NUMB:
000317
VERS:
SUBSTITUTE 1
REF:
XXBY:
THE CHAIR
TITL:
Substitute resolution authorizing and directing the Commissioner of Public Works to execute a Memorandum of Understanding with the Milwaukee Metropolitan Sewerage District, Milwaukee County, and the City of Wauwatosa for the planning, designing and construction of a storm water detention facility at Timmerman Airport.
ANLS:
________________________________________ - Analysis - This substitute resolution authorizes the Commissioner of Public Works to execute a Memorandum of Understanding relating to the planning, designing and construction of a storm water detention facility at Timmerman Airport. _______________________________________
BODY:
WHEREAS, The Grantosa Creek experiences flooding during large rain events; and
WHEREAS, Several engineering studies performed for the Grantosa Creek Watershed have recommended the construction of a storm water detention facility on Timmerman Airport to reduce the existing flooding; and
WHEREAS, The Milwaukee Metropolitan Sewerage District (District) has prepared a Memorandum of Understanding with Milwaukee County(County), the City of Milwaukee and the City of Wauwatosa regarding the planning, designing and construction of a storm water detention facility at Timmerman Airport; and
WHEREAS, The Memorandum of Understanding (Memorandum) requires the cost to design and construct the storm water detention facility to be equally shared by the District, the County and the City of Wauwatosa; and
WHEREAS, The maintenance costs of the facility shall be shared by the District and the County; and
WHEREAS, The Memorandum requires the City of Milwaukee to issue any necessary permits for the storm water detention facility and provide any necessary inspection related to those permits at no cost to the other parties of this agreement; now, therefore, be it
RESOLVED, By the Common Council of the City of Milwaukee that the Commissioner of...
Click here for full text