powered help
header-left header-center header-right
File #: 111576    Version:
Type: Resolution Status: Passed
File created: 3/20/2012 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 4/11/2012
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $2,836,900 for a total estimated cost of $3,184,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS, STREET IMPROVEMENTS
Attachments: 1. Official Notice Number 93 Committee Actions, 2. Official Notice Number 93, 3. Cover Letter, 4. Hearing Notice List, 5. Notice Published 4-27-12
Number
111576
Version
SUBSTITUTE 1
Reference
061097
Sponsor
THE CHAIR
Title
Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $2,836,900 for a total estimated cost of $3,184,000.
Analysis
This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held. The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements. The City cost of these projects approved by this resolution is estimated to be $2,836,900. The total estimated cost of these projects is $3,184,000.
Body
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

2nd Aldermanic District

W. Florist Ave. - N. 68th St. to N. 76th St. (ST211070124) File Number 061097: Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (0-7 foot width of tree border area), and grading. (Assessable Reconstruction Paving Fund -- $59,000; Nonassessable Reconstruction Paving Fund -- $500,000). The total estimated cost for this project including the requested amount is $635,000. This project is anticipated to be completed during the 2012 construction season.

3rd Aldermanic District

E. Back Bay - A point east of N. Terrace Ave. to N. Terrace Ave. (ST211110128) File Number 111280: Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (1-7 foot width of tree border area), and grading. (Assessable Reconstruction Paving Fund -- $3,000; Nonassessable Reconstr...

Click here for full text