File #: 120112    Version:
Type: Resolution Status: Passed
File created: 5/22/2012 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 6/12/2012
Effective date:    
Title: Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $452,000 for a total estimated cost of these projects being $4,489,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
 
Number
120112
Version
Substitute 1
Sponsor
THE CHAIR
Title
Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $452,000 for a total estimated cost of these projects being $4,489,000.
Analysis
This resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed.  After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable.  A resolution will be submitted after the Public Hearing authorizing construction.  The City cost for engineering these projects is estimated to be $452,000 with the total cost estimated to be $4,489,000.
Body
Resolved, By the Common Council of the City of Milwaukee that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:
 
1st Aldermanic District
 
W. Linwal Ln. - N. 26th St. to the cul-de-sac 180 feet m/l west of N. 26th St. (ST211140104):  Paving the roadway with concrete.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $6,000).  The total estimated cost for this project including the requested amount is $45,000.  This project is anticipated to be completed during the 2014 construction season.
 
N. 38th St. - W. Custer Ave. to W. Sheridan Ave. (ST211140112):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $9,000).  The total estimated cost for this project including the requested amount is $90,000.  This project is anticipated to be completed during the 2014 construction season.
 
N. 42nd St. - W. Fairmount Ave. to W. Villard Ave. (ST211140114):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $26,000).  The total estimated cost for this project including the requested amount is $275,000.  This project is anticipated to be completed during the 2014 construction season.
 
N. 52nd St. - W. Villard Ave. to W. Silver Spring Dr. (ST211140109):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $32,000).  The total estimated cost for this project including the requested amount is $300,000.  This project is anticipated to be completed during the 2014 construction season.
 
Alley between W. Fairmount Ave., W. Villard Ave., N. 51st Blvd., and N. 53rd St. (North-South Leg) (ST212140103):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work.  (Nonassessable Alley Paving Fund -- $15,000).  The total estimated cost for this project including the requested amount is $160,000.  This project is anticipated to be completed during the 2014 construction season.
 
5th Aldermanic District
 
N. Colonial Dr. - W. Burleigh St. to W. Auer Ave. (ST211140105):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $20,000).  The total estimated cost for this project including the requested amount is $147,000.  This project is anticipated to be completed during the 2014 construction season.
 
N. 77th St. - W. Keefe Ave. to W. Capitol Dr. (ST211140108):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $30,000).  The total estimated cost for this project including the requested amount is $270,000.  This project is anticipated to be completed during the 2014 construction season.
 
N. 79th St. - N. 78th St. to W. Hope Ave. (ST211140106):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $11,000).  The total estimated cost for this project including the requested amount is $97,000.  This project is anticipated to be completed during the 2014 construction season.
 
6th Aldermanic District
 
N. 2nd St. - W. North Ave. to W. Center St. (ST211140116):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $77,000).  The total estimated cost for this project including the requested amount is $805,000.  This project is anticipated to be completed during the 2014 construction season.
 
8th Aldermanic District
 
Alley between W. Greenfield Ave., S. Layton Blvd., W. Scott St., and S. 28th St. (ST212140104):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work.  (Nonassessable Alley Paving Fund -- $13,000).  The total estimated cost for this project including the requested amount is $130,000.  This project is anticipated to be completed during the 2014 construction season.
 
Alley between W. Greenfield Ave., W. Madison St., S. 31st St., and S. 33rd St. (ST212140105):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work.  (Nonassessable Alley Paving Fund -- $8,000).  The total estimated cost for this project including the requested amount is $80,000.  This project is anticipated to be completed during the 2014 construction season.
 
9th Aldermanic District
 
W. Beatrice St. - N. 96th St. to N. 97th St. (Including N. 97th St. - W. Beatrice St. to N. Michele St.) (ST211140111):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $21,000).  The total estimated cost for this project including the requested amount is $200,000.  This project is anticipated to be completed during the 2014 construction season.
 
W. Helena St. - N. 86th St. to N. 90th Blvd. (ST211140118):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $21,000).  The total estimated cost for this project including the requested amount is $200,000.  This project is anticipated to be completed during the 2014 construction season.
 
W. Spokane St. - N. 60th St. to N. 64th St. (ST211140119):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $18,000).  The total estimated cost for this project including the requested amount is $165,000.  This project is anticipated to be completed during the 2014 construction season.
 
N. 72nd St. - A point south of W. Brown Deer Rd. to W. Brown Deer Rd. (ST211140113):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $18,000).  The total estimated cost for this project including the requested amount is $175,000.  This project is anticipated to be completed during the 2014 construction season.
 
N. 81st St. - W. Calumet Rd. to W. Bradley Rd. (ST211140115):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $50,000).  The total estimated cost for this project including the requested amount is $485,000.  This project is anticipated to be completed during the 2014 construction season.
 
10th Aldermanic District
 
S. 83rd St. - A point south of W. Dixon St. to W. Dixon St. (ST211140110):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $5,000).  The total estimated cost for this project including the requested amount is $43,000.  This project is anticipated to be completed during the 2014 construction season.
 
11th Aldermanic District
 
S. 71st St. - W. Kinnickinnic River Pkwy. to W. Cleveland Ave. (ST211140107):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $22,000).  The total estimated cost for this project including the requested amount is $207,000.  This project is anticipated to be completed during the 2014 construction season.
 
Alley between W. Cleveland Ave., W. Fremont Pl., S. 63rd St., and S. 67th St. (ST212140102):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work.  (Nonassessable Alley Paving Fund -- $10,000).  The total estimated cost for this project including the requested amount is $100,000.  This project is anticipated to be completed during the 2014 construction season.
 
12th Aldermanic District
 
S. 5th St. - W. Scott St. to W. Virginia St. (ST211140117):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $40,000).  The total estimated cost for this project including the requested amount is $515,000.  This project is anticipated to be completed during the 2014 construction season.
 
; and, be it
 
Further Resolved, That the abutting and adjacent properties be assessed a portion of the cost, said assessment to be recommended by the Commissioner of Public Works in his report; and, be it
 
Further Resolved, That all assessments and payments be made in accordance with Section 115-42 of the Milwaukee Code of Ordinances; and, be it
 
Further Resolved, That all City departments are authorized to do engineering, surveying, preparing of plans, and estimates of cost thereof, to be utilized in the preparation of said report of the Commissioner of Public Works; and, be it
 
Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it
 
Further Resolved, That the City Comptroller is directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.
 
Requestor
Infrastructure Services Division
Drafter
MLD:dr
Apr 12
05/24/2012