File #: 250401    Version:
Type: Resolution Status: Passed
File created: 6/24/2025 In control: COMMON COUNCIL
On agenda: Final action: 7/15/2025
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $1,152,500 for a total estimated cost of $1,509,500.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS, SPECIAL ASSESSMENTS
Attachments: 1. AD Signed.pdf, 2. Letter Signed.pdf, 3. AD 14.pdf, 4. Notice published 8/1/2025
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
7/18/20251 MAYOR SIGNED   Action details Meeting details Not available
7/15/20251 COMMON COUNCIL ADOPTEDPass15:0 Action details Meeting details Video Video
7/2/20250 PUBLIC WORKS COMMITTEE AMENDED

Minutes note: 2nd Aldermanic District N. 89th St. – W. Silver Spring Dr. to W. Carmen Ave. (ST211240144) Asphalt pavement resurfacing, replacing curb and gutter, driveway approaches and sidewalk where necessary, sodding (6’ width of tree border area), tree removal as necessary and grading. 5th Aldermanic District N. 88th St. – W. Concordia Ave. to W. Townsend St. (ST211250116) Install traffic calming speed hump(s). W. Hope Ave. – N. 81st St. to N. 84th St. (ST211250117) Install traffic calming speed hump(s). 7th Aldermanic District N. 41st St. – W. Congress St. to W. Ruby Ave. (ST211250118) Install traffic calming speed hump(s). N. 45th St. – W. Center St. to W. Hadley St. (ST211250119) Install traffic calming speed hump(s). 12th Aldermanic District S. 10th St. – W. Lapham Blvd. to W. Orchard St. (ST211250132) Install traffic calming speed hump(s). S. 12th St. – W. Lapham Blvd. to W. Greenfield Ave. (ST211250125) Install traffic calming speed hump(s). 15th Aldermanic District W. Cherry St. – a point east of N. 32nd St. to N. 35th St. (ST211210127) Concrete pavement reconstruct, replacing curb and gutter, driveway approaches and sidewalk where necessary, permeable pavers installed in the parking lanes, narrowing sidewalk from 6’ to 5’, sodding (6’ width of tree border area), tree removal as necessary and grading.
Pass5:0 Action details Meeting details Video Video
7/2/20251 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTIONPass5:0 Action details Meeting details Not available
6/24/20250 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available
Number
250401
Version
SUBSTITUTE 1
Reference
231908
Sponsor
THE CHAIR
Title
Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $1,152,500 for a total estimated cost of $1,509,500.
Analysis
This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held. The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements. The City cost of these projects approved by this resolution is estimated to be $1,152,500. The total estimated cost of these projects is $1,509,500.
Body
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

2nd Aldermanic District

N. 89th St. - W. Silver Spring Dr. to W. Carmen Ave. (ST211240144) File Number 231908: Asphalt pavement resurfacing, replacing curb and gutter, driveway approaches and sidewalk where necessary, sodding (6’ width of tree border area), tree removal as necessary and grading. . (Assessable Reconstruction Paving Fund -- $27,500; Nonassessable Reconstruction Paving Fund -- $472,500). The total estimated cost for this project including the requested amount is $650,000. This project is anticipated to be completed during the 2025-2026 construction season.

5th Aldermanic District

N. 88th St. - W. Concordia Ave. to W. Townsend St. (ST211250116/ST221250720) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $3,300; Nonassessable Reconstruction Paving Fund -- $1,500; Traffic Calming Assessment Offset -- $2,100). The total estimated cost for this pro...

Click here for full text