File #: 200920    Version:
Type: Resolution Status: Passed
File created: 11/4/2020 In control: COMMON COUNCIL
On agenda: Final action: 11/24/2020
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $548,400 for a total estimated cost of $583,400.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS, SPECIAL ASSESSMENTS
Attachments: 1. Signed Letter 4.pdf, 2. Official Ad Cycle 4.pdf
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
12/2/20201 MAYOR SIGNED   Action details Meeting details Not available
11/24/20201 COMMON COUNCIL ADOPTEDPass15:0 Action details Meeting details Video Video
11/11/20201 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Mary Dziewiontkoski - DPW 8th Aldermanic District W. Cleveland Ave. – S. 20th St. to S. 27th St. (ST211190142) Asphalt pavement resurfacing, replace all curb and gutter, replace sidewalk and driveway approaches where necessary, sodding ( 7’ and 15’ width of tree border area), and grading. Ald. Zamarripa moved approval. (Prevailed 5-0) 14th Aldermanic District S. Ellen St. – S. Kinnickinnic Ave. to S. Delaware Ave. (ST211200135) Install traffic calming speed hump(s). Ald. Stamper moved approval. (Prevailed 5-0)
Pass5:0 Action details Meeting details Video Video
11/4/20200 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

Number
200920
Version
SUBSTITUTE 1
Reference
190284
Sponsor
THE CHAIR
Title
Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $548,400 for a total estimated cost of $583,400.
Analysis
This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held. The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements. The City cost of these projects approved by this resolution is estimated to be $548,400. The total estimated cost of these projects is $583,400.
Body
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

8th Aldermanic District

W. Cleveland Ave. - S. 20th St. to S. 27th St. (ST211190142) File number 190284: Asphalt pavement resurfacing, replace all curb and gutter, replace sidewalk and driveway approaches where necessary, sodding (7’ and 15’ width of tree border area), and grading. (Assessable Reconstruction Paving Fund -- $39,000; Nonassessable Reconstruction Paving Fund -- $500,000). The total estimated cost of this project including the requested amount is $575,000. This project is anticipated to be completed during the 2021 construction season.

14th Aldermanic District

S. Ellen St. - S. Kinnickinnic Ave. to S. Delaware Ave. (ST211200135) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $7,400; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost of this project including the requested amount is $9,400. This project is anticipated to...

Click here for full text