File #: 111022    Version:
Type: Resolution Status: Passed
File created: 11/30/2011 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 12/20/2011
Effective date:    
Title: Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $1,347,000 for a total estimated cost of these projects being $20,644,500.
Sponsors: THE CHAIR
Indexes: ALLEY IMPROVEMENTS, STREET IMPROVEMENTS
Attachments: 1. Hearing Notice List
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
12/27/20111 MAYOR SIGNED   Action details Meeting details Not available
12/20/20111 COMMON COUNCIL ADOPTEDPass15:0 Action details Meeting details Not available
12/7/20111 CITY CLERK DRAFT SUBMITTED   Action details Meeting details Not available
12/7/20110 PUBLIC WORKS COMMITTEE SUBSTITUTED

Minutes note: Individual appearing: Mary Dziewiontkoski, Department of Public Works-Infrastructure Services Proposed Substitute A accepted.
Pass4:0 Action details Meeting details Not available
12/7/20111 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTIONPass4:0 Action details Meeting details Not available
12/5/20110 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
12/5/20110 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
11/30/20110 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available
Number
111022
Version
Substitute 1
Sponsor
THE CHAIR
Title
Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $1,347,000 for a total estimated cost of these projects being $20,644,500.
Analysis
This resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed. After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable. A resolution will be submitted after the Public Hearing authorizing construction. The City cost for engineering these projects is estimated to be $1,347,000 with the total cost estimated to be $20,644,500.
Body
Resolved, By the Common Council of the City of Milwaukee that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:

3rd Aldermanic District

Alley between E. Center St., N. Humboldt Ave., and the CMC Real Estate Corp. Right-of-Way (ST212050113): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $2,000, Additional Funds). The total estimated cost for this project including the requested amount is $52,000. This project is anticipated to be completed during the 2012 construction season.

4th Aldermanic District

N. 8th St. - W. Michigan St. to W. Wisconsin Ave. (ST211130134): Paving the roadway with asphalt. Laying a concrete curb and gutter. Laying concrete sidewalk. Doing all the necessary grading pertaining to said work. (Nonas...