Title: Substitute resolution authorizing city-wide sidewalk replacement at various areas and school sites and appropriating funds for these purposes with the city construction cost estimated to be $1,300,000 for a total estimated cost of these projects being $1,400,000.
Sponsors: THE CHAIR
Indexes: SIDEWALK IMPROVEMENTS, SIDEWALKS
Number
120138
Version
SUBSTITUTE 1

REFERENCE
Sponsor
THE CHAIR
Title
Substitute resolution authorizing city-wide sidewalk replacement at various areas and school sites and appropriating funds for these purposes with the city construction cost estimated to be $1,300,000 for a total estimated cost of these projects being $1,400,000.
Analysis
To provide the necessary authority for sidewalk repairs at various areas and school sites. The City cost of these projects approved by this resolution is estimated to be $1,300,000. The total estimated cost of these projects is $1,400,000.
Body
Whereas, It is necessary and in the public interest to replace those sidewalk stones which are cracked, broken, out of grade or otherwise a hazard to pedestrians; and

Whereas, It is proposed that sidewalk replacement work be done in the following locations at the indicated cost:

Area bounded by N. 60th St., W. Burleigh St., N . 64th St./N. Avondale Rd., South City Limits (south of W. Center St.) (#1) in the 10th Aldermanic District and, Various School Sites (ST230120140) File Number 110564: Laying concrete walk. Doing all necessary grading pertaining to said work. ($250,000 to the Assessable Sidewalk Fund ST230120140; and $500,000 to the Nonassessable Sidewalk Fund ST230120140). The total estimated cost for this project including the requested amount is $750,000. This project is anticipated to be completed during the 2012 construction season.

Area bounded by S. 6th St., W. Oklahoma Ave., S. 13th St., UP RR Right-of-Way (south of W. Cleveland Ave.) (#2) in the 14th Aldermanic District (ST230120144): Laying concrete walk. Doing all necessary grading pertaining to said work. ($200,000 to the Assessable Sidewalk Fund ST230120144; and $350,000 to the Nonassessable Sidewalk Fund ST230120144). The total estimated cost for this project including the requested amount is $550,000. This project is anticipated to be completed during the 2012 construction season.

Further R...