powered help
header-left header-center header-right
File #: 191521    Version: 0
Type: Resolution Status: Passed
File created: 1/9/2020 In control: HISTORIC PRESERVATION COMMISSION
On agenda: Final action: 2/10/2020
Effective date:    
Title: Resolution relating to a Certificate of Appropriateness for replacing the roof at 1218 E. Brady Street, in the Brady Street Historic District, for Pat Suminski.
Sponsors: THE CHAIR
Attachments: 1. Application.pdf, 2. Extension on 191521 until June 30 2021, 3. Photos.pdf, 4. Roof Diagram.png, 5. Staff Report Roof.pdf, 6. Letter to the Local Council Member, 7. Letter to Property Owner, 8. Letter to Property Owners Within 200 Feet, 9. List of Property Owners Within 200 Feet, 10. Certified Mailing to the Property Owner, 11. Signed Certified Mail Receipt, 12. Signed Certified Mail Receipt - Suminski, 13. Appeal Rights Letter, 14. Certified Mailing to the Property Owner, 15. Signed Certified Mail Receipt, 16. Signed Certified Mail Receipt - Suminski, 17. Certificate of Appropriateness
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
2/10/20200 HISTORIC PRESERVATION COMMISSION ADOPTED

Minutes note: Mr. Tim Askin said there are two proposals; one the applicant would like and the other staff would prefer. All of the photos are from the 1950s, although the building was built in 1913; there is no information on the roof materials. There has been metal tile in the front roof area since 1950 and the rest of the roof is asphalt shingle. There is a plain chimney, which staff is fine with its removal. Proposal 1 is Landmark shingle with a reddish brown color for the entire roof. Staff is fine with the materials and color. Proposal 2 is the Landmark shingles for the rear areas and new metal tile in the front in the red tones that best coordinate with the asphalt shingle. Staff recommends allowing chimney removal and proposal 2 with the option of using the metal tile for the entire roof. The metal tile is on the roof's front facade. Chris Wichgers - contractor - the metal tiles are three times the cost of the shingles. Mr. Jarosz moved for approval of proposal 2, with tile on the front slope, and shingle on the rest of the roof.
Pass5:0 Action details Meeting details Video Video
1/9/20200 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

Number

191521

 

Version

ORIGINAL

 

Reference

 

Sponsor

THE CHAIR

 

Title

Resolution relating to a Certificate of Appropriateness for replacing the roof at 1218 E. Brady Street, in the Brady Street Historic District, for Pat Suminski.

Drafter

CC-CC

Tim Askin

1/8/2020