 and 4-0 of the code is amended to read:

66-10. Definitions.

3. ASBESTOS CONTAINING MATERIAL means any material that contains [[1% or greater]] >>greater than 1%<< asbestos by weight, volume or other analytical method acceptable to the commissioner.

4. ASBESTOS PROJECT means any form of work performed in connection with the alteration, renovation, modification or demolition of a [[building or structure]] >>building, structure or equipment as defined in 200-08 or contaminated soil<< which will disturb asbestos containing material in the following amounts:

Part 2.Section 66-12-5-f of the code is repealed and recreated to read:
66-12. Asbestos Hazard Control.

5. ASBESTOS PROJECT PERMIT AND PLAN REQUIRED.

f. An applicant applying for a permit under s. 200-24 for the following purposes shall not be required to obtain an asbestos permit:

f-1. New building construction, including electrical and plumbing work.

f-2. Any work involving a one or two family residential garage.

f-3. Work affecting one or 2-family buildings, except where boiler repair or replacement is involved and amounts listed in s. 66-10-4 are exceeded.

f-4. Category I (NESHAP) resilient asphalt roofing and siding products containing more th...

Click here for full text