File #: 230604    Version: 0
Type: Resolution Status: Passed
File created: 9/1/2023 In control: COMMON COUNCIL
On agenda: Final action: 9/19/2023
Effective date:    
Title: Resolution directing the Commissioner of Public Works to execute two documents titled “Cost Sharing Memo of Understanding Between the City of Milwaukee and the City of Greenfield” for the design, construction, and construction engineering of the Powerline Trail Phase 2 project.
Sponsors: ALD. SPIKER
Indexes: GREEN SPACE, INTERGOVERNMENTAL AGREEMENTS
Attachments: 1. Cost Sharing Agreement Powerline Ph 2 Construction-FINAL.pdf, 2. Cost Sharing Agreement Powerline Ph 2 Design-FINAL.pdf, 3. Resolution Comptroller's Certification 2980-22-70, 4. Resolution Comptroller's Certification 2980-22-00
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
9/28/20230 MAYOR SIGNED   Action details Meeting details Not available
9/19/20230 COMMON COUNCIL ADOPTED

Minutes note: Ald. Spiker added as the sponsor.
Pass14:0 Action details Meeting details Video Video
9/7/20230 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Kate Riordan - DPW
Pass5:0 Action details Meeting details Video Video
9/1/20230 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available
Number
230604
Version

Reference
190517
Sponsor
ALD. SPIKER
Title
Resolution directing the Commissioner of Public Works to execute two documents titled “Cost Sharing Memo of Understanding Between the City of Milwaukee and the City of Greenfield” for the design, construction, and construction engineering of the Powerline Trail Phase 2 project.
Analysis
This resolution directs the Commissioner of Public Works to execute two documents titled “Cost Sharing Memo of Understanding Between the City of Milwaukee and the City of Greenfield” for the cost sharing of the design, construction, and construction engineering of the Powerline Trail Phase 2 from S. 51st Street to S. 35th Street (Greenfield) and S. 60th Street to S. 51st Street (Milwaukee) in the 11th Aldermanic District with a total estimated cost of the project to be $1,233,258, with a grantor share of $1,055,492, and a local of $147,538, of which the City’s share is $39,836 and the City of Greenfield’s share is $107,702.

Body
Whereas, The City of Greenfield and the City of Milwaukee received grant funds from the Wisconsin Department of Transportation’s (WisDOT) Congestion Mitigation and Air Quality (CMAQ) grant program (WisDOT Project ID 2980-22-00/70) and the Wisconsin Department of Natural Resource’s Recreation Funding (WDNR Project Number SADLP3221385); and

Whereas, The Department of Public Works shall notify the Common Council of the City of Milwaukee of project cost overruns and changes in scope approved by the Department of Public Works; and

Whereas, The Common Council of the City of Milwaukee recognizes that the City may be 100 percent liable for project cost overruns and changes in scope as approved by the Department of Public Works; and

Whereas, the City of Greenfield has constructed the Powerline Trail from S. 104th Street to South 60th Street; and

Whereas, The 2010 Milwaukee by Bike Plan recommended the South Side Powerline Trail as a proposed new off-street trail; and

Whereas, Th...