Resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $50,000 for a total estimated cost of these projects being $1,525,000.
Analysis
This resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed. After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable. A resolution will be submitted after the Public Hearing authorizing construction. The City cost for engineering these projects is estimated to be $50,000 with the total cost estimated to be $1,525,000.
Body
Resolved, By the Common Council of the City of Milwaukee that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:
10th Aldermanic District
N. 60th St.-W. Wells St. to W. Valley Forge Dr. (Sponsored by the city of Wauwatosa) (ST211190101). Concrete pavement reconstruction replace all curb and gutter, replace sidewalk and driveway approaches as necessary, sodding and grading. (Non-assessable Reconstruction Paving Fund--$5,000). The total cost of this project is estimated to be $125,000. This project is anticipated to be completed during the 2019 - 2020 construction season.
Various Aldermanic Districts
Sidewalk Replacement - Area Wide 2018 (ST230180155): Laying concrete walk. Doing all necessary grading pertaining to said work. (Nonassessable Sidewalk Reconstruction Paving Fund -- $ 30,000). The total cost of this pro...