File #: 130232    Version:
Type: Resolution Status: Passed
File created: 6/11/2013 In control: COMMON COUNCIL
On agenda: Final action: 7/2/2013
Effective date:    
Title: Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $34,200 for a total estimated cost of these projects being $495,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. Hearing Notice List
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
7/12/20131 MAYOR SIGNED   Action details Meeting details Not available
7/2/20131 COMMON COUNCIL ADOPTEDPass15:0 Action details Meeting details Not available
6/19/20130 PUBLIC WORKS COMMITTEE SUBSTITUTED

Minutes note: Individual appearing: Mary Dziewiontkoski, Department of Public Works Proposed Substitute A was accepted.
Pass5:0 Action details Meeting details Video Video
6/19/20131 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTIONPass5:0 Action details Meeting details Not available
6/14/20130 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
6/14/20130 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
6/11/20130 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available
 
Number
130232
Version
Substitute 1
Sponsor
THE CHAIR
Title
Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $34,200 for a total estimated cost of these projects being $495,000.
Analysis
This resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed.  After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable.  A resolution will be submitted after the Public Hearing authorizing construction.  The City cost for engineering these projects is estimated to be $34,200 with the total cost estimated to be $495,000.
Body
Resolved, By the Common Council of the City of Milwaukee that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:
 
5th Aldermanic District
 
N. 83rd St. - W. Congress St. to W. Ruby Ave. (ST211110122):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Assessable Reconstruction Paving Fund -- $2,200, Additional Funds).  The total estimated cost for this project including the requested amount is $80,000.  This project was completed in 2012.
 
8th Aldermanic District
 
Alley between W. Branting Ln., W. Greenfield Ave., S. 35th St., and S. 36th St. (Southerly east-west leg and southerly half of north-south leg) (ST212130113):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work.  (Nonassessable Alley Paving Fund -- $5,000).  The total estimated cost for this project including the requested amount is $70,000.  This project is anticipated to be completed during the 2013 construction season.
 
9th Aldermanic District
 
River View Subdivision - W. Fountain Ave., W. Parkland Ct., W. Lolita Ave., N. 94th St., and N. River View Ct. (ST210130103):  Paving the roadway with asphalt and laying concrete walk.  Doing all necessary grading pertaining to said work.  (Nonassessable New Paving Fund -- $20,000).  The total estimated cost for this project including the requested amount is $230,000.  This project is anticipated to be completed during the 2013 construction season.
 
14th Aldermanic District
 
S. Burrell St. - E. Morgan Ave. to the Union Pacific Railroad Right-of-Way (ST211130143):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $7,000, Additional Funds).  The total estimated cost for this project including the requested amount is $115,000.  This project is anticipated to be completed during the 2013 construction season.
 
; and, be it
 
Further Resolved, That the abutting and adjacent properties be assessed a portion of the cost, said assessment to be recommended by the Commissioner of Public Works in his report; and, be it
 
Further Resolved, That all assessments and payments be made in accordance with Section 115-42 of the Milwaukee Code of Ordinances; and, be it
 
Further Resolved, That all City departments are authorized to do engineering, surveying, preparing of plans, and estimates of cost thereof, to be utilized in the preparation of said report of the Commissioner of Public Works; and, be it
 
Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it
 
Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.
 
Requestor
Infrastructure Services Division
Drafter
MLD:dr
Apr 14
06/13/2013