powered help
header-left header-center header-right
File #: 201063    Version:
Type: Resolution Status: Passed
File created: 11/24/2020 In control: COMMON COUNCIL
On agenda: Final action: 12/15/2020
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $1,210,800 for a total estimated cost of $1,285,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS, SPECIAL ASSESSMENTS
Attachments: 1. Proof of Publication
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
12/28/20201 MAYOR SIGNED   Action details Meeting details Not available
12/15/20201 COMMON COUNCIL ADOPTEDPass15:0 Action details Meeting details Video Video
12/2/20201 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Mary Dziewiontkoski - DPW 7th Aldermanic District W. Vienna Ave. – N. 35th St. to N. 41st St. (ST211140134) Concrete pavement reconstruction and asphalt pavement resurfacing, replace all curb and gutter, sidewalk and driveway approaches, sodding (8’ width of tree border area), grading, and tree removal where necessary. Ald. Borkowski moved approval. (Prevailed 4-0) N. 37th St. – W. Marion St. to W. Congress St. (ST211180192) Asphalt pavement resurfacing, replace all curb and gutter, replace sidewalk and driveway approaches where needed, sodding (8’ width of tree border area), grading, and tree removal where necessary. Ald. Perez moved approval. (Prevailed 4-0) 15th Aldermanic District N. 22nd St. – W. Meinecke Ave. to W. Wright St. (ST211190135) Concrete pavement reconstruction, replace all curb and gutter, sidewalk and driveway approaches, sodding (8’ width of tree border area), grading, and tree removal where necessary. Ald. Stamper moved approval. (Prevailed 4-0)
Pass4:0 Action details Meeting details Video Video
11/24/20200 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

Number
201063
Version
SUBSTITUTE 1
Reference
120856
Sponsor
THE CHAIR
Title
Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $1,210,800 for a total estimated cost of $1,285,000.
Analysis
This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held. The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements. The City cost of these projects approved by this resolution is estimated to be $1,210,800. The total estimated cost of these projects is $1,285,000.
Body
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

7th Aldermanic District

W. Vienna Ave. - N. 35th St. to N. 41st St. (ST211140134) File Number 120856: Concrete pavement reconstruction and asphalt pavement resurfacing, replace all curb and gutter, sidewalk and driveway approaches, sodding (8’ width of tree border area), grading, and tree removal where necessary. (Assessable Reconstruction Paving Fund -- $16,100; Nonassessable Reconstruction Paving Fund -- $675,000). The total estimated cost of this project including the requested amount is $740,000. This project is anticipated to be completed during the 2021 construction season.

N. 37th St. - W. Marion St. to W. Congress St. (ST211180192) File Number 171709: Asphalt pavement resurfacing, replace all curb and gutter, replace sidewalk and driveway approaches where needed, sodding (8’ width of tree border area), grading, and tree removal where necessary. (Assessable Reconstruction Paving ...

Click here for full text