File #: 210302    Version:
Type: Resolution Status: Passed
File created: 6/15/2021 In control: COMMON COUNCIL
On agenda: Final action: 7/7/2021
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $875,100 for a total estimated cost of $946,100.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS, SPECIAL ASSESSMENTS
Attachments: 1. Official Notice 14.pdf, 2. Signed letter 14.pdf, 3. Signed AD14.pdf, 4. Notice published 7/23/2021
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
7/23/20211 CITY CLERK PUBLISHED   Action details Meeting details Not available
7/15/20211 MAYOR SIGNED   Action details Meeting details Not available
7/7/20211 COMMON COUNCIL ADOPTEDPass15:0 Action details Meeting details Not available
6/23/20211 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Mary Dziewiontkoski - DPW 9th Aldermanic District W. Clinton Ave. – N. 76th St. to point west of N. 76th St. (ST211190208) Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (5’ width of tree border area), and grading. Ald. Perez moved approval. (Prevailed 5-0) N. 53rd St. – W. Cody St. to the cul-de-sac north (ST211210195) Install traffic calming speed hump(s). Ald. Borkowski moved approval. (Prevailed 5-0) 10th Aldermanic District W. Philip Pl. – N. 58th St. to N. 60th St. (ST211200124) Concrete pavement reconstruction, replace sidewalk and driveway approaches where necessary, sodding (8’ width of tree border area), and grading. Ald. Stamper moved approval. (Prevailed 5-0) 11th Aldermanic District W. Fernwood Cir. – (West) W. Honey Creek Dr. to W. Honey Creek Dr. (ST211200119) Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (8’ width of tree border area), and grading. Ald. Borkowski moved approval. (Prevailed 5-0) 13th Aldermanic District W. Whitaker Ave. – S. 20th St. to S. Louisiana Ave. (ST211200125) Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (8’ width of tree border area), and grading. Ald. Zamarripa moved approval. (Prevailed 5-0) 15th Aldermanic District W. Lloyd St. – N. 12th St. to N. 14th St. (ST211210182) Install traffic calming speed hump(s). Ald. Stamper moved approval. (Prevailed 5-0) W. Meinecke Ave. – N. 19th St. to N. 20th St. (ST211210183) Install traffic calming speed hump(s). Ald. Stamper moved approval. (Prevailed 5-0) W. Wright St. – N. 47th St. to N. 49th St. (ST211210184) Install traffic calming speed hump(s). Ald. Stamper moved approval. (Prevailed 5-0) N. 12th St. – W. Hadley St. to W. Locust St. (ST211210175) Install traffic calming speed hump(s). Ald. Stamper moved approval. (Prevailed 5-0) N. 40th St. – W. Hadley St. to W. Locust St. (ST211210178) Install traffic calming speed hump(s). Ald. Stamper moved approval. (Prevailed 5-0) N. 44th St. – W. Wright St. to W. Clarke St. (ST211210179) Install traffic calming speed hump(s). Ald. Stamper moved approval. (Prevailed 5-0) N. 46th St. – W. Clarke St. to W. Center St. (ST211210180) Install traffic calming speed hump(s). Ald. Stamper moved approval. (Prevailed 5-0) N. 47th St. – W. Meinecke Ave. to W. Wright St. (ST211210181) Install traffic calming speed hump(s). Ald. Stamper moved approval. (Prevailed 5-0)
Pass5:0 Action details Meeting details Video Video
6/15/20210 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available
Number
210302
Version
SUBSTITUTE 1
Reference
191262
Sponsor
THE CHAIR
Title
Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $875,100 for a total estimated cost of $946,100.
Analysis
This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held. The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements. The City cost of these projects approved by this resolution is estimated to be $875,100. The total estimated cost of these projects is $946,100.
Body
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

9th Aldermanic District

W. Clinton Ave. - N. 76th St. to point west of N. 76th St. (ST211190208) File Number 191262: Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (5’ width of tree border area), and grading. (Assessable Reconstruction Paving Fund -- $45,100; Nonassessable Reconstruction Paving Fund -- $265,000). The total estimated cost of this project including the requested amount is $330,000. This project is anticipated to be completed during the 2021-22 construction season.

N. 53rd St. - W. Cody St. to the cul-de-sac north (ST211210195) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $4,000; Nonassessable Reconstruction Paving Fund -- $3,000). The total estimated cost of this project including the requested amount is $7,000. This project is anticipated to be completed during the 2021 constructi...

Click here for full text