File #: 111698    Version:
Type: Resolution Status: Passed
File created: 4/11/2012 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 5/22/2012
Effective date:    
Title: Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $157,000 for a total estimated cost of these projects being $2,463,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. Hearing Notice List
Number
111698
Version
Substitute 1
Sponsor
THE CHAIR
Title
Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $157,000 for a total estimated cost of these projects being $2,463,000.
Analysis
This resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed.  After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable.  A resolution will be submitted after the Public Hearing authorizing construction.  The City cost for engineering these projects is estimated to be $157,000 with the total cost estimated to be $2,463,000.
Body
Resolved, By the Common Council of the City of Milwaukee that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:
 
2nd Aldermanic District
 
W. Marion St. - N. 61st St. to N. 64th St. (ST211120140):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $10,000, Additional Funds).  The total estimated cost for this project including the requested amount is $129,000.  This project is anticipated to be completed during the 2012 construction season.
 
5th Aldermanic District
 
Alley between W. Capitol Dr., W. Fiebrantz Ave., W. Fiebrantz Ct., and N. 81st St. (ST212140101):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work.  (Nonassessable Alley Paving Fund -- $10,000).  The total estimated cost for this project including the requested amount is $99,000.  This project is anticipated to be completed during the 2014 construction season.
 
6th Aldermanic District
 
N. 3rd St. - W. Auer Ave. to W. Keefe Ave. (ST21110116):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $15,000, Additional Funds).  The total estimated cost for this project including the requested amount is $500,000.  This project is anticipated to be completed during the 2013 construction season.
 
10th Aldermanic District
 
S. 76th St. - The South City Limits (south of W. Main St.) to W. Kearney St. (ST211030105):  Paving the roadway with concrete.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $10,000, Additional Funds).  The total estimated cost for this project including the requested amount is $593,500.  This project was constructed in 2011.
 
11th Aldermanic District
 
W. Crawford Ave. - S. 45th St. to S. 47th St. (Portions in the City of Greenfield) (ST211140102):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $11,000).  The total estimated cost for this project including the requested amount is $113,000.  This project is anticipated to be completed during the 2014 construction season.
 
S. 45th St. - W. Tripoli Ave. to W. Crawford Ave. (Portions in the City of Greenfield) (ST211140103):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $8,000).  The total estimated cost for this project including the requested amount is $61,500.  This project is anticipated to be completed during the 2014 construction season.
 
S. 53rd St. - W. Montana St. to W. Cleveland Ave. (ST211140101):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $9,000).  The total estimated cost for this project including the requested amount is $92,000.  This project is anticipated to be completed during the 2014 construction season.
 
15th Aldermanic District
 
W. Lloyd St. - N. 35th St. to W. Lisbon Ave. (ST211130139):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $47,000).  The total estimated cost for this project including the requested amount is $494,000.  This project is anticipated to be completed during the 2013 construction season.
 
W. Monroe St. - N. 18th St. to W. North Ave. (ST211130140):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $12,000).  The total estimated cost for this project including the requested amount is $128,000.  This project is anticipated to be completed during the 2014 construction season.
 
N. 18th St. - W. Fond du Lac Ave. to W. North Ave. (ST211130141):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $15,000).  The total estimated cost for this project including the requested amount is $158,000.  This project is anticipated to be completed during the 2014 construction season.
 
Alley between W. Brown St., W. Lisbon Ave., N. 38th St., and N. 39th St. (ST212120112):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work.  (Nonassessable Alley Paving Fund -- $10,000).  The total estimated cost for this project including the requested amount is $95,000.  This project is anticipated to be completed during the 2013 construction season.
 
; and, be it
 
Further Resolved, That the abutting and adjacent properties be assessed a portion of the cost, said assessment to be recommended by the Commissioner of Public Works in his report; and, be it
 
Further Resolved, That all assessments and payments be made in accordance with Section 115-42 of the Milwaukee Code of Ordinances; and, be it
 
Further Resolved, That all City departments are authorized to do engineering, surveying, preparing of plans, and estimates of cost thereof, to be utilized in the preparation of said report of the Commissioner of Public Works; and, be it
 
Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it
 
Further Resolved, That the City Comptroller is directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.
 
Requestor
Infrastructure Services Division
Drafter
MLD:dr
Apr 11
05/03/2012