powered help
header-left header-center header-right
File #: 240276    Version:
Type: Resolution Status: In Council-Adoption
File created: 6/11/2024 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action:
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $1,315,385 for a total estimated cost of $1,526,400.
Sponsors: THE CHAIR
Attachments: 1. AD 13.pdf, 2. Signed AD, 3. Signed Letter
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
6/20/20241 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Holly Rutenbeck - DPW 1st Aldermanic District N. 30th St. - W. Atkinson Ave. to W. Hampton Ave. (ST211220209) Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (24' width of tree border area), grading, storm drainage facilities, and green infrastructure as necessary. Grant, by Ald. Brostoff. Prevailed. 4-0. 2nd Aldermanic District N. 58th St. — W. Villard Ave. to W. Custer Ave. (ST211240107) Install traffic calming speed hump(s). Ms. Rutenbeck said that out of 44 impacted properties, 12 are in support, 4 in opposition and that the alderman supports the project. Neighbors present: Floyd Nash - 5436 N. 58th St. - supports Grant, by Ald. Brostoff. Prevailed. 4-0 N. 67th St. - W. Glendale Ave. to W. Courtland Ave. (ST211240106) Install traffic calming speed hump(s). Ms. Rutenbeck said the alderman supports the project based on the postcard survey results. Grant, by Ald. Brostoff. Prevailed. 5-0 W. Medford Ave. - N. 65th St. to W. Constance Ave. (ST211240108) Install traffic calming speed hump(s). Ms. Rutenbeck said the out of 24 impacted properties, 5 are in favor, 3 in opposition and that alderman supports the project. Neighbors present: Laura Glover - 6514 W. Medford Ave. - she hasn't seen speeding, but there are a lot of cars that park on the street that this will impact. Grant, by Ald. Taylor. Prevailed. 5-0 3rd Aldermanic District N. Astor St. - E. Lyon St. to E. Brady St. (ST211240117) Install traffic calming speed hump(s). Grant, by Ald. Brostoff. Prevailed. 5-0 N. Cambridge St. - E. Irving Pl. to E. North Ave. (ST211240119) Install traffic calming speed hump(s). Grant, by Ald Brostoff. Prevailed. 5-0 N. Cambridge St. - N. Oakland Ave. to E. Boylston St. (ST211240118) Install traffic calming speed hump(s). Grant, by Ald. Brostoff. Prevailed. 5-0 N. Cass St. - E. Brady St. to E. Pearson St. (ST211240116) Install traffic calming speed hump(s). Grant, by Ald. Brostoff. Prevailed. 5-0 E. Pearson St. - N. Marshall St. to N. Water St. (ST211240115) Install traffic calming speed hump(s). Neighbors present: Robert Berkin - 818 E. Pearson St. - opposed to speed humps on his street as he doesn't see speed as being a major concern; wrong-way driving and shootings are worse Lawrence Baruzzini - 804 E. Pearson St. - agrees with Mr. Berkin; speeding isn't an issue, going the wrong way is the issue. Marcella Baruzzini- 812 E. Pearson St. - opposed as traffic going through there is primarily looking for parking. Traffic is slow enough currently. She is concerned that this is just a done deal and she would like to have this put on hold as she doesn't think the neighbors on this two-block stretch are aware of this. Hold to the call of the chair, by Ald. Brostoff. Prevailed. 5-0 5th Aldermanic District N. 81st St. - W. Fiebrantz Ave. to W. Hope Ave. (ST211240123) Install traffic calming speed hump(s). Grant, by Ald. Westmoreland. Prevailed. 5-0 N. 83rd St. - W. Nash St. to W. Vienna Ave. (ST211240125) Install traffic calming speed hump(s). Grant, by Ald. Westmoreland. Prevailed. 5-0 N. 87th St. - W. Hampton Ave. to W. Stark St. (ST211240122) Install traffic calming speed hump(s). Grant, by Ald. Westmoreland. Prevailed. 5-0 N. 105th St. - W. Cameron Ave. to W. Caldwell Ave. (ST211240121) Install traffic calming speed hump(s). Grant, by Ald. Westomoreland. Prevailed. 5-0 N. 105th St. - W. Hampton Ave. to W. Stark St. (ST211240120) Install traffic calming speed hump(s). Grant, by Ald. Westmoreland. Prevailed. 5-0 W. Metcalf Pl. - W. Nash St. to N. Willis Pl. (ST211240124) Install traffic calming speed hump(s). Grant, by Ald. Westmoreland. Prevailed. 5-0 6th Aldermanic District N. 7th St. - W. Vienna Ave. to W. Abert Pl. (ST211240127) Install traffic calming speed hump(s). Ms. Rutenbeck said that out of 20 impacted properties, 4 were in favor and none in opposition. Neighbors present: Nellie Madison - 3804 N. 7th St. - thinks they're needed, but wants to know the cost. Robert Gresch - 3834 N. 7th St. - supports due to the playground in the area. Grant, by Ald. Coggs. Prevailed. 5-0 N. 10th St. - W. Nash St to W. Abert Pl. (ST211240126) Install traffic calming speed hump(s). Grant, by Ald. Coggs. Prevailed. 5-0 8th Aldermanic District S. 37th St. - W. Becher St. to W. Burnham St. (ST211210223) Concrete pavement reconstruction, replace all curb and gutter and driveway approaches, replace concrete sidewalk where necessary, narrow sidewalk to 5' where necessary, sodding, (8' width of tree border area), grading and tree removal where necessary. Neighbors present: Andy Kochanski - 1920 S. 37th St and 1926 S. 37th St. - he and 2 business neighbors are opposed to replacement and shortening of the sidewalks and moving the lights from the east side of the street. The existing lights are fine with the neighborhood. The lights are owned by WE Energies. He supports replacing the street. Molly Newberry - Wisconsin Lifting Specialists - in favor as the street and sidewalk have failed. She is concerned about getting their products delivered. Bobby Newberry - Wisconsin Lifting Specialists - has the business concerns mentioned by his wife, Molly, but does support street replacement. Ald. Zamarripa - said that all neighbors are in support of the street and she would like to pass this today to not delay the project and she will be in contact with the neighbors. Grant, by Ald. Brostoff. Prevailed. 5-0 10th Aldermanic District N. 61st St. - W. Keefe Ave. to W. Nash St. (ST211240132) Install traffic calming speed hump(s). Ms. Rutenbeck said that the alderwoman supports the project based on the postcard survey results. Grant, by Ald. Taylor. Prevailed. 5-0 13th Aldermanic District W. Vogel Ave. - S. 14th St. to S. 16th St. (ST211210164) Install traffic calming speed hump(s). Ms. Rutenbeck said that the alderman supports the project based on the postcard survey results. Grant, by Ald. Taylor. Prevailed. 5-0 14th Aldermanic District E. Bradley Ave. - S. Whitnall Ave. to S. Howell Ave. (ST211240135) Install traffic calming speed hump(s). Ms. Rutenbeck said that out of 25 impacted properties, eight are in favor and none in objection. Neighbors present: Rose Wallace - 3707 S. Whitnall Ave. - her son and granddaughter live there and they are opposed as there is no speeding on that street. Granddaughter talked to the neighbors and the ones she spoke to were opposed. Janice Guetchidjian -- 330 E Bradley St. - opposed as traffic from other areas is causing their problem and see how that traffic can be changed. Reckless driving is an issue. She would prefer stop signs. Ms. Rutenbeck said that the alderwoman supports the project based on the postcard survey results. Grant, by Ald. Brostoff. Prevailed. 5-0 W. Montana St. - S. 9th Pl. to S. 12th St. (ST211240134) Install traffic calming speed hump(s). Ms. Rutenbeck said that the alderwoman supports the project based on the postcard survey results. Grant, by Ald. Taylor. Prevailed. 5-0 S. New York Ave. - E. Fernwood Ave. to E. Oklahoma Ave. (ST211240133) Install traffic calming speed hump(s). Ms. Rutenbeck said that the alderwoman supports the project based on the postcard survey results. Grant, by Ald. Brostoff. Prevailed. 5-0 E. Norwich St. — S. Pine Ave. to S. Whitnall Ave. (ST211240143) Install traffic calming speed hump(s). Ms. Rutenbeck said that out of 35 impacted properties, 9 are in favor and 2 in opposition. She added that the alderwoman supports the project. Neighbors present: Kim Pribek - 453 E. Norwich Ave. -- opposed - hasn't seen speeding on this stretch of street. Opposed Laura Pribeck - 451 E. Norwich Ave. Grant, by Ald. Taylor. Prevailed. 5-0 E. Ohio Ave. - S. Griffin Ave. to S. Whitnall Ave. (ST211240142) Install traffic calming speed hump(s). Ms. Rutenbeck said that the alderwoman supports the project based on the postcard survey results. Grant, by Ald. Brosttoff. Prevailed. 5-0 15th Aldermanic District N. 22nd St. - W, Wright St. to W. Clarke St. (ST211150202) Install traffic calming speed hump(s). Ms. Rutenbeck said that the alderman supports the project. Grant, by Ald. Taylor. Prevailed. 5-0 Ald. Taylor moved approval of the file 240276 as amended. There were no objections. (Prevailed 5-0)
Pass5:0 Roll call Meeting details Not available
6/11/20240 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available
Number
240276
Version
SUBSTITUTE 1
Reference
220075
Sponsor
THE CHAIR
Title
Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $1,315,385 for a total estimated cost of $1,526,400.
Analysis
This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held. The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements. The City cost of these projects approved by this resolution is estimated to be $1,315,385. The total estimated cost of these projects is $1,526,400.
Body
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

1st Aldermanic District

N. 30th St. - W. Atkinson Ave. to W. Hampton Ave. (ST211220209) File Number 220075: Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (24’ width of tree border area), grading, storm drainage facilities, and green infrastructure as necessary. (Assessable Reconstruction Paving Fund -- $41,570; Nonassessable Reconstruction Paving Fund -- $495,000). The total estimated cost for this project including the requested amount is $560,000. This project is anticipated to be completed during the 2024 construction season.

2nd Aldermanic District

N. 58th St. - W. Villard Ave. to W. Custer Ave. (ST211240107) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $4,855; Nonassessable Reconstruction Paving Fund -- $1,000). The total estimated cost for this project including the requested amount ...

Click here for full text