powered help
header-left header-center header-right
File #: 130686    Version:
Type: Resolution Status: Passed
File created: 9/24/2013 In control: COMMON COUNCIL
On agenda: Final action: 10/15/2013
Effective date:    
Title: Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $148,000 for a total estimated cost of these projects being $1,096,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
10/24/20131 MAYOR SIGNED   Action details Meeting details Not available
10/15/20131 COMMON COUNCIL ADOPTEDPass15:0 Action details Meeting details Not available
10/2/20130 PUBLIC WORKS COMMITTEE SUBSTITUTED

Minutes note: Individual present: Mary Dziewiontkowki - Dept. of Public Works Accept Proposed Substitute A
Pass4:0 Action details Meeting details Video Video
10/2/20131 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTIONPass4:0 Action details Meeting details Not available
9/26/20130 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
9/26/20130 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
9/26/20130 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
9/24/20130 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available
Number
130686
Version
Substitute 1
Sponsor
THE CHAIR
Title
Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $148,000 for a total estimated cost of these projects being $1,096,000.
Analysis
This resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed. After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable. A resolution will be submitted after the Public Hearing authorizing construction. The City cost for engineering these projects is estimated to be $148,000 with the total cost estimated to be $1,096,000.
Body
Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:

1st Aldermanic District

Alley between W. Capitol Dr., W. Hope Ave., N. 24th Pl., and N. 25th St. (ST212140136): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $18,000). The total estimated cost for this project including the requested amount is $190,000. This project is anticipated to be completed during the 2014 construction season.

5th Aldermanic District

N. 94th St. - W. Burleigh St. to W. Keefe Ave. (ST211130112): Paving the roadway with asphalt. Laying a concrete curb and gutter. Laying concrete sidewalk. Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $9...

Click here for full text