powered help
header-left header-center header-right
File #: 020390    Version:
Type: Resolution Status: Passed
File created: 6/25/2002 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 7/16/2002
Effective date:    
Title: Substitute resolution determining it necessary to make various assessable public improvements at various locations.
Sponsors: THE CHAIR
Indexes: ALLEY IMPROVEMENTS, PUBLIC IMPROVEMENTS, SPECIAL ASSESSMENTS, STREET IMPROVEMENTS
Attachments: 1. Fiscal Note.pdf, 2. Infr. Serv. Div. cover letter.pdf, 3. Sub 1FISCAL NOTE.pdf

Number
020390
Version
SUBSTITUTE 1
Sponsor
THE CHAIR
Title
Substitute resolution determining it necessary to make various assessable public improvements at various locations.
Analysis
This resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed. After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable. A resolution will be submitted after the Public Hearing authorizing construction.
Body
Resolved, By the Common Council of the City of Milwaukee that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:

1st Aldermanic District

N. 47th St. – W. Hampton Ave. to W. Fairmount Ave. (ST21100116): Paving the roadway with asphalt. Laying a concrete curb and gutter. Laying concrete sidewalk. Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $15,000)

W. Glendale Ave. – N. 27th St. to N. 32nd St. (ST21100134): Paving the roadway with asphalt. Laying a concrete curb and gutter. Laying concrete sidewalk. Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $15,000)

N. Montreal St. – W. Capitol Dr. to W. Hope Ave. (ST211030111): Paving the roadway with asphalt. Laying a concrete curb and gutter. Laying concrete sidewalk. Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $15,000)

2nd Aldermanic District

N. 73rd St. – W. Hampton Ave. to W. Fairmount Ave. (ST211020106): Paving the roadway with asphalt. ...

Click here for full text